Professional Documents
Culture Documents
A B C D
A B C D
03 6750 6750 03
A-106
A-106 A B C D
3125 475 2650 3125 475 2650
03 6750
0.150 A-106
W.W.L. 3125 475 2650
W01 W01
LEGEND
1 1 1
LP
W1 W1
D2 W1
W1
W1 RD W1. 200 mm BLOCK
6050
DOWN SPOUT
PRAYER ROOM
G01
0.150 W2. 150 mm BLOCK
W.W.L.
3540
W1
4550
4550
0.300 W02 W02 W02
F.F.L TRAINING HALL
glass ( as per typical details )
SL
F01
OO
A A A
P
A-103 6050 A-103 A-103
W4. 100 mm BLOCK
2%
W1
0.150 W1
W2 W1
W.W.L.
9100
2 2 2
D2 DRIVER LOUNGE
3930
G02
3105
3105
3105
W02
W02 W02
14650
0.300
04 F.F.L 02 04 02 04 02
W01
A-107 6050 A-107 A-107 A-107 A-107 A-107
15300
15300
15300
01 W1
W2 W1 W1 HP
A-111
3 3 3
2500
JAN.
LOBBY W1
D5 W3 006
G03
D2
W2
01 6050
A-110 D1
02 W2 02
A-111 A-110
2900
3345
3345
3345
D5 BB D4
W3 0.300 A-103 KITCHEN O.T.A O.T.B
F.F.L
F03 W1
1365
TOILET
KS
1950 STAIR
CURTAIN
W01 WALL
D5
2700
G05 F02
W3 0.150
0.300
F.F.L W.W.L.
CORRIDOR
2%
F06
4 4 D3 4
P
6900
OO
W2
D5 W3
SL
W1
W2
0.150 02 1360
W.W.L. A-112 1970
MALE TOILET D3
D5 W3 W03 F05
4000
4000
D3
3800
3800
3800
W2
D5
1350
W3
W1 FEMALE TOILET DOWN SPOUT
2500 F04
D3 2420
D5 STAIR
W1
W03
W1
PROJECT NAME:
3500 G04
W1 W1 W1 W1 LP
2000 W2
W01
W01
RD CONSTRUCTION OF CUSTOMS
5 5 5
BUILDINGS IN THE SHIPPING
YARD
0.150
W.W.L. 01 PROJECT NO: BUILDING NO : 126
A-106
01 CLIENT:
01 A-106
A-106
CONTRACTOR:
DRAWING TITLE: