Projects for Beneficiary led Construction (New Construction)7C

1 Name of the State Punjab


2 Name of the City Moga
Beneficiary-Led Individual House Construction under
3 Project Name Pradhan Mantri Awas Yojana for 500 Dwelling Units
MC Moga @ 500 Locations in MC Moga.
4 Project Code* 03837060024N0
5 State Level Nodal Agency Department of Local Govt. Punjab
6 Implementing Agency / ULB Municipal Corporation Moga
Date of approval by State Level
7 Sanctioning & Monitoring Committee
(SLSMC)
If slum,
If Y, 1 if
whether it
Wheth notified, 2
No. of gets
Name of er if
benefi completel
8 No. of locations covered in the project Location Slum recognise
ciaries y
(Y/N) d and 3 if
rehabilitat
identified
ed Y/N
MC Moga 500 N NA NA
9 Project Cost (Rs. In Lakhs) 2082.0
Perso
Minor n with
No. of beneficiaries covered in the Gen SC ST OBC Total
10 ity Disabi
project lity
123 287 0 90 500 0 -
Whether beneficiary have been
11 selected as per PMAY guidelines? Yes
(Yes/No)
No. of houses constructed /acquired. Female Transgender
Joint (01) Male (03)
12 Please specify ownership (any of (02) (04)
these) - 401 99 -
Transgender
Male (01) Female (02)
13 No. of beneficiaries covered in project (03)
99 401 -
Whether it has been ensured that
14 selected beneficiaries have rightful Yes
ownership of the land
Whether building plan for all houses
15 Yes
have been approved
i) GoI grant required (Rs. 1.5 Lakh
per eligible Beneficiary (Rs. In 750.0
Lakh)
16 ii) State grant**, if any (Rs. In Lakh) 125.0
iii) ULB grant, if any (Rs. In Lakh) -
iv) Beneficiary Share (Rs. In Lakh) 1207.0
v) Total (Rs. In Lakhs) 2082.0
Whether technical specification/
design for housing have been ensured
17 Yes
as per Indian Standards /NBC / State
norms?
Whether it has been ensured that
balance cost of construction is tied up
18 Yes
with State grant, ULB grant &
beneficiary share?
Whether trunk and line infrastructure
is existing or being provisioned
i) Water Supply (Yes/No) Yes
ii) Sewerage (Yes/No) In Progress
iii) Road (Yes/No) Yes
iv) Storm Water Drain (Yes/No) No
19
v) External Electrification (Yes/No) Yes
vi) Solid Waste Management
In Progress
(Yes/No)
vii) Any Other, Specify -
viii) In case, any infrastructure has not
-
been proposed, reasons thereof
Whether disaster (Earthquake, Flood,
Cyclone, Landslide, etc.) resistant
20 Yes
features have been adopted in concept,
design and implementation?
Whether Demand Survey completed
21 Yes
for entire city?
Whether city-wide integrated project
22 have been formulated? If not, reasons Yes
thereof
Whether validation with SECC data
23 In Progress
for housing conditions conducted?
24 Whether Direct Benefit Transfer Yes
(DBT) of fund to individual bank
account of beneficiary ensured in the
project?
Whether there is provision in DPR for
tracking/monitoring the progress of
25 Yes
individual houses through geo-tagged
photographs?
Whether any innovative/ cost effective
26 /Green technology adopted in the No
project
Comments of SLAC after techno
27
economic appraisal of DPR
The project is Beneficiary-Led Individual House
Brief of project, including any other Construction under Pradhan Mantri Awas Yojana.
28 information ULB/State would like to The project consists of construction of 500 Dwelling
furnish Units @ 500 Locations in MC Moga.

*State will give code number to each project sanctioned under HFA as
‘ABCDEFGHIJKLM’ (Where, ‘AB’ is State Code as per census, ‘CDEFGH’ is City Code as
per census, ‘IJ’ is running number of project of the city and ‘K’ is project component code
i.e. ‘K’ will be 1 – for In-situ slum development, 2 – for Relocation, 3 – for AHP and 4 – for
Beneficiary Led Construction or enhancement, ‘L’ will be N – for new, R – for Revised, ‘M’
will be running number which will 0 for new and 1 and so on for revisions.
** Cost of infrastructure already provided on site by the state

It is herby confirmed that State/UT and ULB have checked all the beneficiaries as per
guidelines of HFA. It is also submitted that no beneficiary has been selected for more than
one benefit under the Mission including Credit Linked Subsidy Scheme (CLSS) component
of the Mission.

Signature Signature
(State Level Nodal Officer) (Principal Secretary)

Signature
(EO/Commissioner of ULB)

It is certified that this DPR has been prepared after verifying the credentials of each and every
beneficiary after the initial verification done by ULB.