You are on page 1of 1

KEY PLAN

ce
Project fen
E=513360.616
N=2787665.682 E=513364.370

ce
en
tf
jec
N=2787656.165

ce
E=513995.715 E=513341.142 E=513357.256

Pro
Project fen
10.22
E=513975.966 N=2787208.859 N=2787648.689 10.12 N=2787655.042
N=2787208.539 19.75

2.50

3.62
1.94

3.58
I I'

7.01
C C'
19.51

7.61
E=513976.031 E=513995.537 E=513338.571
11.19 E=513348.176 D D'
N=2787206.600 N=2787206.365 N=2787646.237 N=2787640.587
TRIAL TRENCH NO. 21
Plan TRIAL TRENCH NO. 10

Proposed Fence
Plan
10.14

Proposed Fence
ROW

ROW
E=513975.966 E=513995.715
2.70 16.00
E=513357.256
N=2787208.539 N=2787208.859
E=513341.142
N=2787648.689
E=513357.256
N=2787655.042
E=513354.149 N=2787653.426
NGL
NGL N=2787663.074
Depth of trail pit

19.52
Excavation

pit Excavation
Depth of trail
10.65
1.5

Width of trail pit Excavation

1.5
Width of trail pit Excavation

Proposed Fence

ROW
Excavation lvl
Excavation lvl
1.5 16.00
E=513364.370
E=513360.616
N=2787656.165
N=2787665.682

10.06 7.04 NGL (43.511)

pit Excavation
18.7

1.04
Depth of trail
10.18
TRIAL TRENCH NO. 10

1.5
17.50 Width of trail pit Excavation
TRIAL TRENCH NO. 21 Water line
Section Section C-C' Excavation lvl

TP 21 TP 10 TRIAL TRENCH NO. 11


Section 17.5
undary

undary
ce

fence
Project fen

E=513360.783
Project Bo

E=513373.623 E=513363.671

Project Bo

Project
N=2787434.819 N=2787434.632 E=513351.683 N=2787533.563
12.88
N=2787532.779
12.05
2.26

12.55
2.99

2.80
B B'

2.38
A A'
12.57
E=513361.042 E=513373.640 11.69 E=513363.621
N=2787431.844 N=2787432.239 E=513351.907 N=2787530.707
N=2787530.412 TRIAL TRENCH NO. 09
TRIAL TRENCH NO. 08 Plan
PLAN

Project Boundary

Proposed Fence

ROW
Project Boundary

Proposed Fence

ROW

3.63 9.07 3.9 8.4


E=513351.683 E=513363.671
N=2787532.779 N=2787533.563

Telecom line
E=513360.783 E=513373.623
N=2787434.819
Telecom line

N=2787434.632 NGL
NGL

0.91
pit Excavation
Depth of trail
11.87

1.5
0.91

Width of trail pit Excavation


pit Excavation
Depth of trail

12.55
1.5

Width of trail pit Excavation


Excavation lvl
Excavation lvl

1.53
2.46 6.73 12.3
0.44 7.74 12.7

TRIAL TRENCH NO. 09 00 FOR APPROVAL AH MZ MZ 20-11-23


TRIAL TRENCH NO. 08 Section A-A' Prepared By
Section Rev. Description Reviewed By Approved By Date

TP 09 TP 11 CLIENT NAME:
undary

PROJECT MANAGER:

Project Boundary
ce
Project Bo

Project fen
ce
Project fen

E=513555.870
N=2787790.179
8.22
E=513559.937 E=513610.620 E=513617.516
N=2787783.032 N=2787768.500 N=2787775.437
9.79

TP 08

2.34
CONSULTANT:

2.70
F F'
5.46

3.94

D D'
10.21 E=513619.349
E=513452.476 E=513612.400
Project fence

N=2787773.968
N=2787703.480 N=2787766.494
E=513446.268 8.95 E=513556.847
N=2787711.632 E=513551.239 N=2787780.512 TRIAL TRENCH NO. 14 MAIN CONTRACTOR
10.23 N=2787787.397 Plan
3.39
1.77

Project Boundary

J J'

Proposed Fence

Project Boundary
ROW
9.94 2.50
15.2
PROJECT
E=513449.322
Proposed Fence

ROW

E=513610.620
E=513444.795 TRIAL TRENCH NO. 11 N=2787768.500 E=513617.516

N=2787701.854 16.3 N=2787775.437

N=2787710.703 Plan E=513555.870


10.09
Width of trail pit Excavation NGL (43.61)
CONSTRUCTION & MAINTENANCE

225 Dia GRE water line


E=513559.937
N=2787790.179 N=2787783.032
5.20 0.68

pit Excavation
Depth of trail
OF 432 RESIDENTIAL UNITS IN

1.30
0.3

1.5
NGL (43.24)

WADI ALAMARDI.
Proposed Fence

pit Excavation
Depth of trail

8.55
ROW

Excavation lvl
1.5

Width of trail pit Excavation

2.1 17.6 Excavation lvl


E=513446.268 E=513452.476
N=2787711.632 N=2787703.480 DRAWING TITLE
NGL (43.90)
17.70 6.33
150 Dia GRE water line

Trail pit sections


pit Excavation
Depth of trail

10.04
1.20

TRIAL TRENCH NO. 14


1.5

Width of trail pit Excavation


TRIAL TRENCH NO. 13 16.00
Section
Excavation lvl Section
Sheet-01
7.35 19.70
TRIAL TRENCH NO. 11 DRAWING NO : REVISION NO:
Section
MBRHE-432-SP-00-SD-GE-000-GA002 00

TP 12 TP 13 TP 14 SUBMISSION DATE :

19-12-2023
SCALE :

NTS

You might also like