00 31-May-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Compaction Testing SAIC-A-1005 15-Jul-18 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Note: To verify that the area/ material being inspected was tested by SA
approved third party testing agency, the test results attached with this RFI
shall be verified by the relevant PID inspection unit if copy of the test
results had been received directly from the third party lab. If not available
in the PID Inspection Unit, the inspector shall contact the third party
laboratory representative and request for an explanation. If the
explanation is not reasonable, NCR shall be issued to the third party lab
through the Batch Plant and Civil Testing Group.
One Modified Proctor Test per ASTM D1557 with corresponding Proctor
SAES-A-114
A2 curve shall be performed for each type of fill material or where there is a
Sec. 6.4.1.1
change in the type or the source of material.
Nuclear density gauges, when used, shall have a valid calibration SAES-A-114
A7
certificate per the requirement of ASTM D6938, Sec. 8. Sec. 3.2