1. System description
1.1 System task
DC system provides DC power supply to signal equipment, protection and automatic
devices, emergency lighting, emergency power, and circuit breaker opening and
closing operations.
The loads of DC system are very important and the reliability requirement of the
power supply is very high. The reliability of DC system is one of the decisive factors
to ensure the safe operation of power plant.
Powerhouse DC supply system
The voltage of DC system of Zungeru Hydro Power Station is DC110V and the
system provides power for control, protection, SCADA, etc., also provides
accident backup power for the accident lighting system.
1.2 System composition
The DC power supply system of Zungeru Hydro Power Station is composed of
four 110V DC power supply systems, each DC system operates independently:
(1) One 110V DC power supply system of the unit.
(2) One 110V DC power supply system of public utility.
(3) One 110V DC power system of switch yard.
(4) One 110V DC power system in dam area.
Powerhouse DC supply system
System setting
AC
AC undervoltage
AC setting AC Supply Two-line Overvoltage 276V 204V
setting point
setting point
Switching bus Switching bus
Overvoltage 125V undervoltage 95V
setting point setting point
DC setting
Controlling bus Controlling bus
overvoltage 125V undervoltage 95V
setting point setting point
Controlling 1881 Temperature
Auto Battery capacity Yes
method Ah compensation
Equalizing Float charge
150.48A 37.62A
Battery setting charge trigger trigger
Per
Charging Timing-Equalizing Equalizing charge
188。1A 2160 Per 10 hs
current limit charge time
hs
Powerhouse DC supply system
Communicati
Address 0 Data rate 2400 Protocol CDT91
on setting
Password Default password for system configuration :12345
setting Default password for system operation :12345
System operation
Equal
izing
Charging Float charge charg
Float charge 117V 122V
method voltage e
volta
ge
Insulation parameter settings
Grounding
11KΩ
resistor
Powerhouse DC supply system
Communicati
Address 0 Data rate 2400 Protocol CDT91
on setting
Password Default password for system configuration :12345
setting Default password for system operation :12345
System operation
Equal
izing
Charging Float charge charg
Float charge 117V 122V
method voltage e
volta
ge
Insulation parameter settings
Grounding
11KΩ
resistor
Powerhouse DC supply system
System setting
AC
AC setting AC Supply Two-line Overvoltage 276V AC undervoltage 204V
setting point setting point
Switching bus Switching bus
Overvoltage 125V undervoltage 95V
setting point setting point
DC setting
Controlling bus Controlling bus
overvoltage 125V undervoltage 95V
setting point setting point
Controlling 700A Temperature
Auto Battery capacity Yes
method h compensation
Equalizing Float charge
64A 16A
Battery setting charge trigger trigger
Per
Charging Timing-Equalizing 2160 Equalizing charge
80A Per 10 hs
current limit charge time
hs
Powerhouse DC supply system
Communication
Address 0 Data rate 2400 Protocol CDT91
setting
Password Default password for system configuration :12345
setting Default password for system operation :12345
System operation
Equalizing
Charging Float charge
Float charge 117V charge 122V
method voltage
voltage
Insulation parameter settings
Grounding
11KΩ
resistor
Powerhouse DC supply system
System setting
AC Overvoltage AC undervoltage
AC setting AC Supply Two-line 276V 204V
setting point setting point
Switching bus Switching bus
Overvoltage 130V undervoltage 115V
setting point setting point
DC setting
Controlling bus Controlling bus
overvoltage 130V undervoltage 115V
setting point setting point
Controlling Temperature
Auto Battery capacity 267Ah Yes
method compensation
Battery setting
Equalizing Float charge
21.36A 5.34A
charge trigger trigger
Powerhouse DC supply system
m) Noise: ≤55dB
n) Power factor: ≥0.9
o) Comprehensive efficiency: ≥90%
p) Quantity of chargers: 2 sets
q) Module number of single chargers: 7+2 modules (7 is basic modules, 2 is additional
modules)
When the duty power supply fails or the voltage fluctuation range exceeds the specified
value, the working power supply will be automatically switched undisturbed to standby
power supply. The unit DC system consists of two (2) groups of battery banks, two (2)
charging cabinets, two (2) main feeder cabinets, one (1) bus coupler cabinet. Each unit is
equipped with one DC feeder cabinet and one inverter power cabinet.
1.4.1.1 System structure
(1) The 110V DC system of the unit adopts the wiring mode of single bus sectional
coupling. One bus-tie circuit breaker is set between the two sections of DC bus.
During normal operation, the bus-tie circuit breaker is OFF. When a charger fails or
the battery is replaced, the DC loads in this circuit can be transferred to another
section of DC bus. The DC power supply system is equipped with two groups of
battery banks and charging / floating charging devices. In normal operation, each bus
section is connected with one group of battey banks and one set of charging floating
charging devices. Two sections of bus operate separately.
Powerhouse DC supply system
(2) Two (2) 415VAC power supplies are respectively input from AC input circuit
breakers QA11 and QA12. After two AC power supplies are switched by ATS,
the contactors KMA11 or KMA12 output one circuit of 415VAC to 9 charging
modules (UPR101~UPR109), and output DC 110V power supply after
rectification. DC110V power supply comes from DC bus section I through
charger output circuit breaker CK11 and provides power to each load.
Two (2) 415VAC power supplies come respectively from AC input circuit
breakers QA21 and QA22. After the AC dual power supply is switched by ATS,
the contactor KMA21 or KMA22 outputs one circuit of 415VAC to 9 charging
modules (PR201~UPR209) and then outputs DC 110V power supply after
rectification. DC110V power supply is connected to DC bus section II through
charger output circuit breaker CK21 to provide power to each load.
Powerhouse DC supply system
(3) Two groups of battery banks are provided. Each group is composed of 52 pieces of 2V
batteries connected in series. The capacity is 1881Ah. They are respectively connected
to 2 sections of DC bus. In normal operation, the battery banks are floating charged.
When the charger is out of operation, the battery can provide DC power to the bus
through circuit breaker QB1 (QB2).
The battery banks can be discharged periodically for test through the discharge device.
The on / off of the discharge circuit is controlled by the discharge circuit breaker
QDC1(QDC2).
Each battery bank is equipped with a set of battery monitoring units for online real-time
monitoring of all batteries. The charger can directly charge the battery through the circuit
breaker CK12/CK22. Circuit breakers CK11 and CK12 are mechanically interlocked and
cannot be closed at the same time. Circuit breakers CK21 and CK22 are mechanically
interlocked and cannot be closed at the same time.
(4) Two main monitoring units are installed in the DC system and one unit is for each section
of bus. The main monitoring unit can monitor the operation status of DC system online.
Powerhouse DC supply system
(5) One set of insulation monitoring unit ZHIM1(ZHIM2) is installed for each section
of bus for on line detection of insulation state of DC system to ground, and can
automatically detect the fault circuit. The insulation monitoring unit
communicates with the main monitoring unit.
(6) Bus-tie circuit breakers MK1 and MK2 are installed between the two sections
of bus. During normal operation, both bus-tie circuit breakers are OPEN.
When the charger or No.1 battery of section I bus is maintained or out of
operation due to fault, the bus-tie breaker MK1 can be CLOSED, the loads are
powered by section II DC bus. When section II charger or No.2 battery is
maintained or out of operation due to fault, the bus-tie breaker MK2 can be
CLOSED, the loads are powered by section I DC bus.
Powerhouse DC supply system
ZHIM1 ZHIM2
QC101-Q105 Insulation Monitoring Insulation Monitoring QC201-Q105
QC106-Q110 绝缘巡检仪器 绝缘巡检仪器 QC206-Q110
QC114-QC118 QC214-QC218
QC111-Q113 QC211-Q113
FU1 FU2
LC1+ LC2+
LC1- LC2-
FU1 FU2
UV13 QB1 MK1 MK2 QB2 UV23
4-20mA 4-20mA
V PV13 V PV23
0-300VDC 0-300VDC
L12+ L22+
L12- L22-
SD SD
QDC1 QDC2
CK11 CK12 CK22 CK21
PA11 PA21
PV11 V FU1 UV12 PV12 FU2 UV22 PV22 V PV21
RS11 A RS21 A
V V
UV11 UA11 UA21 UV21
FU1 FU2
L11+ PA12 UA12 PA22 UA22 L21+
L11- L21-
RS12 A RS22 A
UPR101-UPR109 UPR201-UPR209
QPR101-QPR109 QPR201-QPR209
FUB11 FUB12 Unit DC Coupling Cubicle FUB21 FUB22
A1 00BUA03 A2
B1 B2
C1 C2
N1 N2
QFV1 KMA11 KMA12 KMA21 KMA22 QFV2
FV1 1750Ah 1750Ah FV2
QA11 QA12 QA21 QA22
机组直流系统原理图
Schematic diagram of unit DC power supply system 00BUA01~03,00BTL01~02
Powerhouse DC supply system
(7) Each generator unit is equipped with one DC feeder cabinet. The DC power cabinet of the
generator unit is equipped with two sections of DC bus. One bus-tie circuit breaker is set
between the two sections of DC bus. The power comes from DC main feeder cabinet. The
output circuit is evenly distributed and connected to two sections of DC bus. Each section of
bus is equipped with an insulation monitoring extension unit for on line detection of insulation
state of DC system to ground, and automatically detect the fault circuit. The insulation
monitoring extension unit communicates with the main insulation monitoring unit on the DC
main feeder cabinet of the generator unit.
MK1 MK2
Q13-Q24
QC101-QC112 QC201-QC212 Q101-Q124
Q25-Q28
QC113-QC124 QC213-QC224 Q201-Q212
T2 T2 T2
T2 T2 T2
T2 T2
T5 T5
Q125 Q225
T5 T5 T4 T4 T2 T2
T2 T2
QD1 MK QD2
Single line diagram of Unit
UPS system
Powerhouse DC supply system
Powerhouse DC supply system
T6 T6
Each circuit breaker circuit is equipped with an indicator, To display the opening
and closing status of each circuit breaker. The cabinet is also equipped with
lighting and temperature control circuits. See Fig. D-ME-DC01-026 R1 for
detailed components of bus-tie circuit breaker cabinet.
(4) No.1, No. 2, No. 3, No. 4 unit DC feeder cabinets
[10BUA01/20BUA01/30BUA01/40BUA01]
The DC feeder cabinet includes the following main components:
Each feed out line is equipped with indicator to display the status of each feed
out power supply. The cabinet is also equipped with lighting and temperature
control circuits. See D-ME-DC01-033 R1 for detailed components of DC feeder
cabinet of the unit.
Powerhouse DC supply system
(2) Two 415VAC power supplies come respectively from AC input circuit breakers QA11 and
QA12. After two AC power supplies are switched by ATS device, one circuit of 415VAC is
output by contactor KMA11 or KMA12 to 6 charging units (UPR101~UPR106), provides DC
110V power supply after rectification. DC110V power supply is output to section I DC bus
through charging device output circuit breaker CK11 to provide power to each load. Two
415VAC power supplies are respectively input by AC input circuit breakers QA21 and QA22.
After two AC power supplies are switched by the ATS device, the contactor KMA21 or
KMA22 outputs one circuit of 415VAC to six charging units (UPR201~UPR206) and outputs
DC 110V power after rectification. DC110V power supply is output to DC bus section II
through charging device output circuit breaker CK21 to provide power to each load.
(3) 2 groups of batteries are provided. Each group is composed of 52 pieces of 2V batteries
connected in series. The capacity is 1256Ah. They are respectively connected to two
sections of DC bus. In normal operation, the batteries are floating charged. When the
charging unit is out of operation, the batteries can provide DC power to the bus through
circuit breaker QB1 (QB2).
Powerhouse DC supply system
The batteries can be discharged periodically for test through the discharge device. The
on / off of the discharge circuit is controlled by the discharge circuit breaker
QDC1(QDC2). Each group is equipped with a set of battery monitoring units. All
batteries are detected online. The charger can directly charge the battery through
the circuit breaker CK12 (CK22). Circuit breakers CK11 and CK12 are mechanically
interlocked and cannot be closed at the same time. Circuit breakers CK21 and
CK22 are mechanically interlocked and cannot be closed at the same time.
(4) Two main monitoring units are installed in the DC system, one set for each section
of bus. The main monitoring unit can monitor the operation status of the system
online.
(5) One set of insulation monitoring unit ZHIM1(ZHIM2) is installed for each section of
bus for on line detection of insulation state of DC system to ground, and can
automatically detect the fault circuit. The insulation monitoring unit is communicated
with the main monitoring unit.
Powerhouse DC supply system
(6) Bus-tie circuit breakers MK1 and MK2 are installed between the two sections of bus.
During normal operation, both bus-tie circuit breakers are OFF. When the charger
and No.1 group of batteries of section I bus are maintained or out of operation due
to failure, bus-tie circuit breaker MK1 can be put into ON position, the loads are
powered by section II DC bus. When the charger and No.2 group of batteries of
section II bus are maintained or out of operation due to failure, bus-tie circuit
breaker MK2 can be put into ON position, the loads are powered by section I DC
bus.
(7) The public utility DC system is equipped with an emergency lighting inverter power
cabinet, which is equipped with one set of AC240V AC buses. The output of the
inverter is connected to the bus and the AC load is distributed by the bus. The
inverter has two input circuits, one circuit is from DC 110V and the other is from the
station service AC 240V system of the power station. Under normal conditions, the
loads are powered by AC 240V (AC power in priority). The loads are switched to DC
power supply without interruption in case of AC power fault. When the inverter and
rectifier fail but the AC power is in good condition, the AC power supply directly
supplies the power to the loads through the bypass circuit breaker.
Switch Model 开关型号 S202MDC Switch Model 开关型号 T4N250 Switch Model 开关型号 S202MDC Switch Model 开关型号 T4N250
Rated Current 额定电流 10|25|50A Rated Current 额定电流 80|200A Rated Current 额定电流 10|25|50A Rated Current 额定电流 80|200A
Cable Section 电缆截面 Cable Section 电缆截面 Cable Section 电缆截面 Cable Section 电缆截面
Feed Ln.No.馈线编号 Feed Ln. No. 馈线编号 Feed Ln. No. 馈线编号 Feed Ln. No. 馈线编号
ZHIM1 ZHIM2
QC101-Q125 Insulation Monitoring Insulation Monitoring
QC137 QC201-Q225 QC237
QC126-Q132 绝缘巡检仪器 绝缘巡检仪器 QC226-Q232
QC138-QC139 QC238-QC239
QC133-Q136 QC233-Q236
FU1 FU2
LC1+ LC2+
LC1- LC2-
FU1 FU2
UV13
4-20mA
QB1 MK1 MK2 QB2 UV23
4-20mA
V PV13 V PV23
0-300VDC 0-300VDC
L12+ L22+
L12- L22-
SD SD
QDC1 QDC2
Common DC 1# Charger Cubicle
00BTL11
CK11 CK12 CK22 CK21 Common DC 2# Charger Cubicle
00BTL12
PA11 PA21
PV11 V FU1 UV12 PV12 FU2 UV22 PV22 V PV21
RS11 A RS21 A
V V
UV11 UA11 UA21 UV21
FU1 FU2
L11+ PA12 UA12 PA22 UA22 L21+
L11- L21-
RS12 A RS22 A
UPR101-UPR106 UPR201-UPR206
ZHM1 ZHM2
QC101-QC112 QC101-QC112 QV01-QV03
QC113-QC124
MK1 MK2 QC113-QC124
UPR101-UPR106 UPR201-UPR206
QC125-QC135 QC125-QC135
UIV
QC138-QC139 QC138-QC139
QDC1 QDC2
Powerhouse DC supply system
There are several indicators on the cabinet to display the working status of AC incoming line
charging cabinet fault and other information, The cabinet is also equipped with lighting and
temperature control circuits. See D-ME- DC02-008 R1 for detailed components of No.1 charging
cabinet. See D-ME- DC02-017 R1 for detailed components of No. 2 charging cabinet.
(2) No.1 and No.2 feeder cabinets [00BUA11/00BUA12]
The main components of the feeder cabinet are as follows:
Powerhouse DC supply system
Each feeder is equipped with an indicator to display the status of each output
power. The cabinet is also equipped with lighting and temperature control
circuits. See D-ME- DC02- 012 R1 for detailed components of No.1 feeder
cabinet. See D-ME- DC02- 021 R1 for detailed components of No 2 feeder
cabinet.
Each circuit breaker circuit is equipped with indicator to display the opening and
closing status of each circuit breaker. The cabinet is also equipped with lighting
and temperature control circuits. See Fig. D-ME- DC02-026 R1 for detailed
components of bus-tie circuit breaker cabinet.
Each charging cabinet is composed of several charging units. The charging unit is
configured in N + 1 backup mode, that is, on the premise that the capacity of N charging
units can meet the needs of battery charging current and regular load current, another
charging unit is added. During operation, each module will automatically provide power in
equalizing current. When the rated current is provided, the current equalizing unbalance
will not be bigger than ± 5% of the rated current. When any charging unit fails, the faulty
charging unit exits automatically and the system sends a fault signal. The power module
can be plugged and replaced with electricity. The replacement process shall not affect the
system operation. The device has the function of self-recovery after power failure.
The charging unit has the functions of self diagnosis, self detection, self recovery and self
adjustment etc. It can work independently without relying on the main monitoring unit and
has the function of floating charge in offline (the centralized monitoring unit loses control
function).
Powerhouse DC supply system
Each charging unit has internal monitoring function and can control and adjust the
output voltage and current independently without relying on the main monitoring unit. It
also has the protection functions and alarm functions of AC three-phase input phase
loss, rectifier output overvoltage, under voltage, overcurrent, current limiting, short
circuit, overheating and so on. When the charging unit fails, the system can
automatically separate the fault unit from the system without affecting the normal
operation of the system. In normal work, the charging unit communicates with the main
monitoring unit and accepts its instructions.
1.5.2 Main monitoring unit
The main tasks of the main monitoring unit are: Long-term automatic monitoring on
each functional unit and battery in the DC power system, getting the various operating
parameters and states in them, and processing the parameters in real-time based on
measurement data and operating status, controlling the system based on these
parameters, realizing fully automated and precise management on the power system,
ensuring the continuity, safety and reliability of its work.
Powerhouse DC supply system
The power monitoring system adopts modular structure and is the central part of DC
power monitoring, control, management and communication. It can overall monitor AC
input unit, charge unit, battery bank and feeding output.
The output voltage and current limit of the charging module can be
continuously adjusted locally or remotely.
Monitoring the voltage and current of each DC output, status of each feed
output circuit breaker, fuse, insulation and step-down module, sending out
audible and visual alarm in case of abnormal conditions.
Monitoring battery voltage and charge / discharge current: According to the
charging characteristics and characteristics of the battery, controlling the
charger to charge automatically the battery and change the charging mode.
Online monitoring of the state of the single battery. The discharge and
charging voltage are automatically compensated with temperature.
Monitoring the input, output voltage and working status of the
communication module: When the module fails, the monitoring system emits
an audible and visual alarm signal. In addition, parameters such as floating
charge and equalized charging voltage of the communication module can be
configured.
Powerhouse DC supply system
Displaying the running curve in real time and monitoring the voltage and
current waveform of each measuring point. Saving the discharge curve and
data. Checking the historical discharge curve.
USB ports can read and write USB flash disk to realize software upgrade or
file backup function.
1.5.3 Insulation monitoring unit
The insulation monitoring unit can monitor the insulation status of bus and feeder
branches and give alarm when the insulation is reduced. The monitoring data and
signals are transmitted to the main monitoring unit through the communication
ports.
The insulation monitoring unit monitors the voltage and insulation resistance of
positive and negative DC buses to grounding in real time. When the insulation
resistance to ground of positive and negative DC buses is lower than the set alarm
value, it automatically starts the branch inspection function.
Powerhouse DC supply system
Showing historic data and recording the circuit number, polarity, grounding resistance,
date and time of the grounding fault, which are available at any time and will not be lost
after power-off of the device.
4)The circuit breakers CK11 and CK21 of the charger output of No.1 and No.2 charging
cabinets to the bus are OFF. The circuit breakers CK12 and CK22 of the charger output
to the battery groups are OFF.
5)Each feeder circuit breaker of the main feeder cabinet shall be ON and OFF according
to the load requirements.
6)The DC input circuit breakers QD1 and QD2 of the DC power cabinets of each unit are
ON, and the bus-tie circuit breaker MK1 is "OFF". Each feeder circuit breaker is ON or
OFF according to the load requirements. The insulation monitoring unit is put into
operation.
7)Inverter power cabinet of each unit, DC input circuit breaker QD1, AC input circuit
breaker QA1 and inverter output circuit breaker QA2 are ON. Bypass circuit breaker
QA3 is OFF. Each feeder circuit breaker shall be ON or OFF according to the load
requirements.
Powerhouse DC supply system
3) The output circuit breaker QB1, QB3 of No.1 battery group are "ON". The output circuit breaker
QB2, QB4 of No. 2 battery group are "OFF". The bus-tie circuit breaker MK2 is "ON". The bus-
tie circuit breaker MK1 is "OFF". The battery discharge circuit breakers QFD1 and QFD2 are
"OFF".
4) DC output circuit breaker CK11 of No.1 charging cabinet is ON and QK12 is OFF. DC output
circuit breaker of No.2 charging cabinet is "OFF", that is, CK21 and CK22 are at "OFF" position.
5) Each feeder circuit breaker of main feeder cabinet shall be ON or OFF according to the load
requirements.
6) DC power cabinet of each unit is normally put into operation.
7) Inverter power cabinet of each unit is normally put into operation.
2)Two main monitoring units, two insulation monitoring units and two battery
monitoring units of DC power supply system are put into operation.
3)The output circuit breakers QB1, QB2, QB3 and QB4 of the battery groups are in the
"ON" position. Bus-tie circuit breakers MK1 and MK2 are in the "OFF" position. The
battery discharge circuit breakers QDC1 and QDC2 are in "OFF" position.
4)The circuit breakers CK11 and CK21 of the DC output of No.1 and No.2 chargers to
the bus are ON. The circuit breakers CK12 and CK22 of the charger output to the
battery groups are OFF.
5)Each feeder circuit breaker of feeder cabinet shall be ON or OFF according to the
load requirements.
6) In the emergency lighting inverter power supply cabinet, DC input circuit breaker
QD1, AC input circuit breaker QA1 and inverter output circuit breaker QA2 are ON.
Bypass circuit breaker QA3 is OFF. Each feeder circuit breaker shall be ON or OFF
according to the load requirements.
Powerhouse DC supply system
4)DC output circuit breaker CK11 of No.1 charging cabinet is ON and QK12 is OFF.
DC output circuit breaker of No.2 charging cabinet is "OFF", that is, CK21 and CK22
are at "OFF" position.
5)Each feeder circuit breaker of feeder cabinet shall be ON or OFF according to the
load requirements.
6)The emergency lighting inverter power cabinet is normally put into operation.