You are on page 1of 7

Stage Tool

WWW.TMOT.CA
STAGE CEMENTING
EQUIPMENT
TMOT stage-cementing systems provide cement integrity in wells that require
selective zonal isolation. Two-stage cementing techniques are the most common
of the multiple-stage cementing techniques, but a three-stage method can be
used. They are the tools of choice when drilling requirements call for proven
technology and low risk.
Multiple-stage cementing tools are recommended for the following circumstances:
Wells where the hydrostatic head of the cement is greater than the formation
pressure in some intervals but no other intervals
Heavier-weight cement would be required in the high-pressure formation sections
to maintain control of the well
When only certain portions of the wellbore require zonal isolation
In downhole conditions that require different slurry blends to address unique
challenges to each segment and achieve the intended zonal-isolation integrity

TYPE 750 SERIES STAGE COLLAR HYDRO-MECHANICAL


The type 750 Hydro-Mechanical Stage Collar is designed for maximum
operational flexibility. Able to operate both mechanically and hydraulically, type
750 can be installed in deviated or horizontal wells.

PERFORMANCE FEATURES
No welds are used on any portion of the tool
Robust locking mechanism
Consistent shifting pressure
Adjustable shifting pressure
Externally installed, noninterfering shear pins
PDC drillable
Tools can be made from material grades up to
135,000 psi minimum yield, including material
suitable for sour gas service
Standard seals rated for °15- to °400+ F and
suitable for sour service and high pressure gas
environments

OPTIONS
Metal to Metal Seals for high pressures (15,000
psi) and temperatures
Plug sets are available for three different
cementing applications
Tools can be manufactured with premium
connections, special clearance outside TYPE 750 HYDROMECHANICAL
diameters and special alloys for any application STAGE COLLAR

2
TECHNICAL DATA SHEET
The type 750 Stage Collar Hydro- open hydraulically at different opening
Mechanical has been designed for pressures. This is chieved through the
stage cementing applications where the addition or removal of the shear screws
operator wants flexibility over opening from the stage cementing tool. The
the stage collar. The design features changing of the opening pressure does
two internal sleeves that shift during the affect the force required to open the stage
stage cementing operations. collar mechanically if an opening dart is
The bottom sleeve can be shifted open subsequently used. Closing of the stage
through the use of hydraulic pressure or cementing collar is affected through the
by dropping a trip opening device and pumping of a closing plug behind second
allowing it to gravitate to the opening stage cement and applying pressure
seat. The stage collar can be field set to upon completing displacement.

SEQUENCE OF OPERATION
STEP 1: STEP 2H: STEP 2M: STEP 3:

3
STEP 1: STEP 2M:
Stage Collar in Running in and First Mechanical Opening - Opening Dart
Stage Cementing Position. First Stage landed in Stage Cementing Collar.
Shut-Off Plug will pass through Stage Opening Sleeve shifted to the open
CementingCollar while displacing first position allowing second stage cement
stage cement, landing on Baffle Plate to be displaced through ports.
located in Float Collar.

STEP 2H: STEP 3:


Hydraulic Opening - Opening sleeve Second Stage Cement Complete.
shifted down after opening through Second Stage Closing Displacement
the application of pressure, allowing Plug landed in Stage Cementing Collar.
second stage cement to be displaced The application of pressure will close
through ports. the Stage Collar Ports. Two-stage cement
job complete.

Note:Each stage collar is provided with a baffle plate, first stage flexible indicating
plug, opening trip dart and closing plug as standard equipment.

STAGE CEMENTING PLUG SYSTEM


A.TWO-STAGE CEMENTING (2 PLUG)
1st STAGE CEMENTING 2nd STAGE CEMENTING

1st STAGE SHUT-OFF PLUG 2nd STAGE 2nd STAGE


WITH RUBBER BAFFLE OPENING DART CLOSING PLUG
(Free Fall) (Pump Down)

B.TWO-STAGE CEMENTING WITH BAFFLE COLLAR (2 PLUG)

1st STAGE CEMENTING 2nd STAGE CEMENTING

1st STAGE SHUT-OFF BAFFLE 1st STAGE FLEXIBLE 2nd STAGE OPENING 2nd STAGE CLOSING
COLLAR SHUTOFF PLUG DART PLUG
(Pump Down) (Free Fall) (Pump Down)

4
C.TWO-STAGE CEMENTING (3 PLUG)

1st STAGE CEMENTING

1st STAGE BY-PASS PLUG 1st STAGE SHUT-OFF 1st STAGE FLEXIBLE
(Pump Down) BAFFLE COLLAR SHUT-OFF PLUG

2nd STAGE CEMENTING

2nd STAGE 2nd STAGE


OPENING DART CLOSING PLUG
(Free Fall) (Pump Down)
Mechanical
Opening Only

APPLICATIONS FOR CONTINUOUS PLUG SYSTEM


The cement must be brought up past a stage tool on the first stage to fill the entire
annulus with cement.
A hole deviated °25 or more off vertical at or above a stage tool.
Plug-opened stage tool is run with an integral packer above an open hole completion
above °25 deviation (The displacement opening plug can keep cement off the bottom of
the hole by opening the stage tool and setting the integral packer.)
Stage tool must be placed closer than 500 ft from the shutoff baffle, which could cause
excessively high opening pressure because of the need to compress the fluid in a closed
Free-Fall plug setup.
One advantage of the displacement method is that it can be continuous; once started,
uninterrupted pumping can continue until all stages have been completed.
Fluid volumes must be accurately calculated and carefully measured to help prevent
over displacement or under displacement of any of the stages, especially the first stage.

5
TABLE 1. PERFORMANCE SPECIFICATIONS
750 TECH DATA SHEET

Note: ALL CALCULATED VALUES ARE BASED FROM API-L80 MATERIAL

6
TECHMASTER
Calgary Office:
Bay5, 2115 27 Ave, NE Calgary, AB, Canada T3E 7E4
Tel: +1 403 713 1062 Fax: +1 403 713 1069
Edmonton Office:
2020, 10060 jasper Ave, Edmonton, AB, Canada T5J 3R8
Tel: +1 780 640 1056 Fax: +1 780 640 1057
www.tmot.ca info@tmot.ca

You might also like