Professional Documents
Culture Documents
Fluid
User's Manual
GH232-SC
August, 2011
Table of Contents
11
ZG103-35S CIRCULATING MANIFOLD OF DRILLING FLUID
1. Safety warnings
� Only trained and qualified persons can install, operate and maintain the mud
pump set with qualification certificates.
� Operators must read related operation manuals before operation and can
operate or maintain equipment after the familiarity with its functions and
operation.
� There shall be a chief principal designated for installation and maintenance,
the persons participating in work shall be assigned with clear work, and
detailed and reliable safety measures shall be available.
� In the operation process, strictly execute its operation specifications and
follow technical safety rules.
� Do not run equipment in the dark except that there are proper lighting
facilities.
� Persons on duty shall wear labor protection articles as required.
� The used lifter and handling equipment must adapt to related weight to be
operated.
� Make sure to release pressure to zero in disconnection of any high pressure
pipelines or hoses. Follow similar procedure during electrical equipment
connection; make sure power is off before maintenance.
� It is forbidden to maintain and repair equipment during its operation.
� Do not overload equipment.
1
ZG103-35S CIRCULATING MANIFOLD OF DRILLING FLUID
3 The standards
4 Technical parameters
Bore diameter: 4″
Max. working pressure: 35MPa
Hydraulic strength test: 53 MPa
Applicable temperature: -18°C ~+50°C(with Max. working pressure)
The height of gooseneck: 19m
The length of rotary hose: 23m
Weight: 6728kg
Working medium: clear water, drilling fluid, fracturing fluid and crude oil
ZG103-35S drilling fluid circulating manifold can carry out 4 work circulations
during the whole drilling operation.
5.1 During drilling circulation, the HP drilling fluid discharged from mud pump
gets into well bore through ground manifold, standpipe manifold of mast,
rotary hose, and top drive for drilling circulation operation.
5.2 During tripping out, the manifold, via 2″port of the control valve set on the
floor, is connected to well annulus space for mud-fill operation.
5.3 When you carry out well-killing operation, the 2″port of the control valve set
on the floor is connected to kill line, open the 2″control gate valve; the killing
operation can be done by mud pump.
5.4 When the mud pump is used for displacing mud reversely, connect the floor 2″
port to the entrance of wellhead cementing device, the mud pump injects the
mud into the wellhead by the gate valve control to displace the cement in the
well bore.
2
ZG103-35S CIRCULATING MANIFOLD OF DRILLING FLUID
3
ZG103-35S CIRCULATING MANIFOLD OF DRILLING FLUID
Fig.2:Ground manifold
1.90° bent pipe subassembly 2.S bent pipe subassembly 3. straight pipe subassembly
4. ground valve set 5. 2” union type mud valve gate 6. straight pipe subassembly
7.S bent pipe subassembly 8. straight pipe subassembly 9. hose:4.5m
10. welded male union 11. T-joint assembly 12. female union
8.1 When ZG103-35S drilling fluid circulation manifold is used for mud high pressure
circulation, its operation procedure is as the following (see Figure 3):
⑴When #1 drilling pump is used for drilling fluid circulation on drilling, turn on
the gate valves 2, 3, 4, and turn off the rest gate valves. The same with #2
drilling pump.
⑵When #1 drilling pump and #2 drilling pump are used for drilling fluid
circulation on drilling, turn on the gate valves 1, 2, 3, 4, and turn off the rest
gate valves.
5
ZG103-35S CIRCULATING MANIFOLD OF DRILLING FLUID
Gate
valve
Hose
Steel pipe
Pressure gauge
4
6
2
2号泵 No. 2 pump
1 5
9. Lubrication
10. Maintenance
10.1 Check if the split pin at each position is damaged at each well completion;
replace it if it is damaged.
6
ZG103-35S CIRCULATING MANIFOLD OF DRILLING FLUID
10.2 Check the corroded status of various pipe fittings every half a year; if there is any
seriously corroded, test its thickness with ultra-sonic device. Replace it timely if the
thickness is less than 15.2mm.
10.3 Clean and grease the whole set of the manifold once every 2 years.
10.4 Pay special attention to the trapezoid thread of each union, and prevent the
sealing surface from being damaged and prevent eye winker getting into pipe.
10.5 Maintain Z63Y-35 mud gate valves according to their manuals.
11.1 Trapezoid thread (union) can not be tightened: check if thread of each female
union (external trapezoid thread) is damaged, repair it with file (file away the bulge)
11.2 Serious vibration: check if any one of adjacent related pipe clamp and holder is
loose, tighten it timely if any.
11.3 Leakage: cut off the drilling fluid source which is concerned with leakage, check
if the union connection is tight, and tighten it as required. Then disconnect the union
connection, check if there are any seal rings damaged or aged. Replace them timely if
any.
11.4 Troubleshooting for mud gate valves should be done according to the manual of
the valve.
7
ZG103-35S CIRCULATING MANIFOLD OF DRILLING FLUID
For 4″Fig1003
1 O-ring φ145×10 30 pcs
Union
For 4″Fig1002
2 Union sealing ring 4″Fig1002 10 pcs
Union
For 2″Fig1502
3 Union sealing ring 2″Fig1502 4 pcs
Union
Welding metal-to-metal seal
4 ID4" 2 sets
mud gate valve ID4"
Welding metal-to-metal seal
5 ID2" 1 set
mud gate valve ID2"
Length as per
10 HP hose assembly 4”Fig1002/4.5m/35MPa 1 pc
API 7K
8
ZG103-35S CIRCULATING MANIFOLD OF DRILLING FLUID
Union sealing
2 4″Fig.1002 5 For 4″Fig1002 Union
ring
Union sealing
3 2″Fig.1502 5 For 2″Fig1502 Union
ring
9
ZG103-35S CIRCULATING MANIFOLD OF DRILLING FLUID
- 10 -
ZG103-35S CIRCULATING MANIFOLD OF DRILLING FLUID
SN Description Qty.
1 Manifold 1
2 Standpipe Clamp Seat 1 1
3 Clamp 30
4 Bolt 60
5 Nut 60
6 Washer 60
7 Pin 60
8 Standpipe Clamp Seat 2 2
9 Connection plate 1 7
10 Standpipe Clamp Seat 3 4
11 Pin 28
12 Bolt 28
13 Nut 28
14 Washer 28
15 Standpipe Clamp Seat 4 1
16 Connection plate 2 3
17 Standpipe Clamp Seat 5 2
18 Bolt 20
19 Washer 20
20 Connection plate 2
21 Washer 8
22 Bolt 8
23 Ground Seat 2 2
24 Ground clamp seat 14
25 Ground valve set support 1
26 Ground valve set support 1
27 Hose safety device assembly 8
11
ZG103-35S CIRCULATING MANIFOLD OF DRILLING FLUID
12
SN Description Qty.
1 Gooseneck 1
2 Rotary hose 1
3 Top drive adaptor 1
4 Straight pipe assembly 1
5 Hose 3
6 Drill floor valve set 1
7 Straight pipe 1
8 S-pipe 1
9 90° S-pipe 1
10 S-pipe 1
11 Straight pipe 1
12 Ground valve set 1
13 S-pipe 1
14 Straight pipe 1
15 Straight pipe 1
16 Union flange 2
17 Welded male union 2
18 Female union plug 2
19 Union flange:2″Fig1502 1
20 Male union plug:2″Fig1502 1
21 Dual-scale shockproof pressure gauge 1
22 Union type mud valve 2
23 T-joint 2
24 Female union plug 2
13
ZG103-35S CIRCULATING MANIFOLD OF DRILLING FLUID
编制:
校核:
审定:
2011 年 8 月 23 日
12