You are on page 1of 1

IN COMPLETED WORK -SEWERAGE NETWORK PROGRESS STATUS AS OF 17-01-2024 OF PARCEL-1

KEY PLAN
N

RD_MC_01
RD_15
RD_11

RD_14
RD_13
RD_10 NOTES:

RD_02
1. ALL DIMENSIONS ARE IN MILLIMETER UNLESS NOTED OTHERWISE.

RD_12
LEGEND

LEGEND:
LOWERING
EXCAVATION
PIPE LAYING
FORMATION
RD_MC_04 BACK FILL INPROGRESS
BACK FILL COMPLETED

RD_14

RD_15
MANHOLE WALL COMPLETED
RD_02

RD
RD_13
MANHOLE BASE COMPLETED

_M
C_
RD

0
HC BASE & WALL INSTALL

1
_0
9
RD_MC_05
HOUSE CONNECTION EXCAVATION
RD_11
RD_10

RD_12
HOUSE CONNECTION COMPLETED

RD
REMAINING MANHOLES

_0
8
0 1
M C_
D_

RD
R

RD

_0
_0

9
7
01
C_
_M
RD

RD
_0
6
Rev. Description Prepared By Reviewed By Approved By Date
RD_MC_02 1

RD
_0
MC CLIENT

_0
_
RD

8
RD
_0
5

RD
01

_0
C_
_M

7
RD CONSULTANT
RD_03
RD_02

RD
RD_01

_0
4

RD
01
C_

_0
M
D_

6
R

MAIN CONTRACTOR
RD
_0
5

RD_MC_01
RD
_0

INFRASTRUCTURE CONTRACTOR
4

SIMI-CONTRACTING L.L.C
RD

P.O.Box.No. 126406, Dubai, U.A.E


_MC

TEL. 04-2364869 FAX:04-2364869


_0
3

PROJECT

INFRASTRUCTURE WORKS OF
PARCEL-1 AT "SANTORINI" CLUSTER
RD_03
RD_02
RD_01

AT "DAMAC LAGOONS" MASTER


DEVELOPMENT
DRAWING TITLE

SEWERAGE NETWORK
PROGRESS LAYOUT PLAN

DRAWING NO : REVISION NO:

TITLE
SUBMISSION DATE : SCALE :