Team Charter

Six Sigma Application to reduce variability on size of tablet drugs: Acetaminophen and Caffeine Tablets

Project Title

Expectation Example Team Rule


Attendance is required at all team
meetings. Changes in meeting times
Attendance
must be made at least 24 hours ahead Meetings will start at the agreed time; meetings will not
of time. wait for anyone.
Team members may not be substituted Everyone will give an opinion to contribute to the meeting
Participation
unless approved by team leader. development.
We will stay on task and on topic, using
the Project Charter as our guide. A
Focus There would be an agenda that the team will follow, each
meeting agenda will be publishedat
one could get a copy or we could project the agenda all
least one day in advance.
together.
Interruptions for emergencies only.
Interruptions
Phones turned to silent. Do not interrupt when someone is talking or presenting.
All deliverables are expected to be
Preparation completed in a timely manner. Each Team performance would be quantified and qualified
meeting will have a published agenda. weekly.
Meetings will begin promptly as
Timeliness
scheduled.
Meetings would start and end as scheduled.
We will choose the best decision-
making method for each situation. We
Decisions
will support decisions made by the
If there is any tie between options, we would prioritize
team.
objectives.

Data We will rely on data to make decisions.


We would definitely count on data to make decisions.
Team Charter
Six Sigma Application to reduce variability on size of tablet drugs: Acetaminophen and Caffeine Tablets

Project Title

Expectation Example Team Rule


We welcome honest disagreements, as
long as everyone is treated with Every individual conflict between team members would be
Conflict
respect. A facilitator will be used if ignored. Arguments would be attend by the team as a
conflict cannot be resolved. whole.

Other

Team Member Role Signature

Khai NQ Team Leader


Minh BC Team Member
Hai NX Team Member
Vy Team Member
Linh NTT Team Member
Team Charter
3. DATA COLLECTION PLAN
CTQ Metrics Collection Methods Analysis Tools Sampling Plan
Internal weight of Size mean of 0.500+- Nondestructive tests, Statistic mean, Interview technicians
tablet solid drugs 0.001 inches inspections Histograms, Inference performing the
process and take a
representative sample
of the day production.

4. PROCESS MAP

Operators performs the


Operators check the compression carefully
Ingredient powders are Cleaning of compression Operators collocate the
tools (main compression within the area of
get into the rotary tablet area: cams, ramps, dies, granuated feedstock in
roll, pre-compression weight control units,
machine. punches. punches
roll, etc.) which could lead to
defects of size.

5. HYPOTHESIS
The hypothesis is that the mean of the internal diameter of tablet drugs is different from 0.5 inches. So null and alternative
hypothesis would be:

H 0 : μ=0.500 inchesH a : μ ≠0.500 inches


Team Charter
6. REFLECTIONS ABOUT THE COURSE
In my way of thinking, this course has been extremely useful, which I have gained the fundamentals of the six-sigma
method, including:

- Six Sigma Principles: the basic components of Six Sigma and Lean: the principles, roles, responsibilities, and some
of the tools and metrics.
- Six Sigma Tools for Define and Measure: the advanced components of Six Sigma and Lean: the Define phase and
the Measure phase of the DMAIC (Define, Measure, Analyze, Improve, and Control) process with statistics and
project management tools.
- Six Sigma Tools for Analyze: the advanced components of Six Sigma and Lean: lean tools for process analysis,
introduction to basic statistics, the useful measure and analysis phase tools, and an overview of statistics as they
are related to the Six Sigma process.
- Six Sigma Tools for Improve and Control: the advanced components of Six Sigma and Lean: relationships from
data using correlation and regression as well as the different hypothesis terms in hypothesis testing; tools and
techniques for improvement; and the importance of a control plan, as well as its key characteristics, for maintaining
process improvements.

I appreciate all of the knowledge a lot. This series of Six Sigma Yellow Belt would help me a lot with the professional
developments in the journey to becoming an expert in the future. I believe that now I would be able to be part of a team
and use the gained knowledge to lay a strong foundation for my current job and other opportunities.