You are on page 1of 1

MATCHLINE - FOR CONTINUATION REFER TO DWG NO: LUS-CP28B-QDSBG-DWG-EL-01201-018 KEY PLAN:

Aa-01-0112 Aa-01-0113 Aa-01-0114 Aa-01-0115 Aa-01-0116 Aa-01-0117 Aa-01-0118


MDL=146 MDL=146 MDL=146 MDL=146 MDL=146 MDL=146 MDL=146
4C 120mm² 4C 120mm² 4C 120mm² 4C 120mm² 4C 120mm² 4C 120mm² 4C 120mm²
F13/40472 F13/40472 F14/40472 F14/40472 F15/40472 F15/40472 F16/40472
200A 200A 200A 200A 200A 200A 200A

SIKKA/OPEN SPACE
300m
001 002 003 004 005 006 007 008

LAID
BLES S
PHASE-3

R
C
0.09

009 010 011 012 013 014 015 016 017


+1
STOP
BUS

E
4

IN LAY
x
OS-01-0059

6
PHASE-1 PHASE-4

STOP
BUS
0.09

A
018 019 020 021 022 023 024 025 026 027

C
PHASE-2 0.09

V
STOP
BUS

L
149
028 029 030 031 032 033 034 035 036 037

EVC-ND1-08
MDL=100
4C 70mm² OS-01-0061
Aa-01-0165 Aa-01-0164 Aa-01-0163 Aa-01-0162 Aa-01-0161 Aa-01-0160
F12/40472 MDL=146 MDL=146 MDL=146 MDL=146 MDL=146 MDL=146
150A 4C 120mm² 4C 120mm² 4C 120mm² 4C 120mm² 4C 120mm² 4C 120mm²
F11/40472 F11/40472 F10/40472 F10/40472 F9/40472 F9/40472

MATCHLINE FOR CONTINUATION REFER TO DWG NO: LUS-CP28B-QDSBG-DWG-EL-01201-029


200A 200A 200A 200A 200A 200A

8x4C 300mm²
28 6x4C 300mm²
NOTES:
- THE LOCATION OF PRIVATE SUBSTATIONS ARE
N 410700 INDICATIVE ONLY. THE EXACT LOCATION SHALL BE
FINALIZED DURING RESPECTIVE BP PROCESSING.

7x4C 300mm²
26 6x4C 300mm²
- ALL 11KV CABLES ARE 3C-300mm² XLPE+ FO CABLES.
THE 3C-300mm² CABLES ARE LAID AT A SPACING OF
50CM THUS REDUCING THE CURRENT CARRYING
CAPACITY TO THAT OF 3C-240mm².
- IN ALL SECONDARY SUBSTATION FEEDER BREAKERS
S/S 40476 Ba-01-0050 Ba-01-0049 Ba-01-0048 Ba-01-0047 Ba-01-0046 Ba-01-0045
SHALL BE PROVIDED WITH DIRECTIONAL
MDL=126 MDL=126 MDL=126 MDL=126 MDL=126 MDL=126 OVER CURRENT AND DIRECTIONAL EARTH FAULT
4C 120mm² 4C 120mm² 4C 120mm² 4C 120mm² 4C 120mm² 4C 120mm² PROTECTION (TYPE4).


- THE LOCATION OF ALL ELECTRICAL EQUIPMENT SUCH

300m
F18/40476 F18/40476 F17/40476 F17/40476 F16/40476 F16/40476
PROPOSED LAY-BY AREA FOR
DIESEL GENERATOR SET REFUEL. 200A 200A 200A 200A 200A 200A AS FEEDER PILLAR, KWHR METER, SERVICE CABINET,

2x4C
ALTERNATIVE SHOWN SUBJECT
TO NOC FROM VODAFONE. MINI PILLAR ETC, ARE INDICATIVE ONLY. THE EXACT
LOCATION WILL BE AS PER THE AS-BUILT DRAWINGS.

5x4C 300mm²
OSED - IN CASE DETAILS/ MATERIALS ON THE DRAWINGS
PROP TED
CA
RELO GSM CONTRADICT WITH KM STANDARDS AND
m
10x10 PLOT
TOW E R SPECIFICATION, THEN THE LATER SHALL PREVAIL.
APPROXIMATE PROPOSED
- COMPLETE DISTRIBUTION DESIGN RESPONSIBILITY TO


POSITION OF DIESEL THE INFRASTRUCTURE CONSULTANT.

300m
GENERATOR SET REACHABLE
FROM LAY-BY AREA (15m MAX.) - CLIENT TO APPOINT A KM APPROVED

SIKKA/OPEN SPACE
OS-01-0060

C
CONTRACTOR TO EXECUTE WORK AT SITE.

5x 4
- TARIFF METERING FOR ALL LUSAIL PROJECTS ARE AT
THE LV SIDE, EXCEPT OTHERWISE STATED.
Ba-01-0001 Ba-01-0002 Ba-01-0003 Ba-01-0004 Ba-01-0005 Ba-01-0006
- LV CABLES ARE LAID AT A SPACING OF 40CM.
MDL=126 MDL=126 MDL=126 MDL=126 MDL=126 MDL=126
4C 120mm² 4C 120mm² 4C 120mm² 4C 120mm² 4C 120mm² 4C 120mm²
- ALL PERMANENT SECONDARY SUBSTATIONS ARE
F19/40476 F19/40476 F20/40476 F20/40476 F21/40476 F21/40476 INDOOR TYPE.
200A 200A 200A 200A 200A 200A - ALL 11KV SWITCHGEARS SHOULD BE KM STANDARD
WITH 31.5 KA/3SEC FAULT RATING.
1 7x4C 300mm² - THIS SCHEME IS SUBJECT TO ALL CONDITIONS
MENTIONED IN THE APPROVAL LETTER REF.NO.
EP/MO/3378/2023. DATED: 24-09-2023.
- ALL DISTRIBUTION SUBSTATIONS ARE STANDARD

5x4C 300mm²
20 5x4C 300mm²
17 DOUBLE INDOOR TYPE WITH 4x 1600 KVA OIL TYPE Tx,
4x4C 300mm² 4x 6W FSFP, WITH NATURAL VENTILATION,
STANDALONE AT GROUND FLOOR.

INFRASTRUCTURE PROJECT.
Ca-01-0461 Ca-01-0462 Ca-01-0463 Ca-01-0464 Ca-01-0465 Ca-01-0466 Ca-01-0467 Ca-01-0468 ALL MATERIAL LABOR BY CLIENT.
MDL=105 MDL=105 MDL=105 MDL=105 MDL=105 MDL=105 MDL=105 MDL=105 ALL COST TO CLIENT. NO COST TO KM.
4C 70mm² 4C 70mm² 4C 70mm² 4C 70mm² 4C 70mm² 4C 70mm² 4C 70mm² 4C 70mm²
N 410600
F8/40476 F8/40476 F8/40476 F8/40476 F7/40476 F7/40476 F7/40476 F7/40476
150A 150A 150A 150A 150A 150A 150A 150A
Last saved: Tue, 3 Oct 2023 09:23 am

LUS-CP28B-QDSBG-DWG-EL-01201-028
CAD Ref: \\elecdbs01\RoadScheme\LUSAIL\4-415-2023\ 4-415-2023-P132-P154.dwg

SUPPLY TO HUZOOM DISTRCIT PHASE 1


IN LUSAIL CITY
N 410500
LV CABLE ROUTING
E 226500

E 226600

E 226700

E 226800
AN/SSS 26-09-2023 1:500
YA HW

AA For/ MM

ZONE: 69
4-415-2023
0 149/158

IN CO-OPERATION WITH ALL GIS AGENCIES

You might also like