Distribution Substation Ss.40462, Fp-01: Notes
Distribution Substation Ss.40462, Fp-01: Notes
GOLF
310+580.326
DISTRICT
GDW-01
GOLF
COURSE
WEST
213593.8
GCR-01
RESIDEN
06
TIAL
T 1/6 R50
T 1/6 R50
RESIDENTIAL
WFR-03
WATERFRONT
212097.142
T 1/6 R50
T 1/6 R50
WATERFRONT
FR0M 11kV
211+092.967
WFR-02
RESIDENTIAL
SWITCHGEAR,
GSD-03
05
R
1
6/
T
DISTRICT
GOLF
GSD-03
612+030.712
GOLF
T 1/6 R50
DISTRICT
GDS-02
611+233
.550
T 1/6 R50
S/S 40462
FOX
412+321.9
FXH-05
HILLS 87
WATERFRONT
210046.655
WFR-01
RESIDENTIAL
GOLF
GDS-01
610+485.
DISTRIC
738 T
T
1/6
R50
R50
1/6
T
EDUCATION
510+844.130
EDD-03
MEDICAL
DISTRICT
312+728.251
MEC-01
DISTRICT
T 1/6 R50
T 1/6 R50
T 1/6 R50
T 1/6 R50
FOX
411+843.970
FXH-04
HILLS
T 1/6 R50
DISTRICT
EDUCATION
EDD-02
313+342.335
WATERFR
112+416.57
WFC-04
ONT
T 1/6 R50
COMMER
5
T 1/6 R50
CIAL
411+337.899
FOX
FXH-03
HILLS
05R 6/1 T
EDUCATION
R50
1/6
T
314+176.193
EDD-01
05R 6/1 T
DISTRICT
WATERFRONT
111+799.483
WFC-03
CENTRAL
COMMERCIAL
810+000.000
PZC-01
PZC-01
PLAZA
NORTH
BOULEVARD
BLN-01
810+921.731
T 1/6 R50
R50
1/6
T
410+850.520
FOX HILLS
FXH-02
NORTH
BLN-02
BOULEVARD
811+264.678
810+911.858
BLS-01SOUTH
BOULEVARD
T 1/6 R50
811+254.805
T 1/6 R50 BLS-02 SOUTH
BOULEVARD
05R 6/1 T
05R 6/1 T
T 1/6 R50
T 1/6 R50
T 1/6 R50
WATER
T 1/6 R50
05R 6/1 T
05R 6/1 T
T 1/6 R50
FRONT
111+19
WFC-02
COMME
6.254
RCIAL
05R 6/1 T
410+355.752
FOX HILLS
FXH-01
05R 6/1 T
WATERF
RONTWFC-01 .935
ENERGY
512+678.033
EC2-01
110+786
COMME
CITY
RCIAL
QATAR
ENTERTAINMEN
110+231.879
QEC-02
S/S 40462
T CITY
TX-1
Sn= 1600kVA
11/0.433 kV
(OIL TYPE)
z=(6.00%)
7x1c 800mm²
FEEDER PILLAR-1 (LOCATED INSIDE THE SS)
(INDOOR TYPE)
TCL = 3154 kVA
TO BE 3C 16mm²
MDL = 1995 kVA
DMDL = 1277 CONNECTED TO VD=0.9% NOTES:
kVA AUX. SUPPLY DB-SS - THE LOCATION OF PRIVATE SUBSTATIONS ARE
(10kW) INDICATIVE ONLY. THE EXACT LOCATION SHALL BE
FINALIZED DURING RESPECTIVE BP PROCESSING.
- ALL 11KV CABLES ARE 3C-300mm² XLPE+ FO CABLES.
THE 3C-300mm² CABLES ARE LAID AT A SPACING OF
FEEDER PILLAR AS PER 50CM THUS REDUCING THE CURRENT CARRYING
KAHRAMAA SPECIFICATION
CAPACITY TO THAT OF 3C-240mm².
2500A; 40kA, 1 sec; 415V, 3Ph+N+E, - IN ALL SECONDARY SUBSTATION FEEDER BREAKERS
50Hz. Cu BUSBAR SHALL BE PROVIDED WITH DIRECTIONAL
F1 F2 F3 F4 F5 F6 OVER CURRENT AND DIRECTIONAL EARTH FAULT
HRC HRC HRC HRC HRC HRC PROTECTION (TYPE4).
355 355 355 355 355 355
STRIP FUSE WAY STRIP FUSE WAY STRIP FUSE WAY STRIP FUSE WAY STRIP FUSE WAY STRIP FUSE WAY - THE LOCATION OF ALL ELECTRICAL EQUIPMENT SUCH
SIZE 3 SIZE 3 SIZE 3 SIZE 3 SIZE 3 SIZE 3 AS FEEDER PILLAR, KWHR METER, SERVICE CABINET,
MINI PILLAR ETC, ARE INDICATIVE ONLY. THE EXACT
LOCATION WILL BE AS PER THE AS-BUILT DRAWINGS.
4C 300
4C 300
4C 300
4C 300
4C 300
114m
127m
113m
25m
64m
- IN CASE DETAILS/ MATERIALS ON THE DRAWINGS
3m 3m 3m
CONTRADICT WITH KM STANDARDS AND
SPECIFICATION, THEN THE LATER SHALL PREVAIL.
150A 4C 70
150A 4C 70
150A 4C 70
- COMPLETE DISTRIBUTION DESIGN RESPONSIBILITY TO
4C 300
4C 300
4C 300
16m
SPARE
16m
16m
THE INFRASTRUCTURE CONSULTANT.
kWh 3m kWh 3m kWh 3m - CLIENT TO APPOINT A KM APPROVED
CONTRACTOR TO EXECUTE WORK AT SITE.
VD=0.28%
VD=0.90%
VD=1.55%
150A 4C 70
150A 4C 70
150A 4C 70
- TARIFF METERING FOR ALL LUSAIL PROJECTS ARE AT
TCL=166 kVA MDL=105kVA
105
- LV CABLES ARE LAID AT A SPACING OF 40CM.
4C 300
4C 300
4C 300
21m
21m
21m
REF: Ca-01-0022
REF: Cb-01-0010
REF: Ca-01-0229
kWh kWh kWh - ALL PERMANENT SECONDARY SUBSTATIONS ARE
VD=0.41%
VD=1.09%
VD=1.74%
INDOOR TYPE.
166
- ALL 11KV SWITCHGEARS SHOULD BE KM STANDARD
TCL=166 kVA MDL=105kVA
150A 4C 70
150A 4C 70
150A 4C 70
REF: Ca-01-0021
REF: Ca-01-0245
REF: Ca-01-0230
MENTIONED IN THE APPROVAL LETTER REF.NO.
4C 300
4C 300
4C 300
16m
16m
2m
VD=1.25%
VD=1.90%
150A 4C 70
150A 4C 70
4C 300
4C 300
4x 6W FSFP, WITH NATURAL VENTILATION,
TCL= kVA MDL= kVA
2m
2m
STANDALONE AT GROUND FLOOR.
105
PE PE
REF: Ca-01-0020
REF: Ca-01-0244
REF: Ca-01-0231
kWh kWh
INFRASTRUCTURE PROJECT.
VD=1.31%
VD=1.97%
ALL MATERIAL & LABOR BY CLIENT.
166
REF: Ca-01-0243
REF: Ca-01-0232
4C 300
3m 3m
150A 4C 70
150A 4C 70
Las sa e : Tue, 3 Oc 2023 08:21 am
4C 300
4C 300
16m
16m
kWh 3m kWh 3m
LUS-CP28B-QDSBG-DWG-EL-01304-005
VD=1.57%
VD=1.74%
150A 4C 70
150A 4C 70
TCL=166 kVA MDL=105kVA
4C 300
21m
21m
REF: Cb-01-0009
REF: Ca-01-0242
kWh kWh
VD=1.76%
VD=1.93%
TCL=166 kVA MDL=105kVA
3m 3m
150A 4C 70
150A 4C 70
REF: Ca-01-0246
REF: Ca-01-0241
4C 300
4C 300
16m
16m
kWh 3m kWh 3m
CAD Re : e ec bs01 R a Scheme LUSAIL 4-415-2023 4-415-2023-P36-P131.
VD=1.92%
VD=2.09%
150A 4C 70
150A 4C 70
4C 300
4C 300
TCL=166 kVA MDL=105kVA
2m
2m
PE PE
REF: Ca-01-0247
REF: Ca-01-0240
kWh kWh
VD=1.98%
VD=2.15%
TCL=166 kVA MDL=105kVA
REF: Ca-01-0239
AA For/
HW
MM
ZONE: 69
4-415-2023
0 40/158