USER'S MANUAL
ZJ325-SC
August, 2011
编制:
审核:
批准:
Foreword
USER’S MANUAL OF ZJ40DBST DRILLING RIG
ZJ40DBST drilling rig is oil drilling rig which is designed and manufactured as per SY/T
5609-1999 The types and basic parameters for oil drilling rigs and related API newest
specifications. It can satisfy the requirements on middle depth well drilling for oil and gas
exploration and development.
This manual generally describes the overall structure, performance characteristics,
technical parameters, installation and commissioning, operation and maintenance,
dismantlement and transportation etc of the drilling rig.
Before installation and operation, the personnel engaged in installation, operation and
maintenance shall read this manual and user's manuals of supporting components carefully,
and install, operate and maintain the drilling rig as required. Improper installation, operation or
repair may cause personal injury or equipment damage if operators do not know related
contents.
The front and the back of the drilling rig are determined as follows: the wellhead is in the
front, the power engine house is at the back.
The left and the right of the drilling rig are determined by viewing from the wellhead to
the power engine house.
Every drilling rig has an ex-factory serial number; please provide its ex-factory serial
number when ordering spare parts or inquiring related things.
Table of contents
1. Safety warnings......................................................................................................................1
2. Drilling rig description..........................................................................................................1
2.1 Purposes and applicability.....................................................................................................1
2.2 Standards and specification for design and manufacture.......................................................1
2.3 Main technical parameters.....................................................................................................2
2.4 Major corollary equipment list of drilling rig ZJ40DBST.....................................................2
3. Structural features of ZJ40DBST drilling rig.....................................................................5
3.1 Overall structure of drilling rig..............................................................................................5
3.2 Structural features of drilling rig...........................................................................................6
3.3 Speed and lifting capacity of hook........................................................................................7
4. Installation of drilling rig......................................................................................................8
4.1 Preparation work before drilling rig installation....................................................................8
4.2 Installation sequence diagram of drilling rig.........................................................................9
4.3 Installation of parts of drilling rig..........................................................................................9
4.4 Check after drilling rig installation......................................................................................12
5. Commissioning of drilling rig.............................................................................................16
5.1 Preparation work before commissioning.............................................................................16
5.2 Commissioning of diesel generator set................................................................................16
5.3 Power supply commissioning of VFD system.....................................................................17
5.4 Commissioning of electric drive system..............................................................................18
5.5 Commissioning of driller's control cabin, instrument and meter system.............................18
5.6 Commissioning of air source system equipment.................................................................18
5.7 Commissioning of hydraulic system....................................................................................19
5.8 Running commissioning of DW..........................................................................................19
5.9 RT running commissioning..................................................................................................20
5.10 Commissioning of mud pump set......................................................................................20
5.11 Commissioning of generating air supply and VFD house trailing device.........................20
5.12 Commissioning of pump set trailing device......................................................................21
5.13 Commissioning of drawworks trailing device...................................................................21
5.14 Commissioning of mast trailing device and wireline spooler trailing device....................21
USER’S MANUAL OF ZJ40DBST DRILLING RIG
1. Safety warnings
Only well-trained, qualified and licensed persons can install, operate and
maintain the equipment.
Before the installation, operation and maintenance of the drilling rig, operators
shall read this manual and user's manuals of all equipment belonging to the
drilling rig carefully, install, operate and maintain the drilling rig as per the
requirements in the manuals.
There shall be a chief principal designated for installation, operation and
maintenance, the persons participating in work shall be assigned with clear
work, and detailed and reliable safety measures shall be available.
In the operation process, strictly execute the operation specifications and
technical safety rules.
It is forbidden to maintain and repair equipment during its operation.
Never try to overload equipment.
2.2.5. API Spec 9A-2004 25th edition Specification for wire rope
2.2.6. AWS D1.1-2008 Structural welding code-steel
2.2.7 APT RP 500 2nd edition Recommended practice for classification of locations for
power equipment installations at petroleum facilities classified as class I, division 1 and
division 2
2.2.8. IEC 44-81 Electrical apparatus for explosive gas atmospheres-general
requirements
2.3 Main technical parameters
Nominal drilling depth (4 1/2’’ (114 mmm) DP) 4000m;13120
Max. hook load 2250kN; 505.000 lb
Max. drill string weight 1440kN; 323.724 lb
Input power of DW 1000kW; 1341hp
Line of hoisting system 5×6, in parallel
Diameter of wirelineφ32mm: 1 ¼”
Mud pump power ×number 1600HP×2
Nominal opening diameter of RT 698.5mm (27 1/2'')
Effective height/type of mast 43m/K type141`
Height of drill floor 6.7m 22`.
Clear height of substructure 5.5m 18`.
Hoisting gear number one gear, stepless speed regulating
RT number one gear, stepless speed regulating
Power ×number of main diesel generator set 1101kW×3
Diameter/rated pressure of drilling fluid manifold ,single standpipe 4''/35MPa; 5000psi
Total volume of mud tanks 291m3 1778 bls
2.4 Major corollary equipment list of drilling rig ZJ40DBST
No. Name Qty. Remarks
⑴ Equipment of lifting system
API Spec 7K (parts and
1 JC40DB DW (including hydraulic disc brake) 1 set
components), the 5th edition
2 JJ225/44-K4 mast (including accessories) 1 set API Spec 4F, the 3rd edition
DZ225/6.7-S6 substructure
3 1 set API Spec 4F, the 3rd edition
(including accessories)
4 TC225 Crown Block 1 set API Spec 8C 4th edition/4F
2
USER’S MANUAL OF ZJ40DBST DRILLING RIG
3rd edition
5 YC225 traveling block 1 set API Spec 8C, the 4th edition
API Spec 8C, the 4th edition
6 DG225 Hook 1 set
3
USER’S MANUAL OF ZJ40DBST DRILLING RIG
4
USER’S MANUAL OF ZJ40DBST DRILLING RIG
Note: Configuration Items can be increased or decreased as per the user's requirements.
of drill floor.
3.2 Structural features of drilling rig
ZJ40DBST drilling rig is designed by integrating mechanical, electrical and digital
control techniques, mainly achieves digital control function and has automation,
intelligentization and informationization functions. All parts of the drilling rig adopt mature
and advance techniques at home and abroad for structural design, work reliable, are moved
and transported conveniently, run economically and meet HSE requirements.
DW, RT and mud pump all adopt independent alternating-current variable frequency
electric driving systems without mutual interference and can better meet drilling application.
Mast is a K type structure and meets the requirements of supporting Canrig6027AC top
driving devices, and lifted by hydraulic cylinder, the substructure also adopts hydraulic
cylinder lifting with swing-up structure. Main equipment and driller's control cabin etc on drill
floor are all installed at low positions.
DW is a single-shaft DW with simple structure and drives drum through one reducing
gear box by using a variable frequency motors, and main brake is a hydraulic disc brake, safe
and reliable. All running parameters of DW comprise tripping speeds and hook position, and
all safety devices can be controlled digitally.
RT is independently driven by an alternating-current variable frequency motor through
gear reduction box and cardan shaft and provided with inertia brake. Control system has
complete monitoring and over-torsion protection functions.
Two 1600HP mud pumps are arranged, and every pump is driven by two alternating-
current variable frequency motors with high reliability and convenient displacement
regulation.
Power system is provided with three 1101kW diesel generator sets and one 455kW
auxiliary generator set and has enough standby power, and the drilling rig has strong self-
maintaining capacity.
Electric drive system adopts a vector variable frequency driving system, and main electric
equipment is arranged in VFD house.
An integrated driller's control cabin is provided, driller completes main operations of the
drilling rig in the driller's control cabin, and the real-time display, storage, print and
management of parameters (signals) are achieved.
Motor speed Hook load kN Hook speed m/s Hook load kN Hook speed
r/min (10 lines)lbs (10 lines)ft/min (8 lines) m/s (8 lines)
0 1952438.827 0 1621 0
158.6 2250505.820 0.0917.71 1869 0.11
318.6 2250 0.18 1869 0.23
478.7 2250 0.27 1869 0.34
638.7 2250 0.36 1869 0.45
800.7 2250 0.45 1869 0.56
926.5 2197493.905 0.52102.33 1825 0.65
1005 2010 0.56 1670 0.7
1044.2 1925 0.58 1599 0.73
1083.4 1844 0.61 1532 0.76
1122.6 1768 0.63 1469 0.79
1161.6 1696 0.65 1409 0.81
1200.7 1505338.337 0.67131.85 1250 0.84
1340.7 1214 0.75 1008 0.94
1620.7 837 0.91 695 1.14
1760.7 711 0.98 591 1.23
1900.7 612 1.06 508 1.33
2040.7 536 1.14 445 1.43
2200 470105.660 1.23242.00 390 1.54
Hook load kN
7
USER’S MANUAL OF ZJ40DBST DRILLING RIG
The installation of the drilling rig shall conform to the requirements of final assembly
process with the requirements in this manual.
4.1 Preparation work before drilling rig installation
Only trained and qualified persons can install the drilling rig with qualification
certificates.
The personnel engaged in drilling rig installation, particularly the person in charge of
the installation shall first read this manual and user's manuals of all parts to make
themselves know the structural features and the installation and commissioning
requirements of the drilling rig and its parts.
All tools and equipment for installing the drilling rig shall be complete and have
good service performance. Metering devices and instruments used shall be qualified.
Well site and foundation for installing the drilling rig shall accord with requirements
of drawing samples and technical files approved as per specified procedures.
As the drilling rig is heavy equipment, ensure personal safety and equipment safety
in the installation process, ensure enough capacity of lifting equipment and lifting
belt for heavy and large modules, and ensure their completeness in the use process.
Check equipment, parts and components for completeness, qualification and damage
before the installation of the drilling rig, clean and remove dirt from the parts and
components.
8
USER’S MANUAL OF ZJ40DBST DRILLING RIG
Generating air source house, VFD trailer Generating air source house, electric control houseDrawworks
Mud pump set trailer Mud pump set Ground part of drilling fluid manifold
Solids control system (inc.mud tank trailer)Oil tank, water tank Lift mast and substructure
Reeve wire line
Note: other auxiliary facilities can be crossways installed while ensuring safety and
available field.
4.3 Installation of parts of drilling rig
As per the plan of the drilling rig, take the wellhead center as a reference, loft on the
plane of the well site foundation and draw installation datum line for each area.
4.3.1 Installation of substructure (please see User's Manual of DZ225/6.7-S Substructure
for details)
Use wellhead centerline and the drawn lines of drill floor area as references, place the left
and right base seats of the substructure bottom layer, connect the left and right base seats into a
whole, install all columns, tie rods and lifting cylinder of the middle layer, and finally install
left and right upper seats, intermediate seat (setback beam, RT beam, motor beam and floors)
and other auxiliary parts of the top layer.
Note: except the ladders to drill floor, the ramp and the ladders to solids control etc shall
be installed after the substructure is lifted.
4.3.2 Trailing installation of generating air supply house and VFD house (please see the
plan drawings of generating air supply house and trailing device for details)
Install VFD house on the trailer and generating air supply house on its trailing device, and
then place and set the generating air supply house trailer and VFD house trailer as per the plan
9
USER’S MANUAL OF ZJ40DBST DRILLING RIG
of the drilling rig and the lofting and marking positions. Install all devices in generating air
supply house.
Connect the oil supply pipelines and the air pipelines of all machines and the connecting
pipelines among devices of the air supply system.
Install mufflers for diesel engines.
4.3.3 Installation of DW
The DW had been assembled and commissioned before delivery from factory. There are
positioning blocks at corresponding positions of substructure and drawworks trailer. Lift the
DW onto the trailer or DW beam of the substructure and install it in place as per the positions
of the positioning blocks. Fasten the bolts connected with the DW beam.
4.3.4 Installation of RT and driving device
The RT driving device (except the cardan shaft) had been installed on the motor beam of
the substructure integrally and is packed and installed as per transported modules. The RT
driving device will be installed together with the motor beam during field installation.
Lift and place the RT onto the RT beam, connect it with pins and install safety pins
properly (or adjust by using puller bolts and position it as per marks).
Install the cardan shaft, and ensure that the parallelism tolerance of flange faces at two
ends of the cardan shaft is not more than 1.0 mm.
4.3.5 Installation of mast (please see User's Manual of JJ225/43-K Mast for details)
Before installation, check the appearances of mast components, repair or replace the
positions deformed or damaged, and rotate every rope guide sheave which shall be flexible
without blockage.
The installation of the mast conforms to the sequence of lower parts, upper parts, main
body and accessories. Alternately move bracket, install mast main body and accessories, and
then support the mast by high stand to install monkey board (including 0.5t air winch).
4.3.6 Installation of standpipe of drilling fluid manifold
When the mast is at low position, install the standpipe of the drilling fluid manifold on
the mast, and then connect and seal it by unions reliably.
4.3.7 Installation of crown block (please see User's Manual of TC225 Crown Block for
details)
The crown block is connected with the mast by bolts. The accessories of the crown block
such as auxiliary sheave, lifting frame and climb assistantoretc shall be installed completely.
4.3.8 Place the wireline spooler as per the positions shown by the plan.
4.3.9 Install traveling block and hook, reeve hoisting wireline and drilling wireline (along
10
USER’S MANUAL OF ZJ40DBST DRILLING RIG
the line).
4.3.10 Installation of driller's control cabin
Lift the driller's control cabin onto the drill floor, and connect the lines of the pneumatic,
hydraulic and electric systems as per serial numbers.
4.3.11 Installation of cable tray
Install substructure main cable tray and cable tray in solids control area of pump set as
per the plan of the drilling rig and the cable tray general drawing. Connect the pipelines of all
systems, and install the cables and wires as per the User's Manual of Electric System.
4.312 Installation of mud pump set trailing device (please its user’s manual for details)
Install trailing device of mud pump set including mud pump set as per the plan of the
drilling rig and the lofting and marking positions. Pressure relief line of safety valve for mud
pump must return back to mud tank.
4.3.13 Installation of ground part of drilling fluid manifold
Install it as per the User's Manual of Drilling Fluid Manifold, and connect it with the
standpipe part and the mud pump discharge pipeline.
4.3.14 Installation of solids control system
Install the mud tanks (inc. mud tank trailer) of the solids control system as per the lofting
and drawing positions of the plan of the drilling rig, install the equipment in and on the tanks
as per the User's Manual of Solids Control System, and connect the communicating pipes
among the tanks and the mud pump suction pipelines.
4.3.15 Installation of standard electric system on well site (please see User's Manual of
Standard Electric System on Well Site for details.)
4.3.16 Installation of drilling instruments
Install the drilling instruments as per requirements of User's Manual of Drilling
Instruments.
4.3.17 Installation of monitoring system and communication system
Install the monitoring system and the communication system as per User's Manual of
Electric Drive and the elevation and the plan of the drilling rig (except the parts installed after
the mast and the substructure are lifted.)
4.3.18 Installation of auxiliary equipment
Install the auxiliary equipment as per the elevation and the plan of the drilling rig.
4.3.19 Installation of oil tanks and water tanks
Install the oil tanks and the water tanks as per lofting and drawing position of the plan of
the drilling rig, and connect the pipelines among the cable trays, the oil tanks and the water
11
USER’S MANUAL OF ZJ40DBST DRILLING RIG
tanks.
4.4 Check after drilling rig installation
4.4.1 The pretension torques for bolt connection are shown in the following table, and
check every main stressed bolt by force moment spanner one by one.
Bolt nominal diameter/mm
Bolt
16 20 24 27 30 36 42
strength
5/8” ¾” 15/16” 1 1/16” 1 3/16” 1 3/8” 1 5/8”
grade
Pretension torque/N.mlb-ft (factor:0,735)
185-259
8.8 361-505 623-873 919-1286 1243-1740 2178-3049 3492-4889
136-191
4911-6875
10.9 260-364 507-710 877-1227 1292-1809 1748-2448 3063-4289
3622-5070
4.4.2 Check after substructure installation
Installation of every connection and fixation component must be complete and
fastened. Grease pins at rotating parts.
Every part shall not have serious deformation, and every weld shall not have crack
and opening.
Bottom beams of substructure contact properly with foundation surface, and major
bearing points must be tamped.
There is no barrier to block driller's eyesight on the drill floor.
Lifting cylinders of substructure work normally.
4.4.3 Check after mast installation
Grease every lubrication point as required.
Installation of every connection and fixation component must be complete and
fastened
Every part shall not have serious deformation, and every weld shall not have crack
and opening.
All auxiliary facilities assembled on the mast are complete and good.
Lifting cylinders of mast work normally.
The drilling wireline is complete and reeved correctly, and its ends are fixed firmly.
No tools and stuffs left on the mast.
Weight indicator works normally.
4.4.4 Check after mast trailer installation
Check tires for surface wear and state and tire pressure for conformity with
12
USER’S MANUAL OF ZJ40DBST DRILLING RIG
requirements.
Check surface of rigid suspension for deformation or cracks, the rotating parts for
favorable lubrication, flexible rotation and firm and reliable installation, the brake
clearance of hubs for conformity with requirements (please see the operating
instruction manuals of axles and rigid suspension for the adjustment of brake
clearance).
Check the welded parts such as the trailer connector and supporting seats etc for
damage, the pins at joints for locking with safety pins, and the bolts, nuts, spring
washers and split pins for completeness.
Check the hydraulic control system for flexible operation and the pipes and quick
release joints for correct and reliable connection.
Check whether trailing module is detached from other fixed module completely.
Towing hook of tractor saddle should be open completely after trailing device
connected with tractor.
After the trailing device connected with tractor, the lamps should be in good
condition, the air passage is smoothly without any leakage.
4.4.5 Check after DW installation
Check and ensure all guards are installed completely, pipelines are connected
correctly and reliably and hasps are connected firmly.
Grease all lubricating points as required.
Grease main speed reducer as per requirements in its user's manual.
The pipelines of hydraulic source, operating cabinet and control cabinet of hydraulic
disc brake and brake caliper system are connected correctly and sealed reliably
without leakage.
Check the wearing conditions of brake disc and brake block of hydraulic disc brake,
when the abrasion thicknesses reach ultimate value, replace them.
Adjust the brake clearance of hydraulic disc brake to proper position as per the User's
Manual of Hydraulic Disc Brake.
4.4.6 Check after crown block installation
Crown block is fixedly connected to the upper section of the mast and positioned by
positioning pins reliably.
4.4.7 Check after traveling block and hook installation
The bolts and pins are complete and firm, and guards are good.
The hook body and the hook opening locking pin shall be operated flexibly, and the
13
USER’S MANUAL OF ZJ40DBST DRILLING RIG
safety locking pins of the hook bail are complete, safe and reliable.
4.4.8 Check after swivel installation
Swivel rotates flexibly, no oil and drilling fluid leakage during rotation.
Rotary hose shall be provided with safety chain additionally.
4.4.9 Check after mud pump installation
Install safety valve of mud pump as per required position, and ensure it works
normally.
The pulsation dampener of mud pump is filled with nitrogen or air, and it is
forbidden to fill oxygen.
The surface of mud pump pressure gauge is clean and accurate.
4.4.10 Check after mud pump set trailer installation
Installation of every connection and fixation component must be complete and
fastened
Every part shall not have serious deformation, and every weld shall not have crack
and opening.
The tyre surface should be in good condition without any obvious abrasion, and the
tyre pressure accords with the specification and requirements.
Rotating parts of axle and rigid suspension should be lubricated well, rotated flexibly,
and installed firmly and reliably.
Brake clearance of hub is in line with specification and requirements.(the adjustment
for brake clearance please see the operation manual of axle and rigid suspension)
Check the hydraulic control system for flexible operation and the pipes and quick
release joints for correct and reliable connection.
Check whether trailing module is detached from other fixed module completely.
Towing hook of tractor saddle should be open completely after trailing device
connected with tractor.
After the trailing device connected with tractor, the lamps should be in good
condition, the air passage is smoothly without any leakage.
4.4.11 Check after drilling fluid manifold installation
All supports and pipe clamps are fixedly reliably. All unions are connected correctly
and sealed reliably.
Valve hand wheels are complete, closed and opened flexibly without leakage.
4.4.12 Check after installation of generating air supply house trailer and VFD house
trailer
14
USER’S MANUAL OF ZJ40DBST DRILLING RIG
All instruments and meters are installed completely, sensitive and reliable.
4.4.16 Check after solids control system installation
All connecting bolts, nuts, spring washers and split pins are complete and fixed. And
the per-torque of bolts are in line with requirements.
All pipelines and valves are good without water leakage.
The tyre surface of solids control tank trailing device should be in good condition
without any obvious abrasion, and the tyre pressure accords with the specification
and requirements.
Rotating parts of axle and rigid suspension should be lubricated well, rotated flexibly,
and installed firmly and reliably.
4.4.17 Check after electric control system and well site standard electric system
installation
Check as per requirements in the User's Manual of Electric Control System and Well Site
Standard Electric System.
4.4.18 Check after drilling instrument system installation
Check as per the related requirements in the User's Manuals of Drilling Instruments to
make sure all instruments are sensitive and reliable.
4.4.19 Check after monitoring system and communication system installation
Check as per the related requirements in user's manuals of monitoring system and
communication system.
4.4.20 Check after auxiliary part installation
Auxiliary parts are installed completely and are good.
The bolts of the auxiliary parts are installed completely and firmly. All connecting
pins and safety chains are complete and good.
The wireline for the auxiliary equipment shall be good without damage.
16
USER’S MANUAL OF ZJ40DBST DRILLING RIG
Supply power to every lighting point and check its working condition.
Power up HPU, start up motor, and check rotating direction and running condition.
Supply power to solids control system, check rotation and running condition of the
motor of the solids control equipment.
Power up oil pumps and water pump of oil tank and water tank, and check rotation
and running condition.
Supply power to other electric appliances and check their working condition.
(Please see User's Manual of Electric Drive System for specific requirements.)
5.4 Commissioning of electric drive system
5.4.1 The switch of the driller's control cabinet and PLC are logically true. Assignment
relationship of by-pass of PLC is correct.
5.4.2 The functions of wind loss and locking protection for every main motor are normal.
5.4.3 Air inflation and undervoltage alarm function of drill floor is normal.
5.4.4 The automatic function, feedback function and locking function are normal.
5.4.5 Loading equilibrium test of mud pump is normal.
5.4.6 Function of emergency brake button is normal.
5.4.7 DW dynamic braking system function is normal. (Test with DW together.)
(Please see User's Manual of Electric Drive System for specific requirements.)
5.5 Commissioning of driller's control cabin, instrument and meter system
Please see user’s manual of driller’s control cabin and operation manuals of all
instruments and meters for details. (It can be performed after the mast and the substructure are
lifted.)
5.5.1 Power-on commissioning of computer part.
5.5.2 On-line commissioning of drill floor monitor and computer.
5.5.3 Passageway test of analog quantity sensor.
5.5.4 Input of initialized data of system
5.5.5 The pressure and liquid level sensors shall be installed properly. All cable and
pipeline shall be connected correctly. Functions are normal.
5.5.6 All cameras of monitoring system shall be installed properly, and image
transmission and display are normal.
5.5.7 Communication system works normally.
5.5.8 Calibrate the flow meters, sensors and indicators as per the requirements of the
operation manuals.
18
USER’S MANUAL OF ZJ40DBST DRILLING RIG
Check the pressure of lubrication pump and make it within 0.1 ~0.35Mpa. 15 a 51
psi
Start drawworks motor and make it running for 20 minutes at the rotating speed of
803r/min.
Adjust the speed of drawworks main motor by control handle to check its running
condition.
Start auxiliary drive motor to check its rotation direction and make sure the rotation
direction of drum is the direction of winding. And adjust the motor by increasing and
decreasing speed to check its running condition.
Braking test of hydraulic disc brake shall not be less than 5 times at different speeds.
5.8.2.2 Commissioning requirements:
All operations are accurate and flexible.
All parts are sealed well without seepage and oil leakage.
Lubricating oil pressure is stable, and the lubricant quantity is proper.
Stable running, no abnormal vibration and sound.
The bearings at all positions are normal in temperature rise.
Hydraulic disc brake is flexible and reliable.
5.8.3 Reeving of wireline
After DW is commissioned and qualified, put wireline spooler in right location and
reeve wireline. The fixed end is reeved into deadline stabilizer and fastened and the
movable end is reeved into DW drum and fixed with wireline clamp seat.
5.9 RT running commissioning
(It can be performed after the mast and the substructure are lifted.)
5.9.1 Start RT drive motor to check its rotation direction and make sure the RT has a
positive rotation. And adjust the motor by increasing and decreasing speed to check its running
condition.
5.9.2 Engage the RT inertia brake, and check the brake function and the interlocking
condition of the motor.
5.10 Commissioning of mud pump set
(It can be performed after the mast and the substructure are lifted.)
Test to working state as per the requirements in the User's Manual of HHF-1600 Mud
Pump Set.
5.11 Commissioning of generating air supply and VFD house trailing device
5.11.1 With the cooperation of jacking cylinder, the trailer could go back and engage the
20
USER’S MANUAL OF ZJ40DBST DRILLING RIG
generating air supply house and VFD house trailing devices for 1-2 times, and do the
connection test.
5.11.2 Test of the air brake for axle (shaft). Check the reliability of air brake.
5.11.3 Electrical test.Make sure directive lighting of trailer outline etc electric function is
in good condition.
5.12 Commissioning of pump set trailing device
5.12.1 With the cooperation of jacking cylinder, the trailer could go back and engage the
pump set trailing devices for 1-2 times, and do the connection test.
5.12.2 Test of the air brake for axle (shaft). Check the reliability of air brake.
5.12.3 Electrical test.Make sure directive lighting of trailer outline etc electric function is
in good condition.
5.13 Commissioning of drawworks trailing device
5.13.1 With the cooperation of jacking cylinder, the trailer could go back and engage the
drawworks trailing devices for 1-2 times, and does the connection test.
5.13.2 Test of the air brake for axle (shaft). Check the reliability of air brake.
5.13.3 Electrical test.Make sure directive lighting of trailer outline etc electric function is
in good condition.
5.14 Commissioning of mast trailing device and wireline spooler trailing device
5.14.1 Lower down the mast by mast lifting cylinder and crane to position, and then
install the connecting device of trailer below crown block by pins, and connect wireline
spooler trailer to the rear of mast trailer.
5.14.2 Test of the air brake for axle (shaft). Check the reliability of air brake.
5.14.3 Electrical test.Make sure directive lighting of trailer outline etc electric function is
in good condition.
5.15 Mast and substructure lifting and mast alignment
(Please see the user's manuals of mast and substructure for details.)
5.15.1 Check before mast lifting
Before mast lifting, check the parts which have been already installed as per clause
4.4.3 to ensure all parts are installed correctly and connected reliably.
The lifting cylinder is in good condition and ends are fixed firmly.
The hydraulic system and hydraulic control system are normal and the working
pressure is not less than 25MPa. 3625 psi
Overturn and fix the operation platform of the monkey board.
Place the tong counterweight to low position.
21
USER’S MANUAL OF ZJ40DBST DRILLING RIG
Check again the status of the hydraulic lifting cylinders and their pipelines and
controlling valves, and then connect them with the hydraulic power unit to check
whether their pistons are acting synchronously according to requirements specified in
operation manual.
Check the mast for left work pieces or tools and the safety facilities for completeness
and reliability.
5.15.2 Lifting of mast
The lifting work must be commanded by a commander. The position where the
commander is must be seen by driller and must be safe.
Before mast lifting, all persons and construction machinery must be in safety zone
except rear personnel in cabin, driller, and personnel observing key parts, safety
officer and the commander.
Safety distance: the distance between position dead ahead and bore shall not be less
than 70m, and distance among two sides to two sides of mast shall not be less than 20m.
Before formally lifted, the mast must be carefully checked again; check all
connections’ status and be sure no sundries on the mast. Lift the mast slowly by the
lifting cylinder. When mast is about 200mm off the high-stand, stop lifting. Leave it
in that position for at least 10 minutes, during this time visually inspect the critical
welding seams and stress areas for any broken parts, deformation, cracks of welding
seam; check for any leakages or other abnormalities on the lifting cylinders etc and
then keep inspection records.
When finishing inspections, lower the mast to the high-stand slowly, repeat this
operation for another two times, and make sure there are no abnormalities then lift
the mast formally.
Lift the mast slowly and evenly. When the mast nearly reaches the upright position
(about 80°), slow down again to make the mast reach the upright position smoothly,
and then connect the front legs of the mast with the upper seats of substructure by
pins to complete the whole lifting operation. During lifting, attentions shall be paid to
observation of working pressure of the lifting cylinders, if it exceeds the rated
working pressure, stop lifting immediately and lower the mast down on the high-
stand, and find out the reasons and eliminate the failures, and then start lifting again.
After the mast is placed in place, retract the lifting cylinder and fix it on the mast
upright column.
22
USER’S MANUAL OF ZJ40DBST DRILLING RIG
6.1 Warnings
6.1.1 Operate the drilling rig following its user's manual and the related safety rules
strictly.
6.1.2 It is forbidden to check and repair equipment without cutting of power source and
control source.
6.1.3 When inspecting and repairing a VF motor, make sure the auxiliary switch beside
junction box has been closed and locked by copper lock, insert locking pin, and ensure the
main circuit is power off.
6.1.4 Before the drilling rig works, check and adjust the wireline on DW drum. Make
sure the initial wireline on the drum is not less than 9 circles at any time to prevent the
wireline from slipping due to excessive strain of wireline clamp. Then retighten the bolts and
nuts of wireline clamp seat.
6.1.5 When the drilling rig works, personnel are not allowed to stay in the area of the mud
pump relief valve, high pressure manifolds and rotary hose.
6.1.6 In the operation of the drilling rig, the speed regulation of every running part shall
be slow and smooth, avoid the impact to mechanical and electric systems due to violent
changes in speed.
6.1.7 When the rig needs to transport fast, adopt corresponding saddle load and
movement speed as per the design recommendation. Never try to overload and over speed.
6.2 Precautions for drilling rig operation
6.2.1 Select the generator sets with proper power to match the power requirements as per
25
USER’S MANUAL OF ZJ40DBST DRILLING RIG
drilling conditions.
6.2.2 During drilling operation, adjust the hoisting speed of the DW upon its load, drilling
technical requirement and DW hoisting curve; adjust discharge pressure and strokes of the
mud pumps as per the drilling technical requirements; and adjust the RT speed as per drilling
technical requirements.
6.2.3 Before operation, check whether both ends of drilling wireline is fixed in
conformity with requirements, all savers are reliable and agile, the DW brake system and
clutch are reliable, and all electrical appliances and instruments are connected correctly and
work smoothly or not.
6.2.4 During operation, make sure the pressures of air supply system and hydraulic
pressure system meet the regulated working pressure.
6.2.5 During working, make sure the gears and bearings etc of transmission system are
lubricated sufficiently and reliably. Check whether the quality and quantity of the lube
oil/grease for each part meet the requirements, and supplement or replace the lube oil as per
the regulated operation period.
6.2.6 Check the rotation condition of mud pump direct drive motor periodically.
6.2.7 Check inflation pressure of mud pump discharge air bag periodically.
6.2.8 All ladders, handrails and guards shall be firm and reliable without looseness.
6.2.9 It is forbidden to operate the drilling rig over speed and over load and violate any
operation regulations while using any part of the drilling rig.
6.2.10 Check the hydraulic cylinders of mast and substructure, and jacking cylinder of all
trailers for reliability.
6.3 Safety practice for drilling rig operation
6.3.1 Requirements on drilling rig operation
There shall be mechanical, electrical and instrument professionals in drilling crew
and technical regulations for drilling rig routine operation and maintenance shall be
made. The routine operation and maintenance of drilling rig are guided and treated.
Only trained and qualified persons can operate and maintain the drilling rig with
qualification certificates.
The operators must follow the safety operation regulations.
The lifting speed and lifting capacity of drilling rig must be in conformity with
related regulation in the User's Manual of DW.
The displacement and pressure of mud pump must be in conformity with the related
regulation in the User's Manual of HHF-1600 Drilling Pump.
26
USER’S MANUAL OF ZJ40DBST DRILLING RIG
When any part of the drilling rig goes wrong, stop using the part and treat faults, and
use it again after troubleshooting.
Make sure to release pressure inside pipelines to zero in the disconnection of any
high pressure pipelines or hoses. Ensure the power has been cut off before repair the
electric circuit and equipment.
When the trailing modules need to be transported fast, adopt corresponding saddle
load and movement speed as per the design recommendation.
6.3.2 It is forbidden to operate the drilling rig, and repair it in time when it is in one of
following conditions:
The drilling rig is used over load and over speed.
The steel structures of the mast and the substructure deform or crack.
The foundation of the substructure sinks or ruptures.
Brake and drive systems are out of control.
The safety valve and the charged air of air dampener of mud pump are not in
conformity with requirements.
The crown block savers fail during tripping.
The instruments of the drilling rig are damaged or have no metering function.
The pneumatic control system fails or air supply pressure is lower than the allowed
range.
Guards and handrails are incomplete.
Oily substances enter the surfaces of brake disc, brake huh and clutch steel hub.
The lifting cylinder and the drilling wireline are not checked as required.
The jacking cylinder of all trailing system has oil leakage.
The tyre of trailing system worn seriously with leakage, and the hub is out of shape.
6.3.3 All operators are forbidden to perform the following operation
All parts (including whole trailing device) runs with overload, overtemperature and
overpressure.
Check and repair equipment without cutting off the power source and the control
source of the drilling rig.
Make up threads with RT
Adjust the brake when the hook is loaded.
Water brake disc, brake hub and friction hub.
6.4 Maintenance regulations of drilling rig
The maintenance is divided into periodic maintenance and staged maintenance as per the
27
USER’S MANUAL OF ZJ40DBST DRILLING RIG
The operation status of the power end of mud pump, the temperature rise and
insulating property of direct drive motor.
The suction performance of fluid end of mud pump, the sealing, cooling and
lubrication of piston, liner, tie rod etc.
The pressing reliability of the cylinder lids and valve caps of mud pumps.
The working condition of charging pump and spraying pump.
Conformity of charging pressure of pulsation dampener and safety valve with
requirements.
The fixation of high pressure manifold, and the flexibility of high pressure valve etc.
The working condition of solid control equipment, and the temperature rise and the
insulating property of motor.
6.4.3.2 Weekly maintenance and check items:
Check and clean lubrication oil filters
Lubrication and wear of crosshead and guide plate.
The flexibility of action of safety valve.
The insulation condition of circuits.
The smoothness of spray nozzle of mud gun.
6.4.4.3 Monthly maintenance and check items:
The meshing condition of gears at power ends of mud pump, and check and adjust
the gap of the crosshead.
Check the high pressure pipe through non-destructive test.
Fasten connecting valve bolts of mud pump and clean oil sump.
6.4.5 Air supply system
6.4.5.1 Shift maintenance and check items:
No abnormality during the startup and the stop of air compressor, and conformity of
oil quality, oil amount and oil temperature with requirements.
Check the automatic pressure regulating device and the safety valve for conformity
with requirements.
Check the working pressure of air tank and discharge water for pollution discharge.
Check the smoothness and the favorable seal of pipelines.
6.4.5.2 Weekly maintenance and check items:
Check the working condition of air filter without blockage.
Check safety valve and sequence valve.
6.4.5.3 Monthly maintenance and check items
30
USER’S MANUAL OF ZJ40DBST DRILLING RIG
33
USER’S MANUAL OF ZJ40DBST DRILLING RIG
7.2.2 Disassemble the drilling rig into components, then pack or bundle up every
component separately. Larger components such as mast and substructure shall be disassembled
into smaller units in terms of the size of carrying vehicles, and DW, diesel engine set, VFD
house and trailing device etc can be transported as a module.
7.2.3 Pack fasteners separately as per components, and use labels to identify them. High-
strength bolts and nuts for mast, crown block, deadline stabilizer and universal shaft shall be
packed separately after disassembly to avoid confusing with others. All pins and safety pins
shall be subjected to anti-rusting treatment, bundled up and boxed as per component sorts, so
as to prevent rusting, impact, damage and confusion.
7.2.4 Disassemble air, fluid and water pipelines only after pressure is released. Discharge
fluid and water in pipelines and use compressed air to dry them.
7.2.5 The interfaces of the disassembled air, fluid and water pipelines shall be sealed or
bundled up, so as to keep clean inside pipelines and at interfaces and avoid impurities from
going inside. Notice: two ends of every interface shall be marked by the same No.
7.2.6 The pins, bolts and nuts for mast and substructure should be coated with antirust oil
and boxed, and they cannot be piled randomly. The high-strength bolts and nuts for cardan
shaft should be with the connecting flange, and packed with cardan shaft together.
7.2.7 The hoses of air system shall be prevented from oil, and the outer threads of every
pipeline shall be bundled up, so as to keep the threads from impact and damage and keep the
pipeline clean.
7.2.8 If long-distance transportation or long-term storage is required, perform rain
proofing, moisture proofing and rust removal treatment.
7.3 Transportation of drilling rig
When the drilling rig is transported, make a transportation plan according to the overall
dimensions and weights of its components and the road conditions, and make a transportation
vehicle number table according to the vehicle conditions. The transportation units of mast and
substructure shall be transported intensively and other parts shall be transported intensively as
per components.
34
USER’S MANUAL OF ZJ40DBST DRILLING RIG
Filing
Maintenance
No Part name Position Oil spec. amount for
period
. new device
Drum shaft,
Ambient temperature above -20℃ 2 kg
coupling, grease Every 15 days
NLGI 2 lithium base grease
lubrication
Ambient temperature
-20℃~+10℃, ISO VG 150
Medium and extreme pressure
When the oil level is
gear oil
1 DW Gear reducer box below the mark, add
Ambient temperature
or chain oil in time.
-10℃~+40℃, ISO VG 220 500L
transmission oil Replace the oil
Medium and extreme pressure
tank, oil completely every 6
gear oil
lubrication months or when the
Ambient temperature
oil has been polluted.
+10℃~+60℃, ISO VG 320
Medium and extreme pressure
gear oil
Replace the grease
completely every 3
2 Motor Bearing FAG-Arcanol L135V years or when the 290 g
lubrication grease grease has been
polluted.
Before lifting and
All sheave lowering mast and
bearings substructure every
Mast
3 Ambient temperature above -20℃ time 200 g
Substructure NLGI 2 lithium base grease Before installing and
disassembling mast
Pins and padeyes
and substructure
every time
4 Crown block Ambient temperature above -20℃ 500g
Sheave bearings Every 7 days
NLGI 2 lithium base grease
Travelling Ambient temperature above -20℃
5 Sheave bearings NLGI 2 lithium base grease Every 7 days 500g
block
Bail pin, pins Ambient temperature above -20℃ 200g
Every 7 days
Thrust bearing NLGI 2 lithium base grease
Ambient temperature When the oil level is
6 Hook -20℃~+50℃, ISO VG 220 below the mark, add
Medium and extreme pressure oil in time. Replace 20L
Oil pool
gear oil all lubrication oil
after every well is
drilled.
Medium and extreme pressure
gear oil
Main oil pool Every two months 200g
Ambient temperature
-20℃~+50℃, ISO VG 220
7 Swivel
Bail pin, washing
pipe packing, Ambient temperature above -20℃
Every 72h 200g
bracket and lower NLGI 2 lithium base grease
cover oil seal
35
USER’S MANUAL OF ZJ40DBST DRILLING RIG
Spinner and centre Ambient temperature above -20℃
8 Kelly spinner Every 200h 200g
pipe bearing NLGI 2 lithium base grease
Ambient temperature
-20℃~+50℃, ISO VG 220 200L
Main oil pool Every two months
9 RT ZP275 Medium and extreme pressure
gear oil
Ambient temperature above -20℃ 100g
Locking device Every 7 days
NLGI 2 lithium base grease
Medium and extreme pressure
gear oil When the oil level is
Gear reducer box Ambient temperature below the mark, add
or chain oil in time.
10 RT drive -20℃~+10℃, ISO VG 150
transmission oil Replace the oil 200L
device Ambient temperature
tank, oil completely every 6
-10℃~+40℃, ISO VG 220
lubrication months or when the
Ambient temperature
oil has been polluted.
+10℃~+60℃, ISO VG 320
RT Ambient temperature above -20℃
11 transmission Bearing, spline NLGI 2 lithium base grease Every 72h 100g
cardan shaft
Ambient temperature
-20℃~+10℃, ISO VG 150
Medium and extreme pressure
gear oil
When the oil level is
Ambient temperature
below the mark, add
-10℃~+40℃, ISO VG 220 oil in time.
Machine oil pool, 350L
Replace the oil
HHF-1600 oil lubrication Medium and extreme pressure
12 completely every 6
mud pump gear oil months or when the
oil has been polluted.
Ambient temperature
+10℃~+60℃, ISO VG 320
Medium and extreme pressure
gear oil
Belt transmission Ambient temperature above -20℃
device Every 15 days 400g
NLGI 2 lithium base grease
Bearing
Ambient temperature
-20℃~+50℃, ISO VG 220
Oil pool Replace once a month 2L
Medium and extreme pressure
gear oil
13 Air winch Gears and all Ambient temperature above -20℃
grease lubrication Every 7 days 600g
NLGI 2 lithium base grease
points
Ambient temperature When the oil level is
-30℃~+50℃, ISO VG 46 below the mark, add 0.2 L
Oil sprayer
oil in time.
ISO HM hydraulic oil
14 Deadline Sheave bearings Ambient temperature above -20℃ Replace all 400g
lubrication grease
36
USER’S MANUAL OF ZJ40DBST DRILLING RIG
NLGI 2 lithium base grease after every well is
drilled.
stabilizer Transformer oil with
Weight indicator Fill while correcting Proper
sensor pipe ISO viscosity of 8.7 weight indicator
15 All wirelines Wireline surface Wireline surface grease As per use condition Proper
Explanation: the listed lube oils in this table are recommended ones. According to ISO
viscosity grade requirements, it is necessary to use the qualified lubrication oil. The lubrication
and maintenance period is suitable for the normal condition, and user can properly adjust the
period of replacing oil as per the actual working condition and the periodic oil quality check.
Crown block
Φ203.2×Φ276.22×95.25 37941K 7
Crown sheave
1
block Auxiliary
80×170×39 GB283-81 42316 2
sheave
Traveling Traveling block
2 Φ203.2×Φ276.22×95.25 37941K 5
block sheave
37
USER’S MANUAL OF ZJ40DBST DRILLING RIG
Hook load
3 Hook Φ160×Φ350×120 GB4663-1994 3-939 1
bearing
Anti-jump
Φ200×Φ310×70 GB297-84 2007140 1
bearing
4 Swivel Upper and
lower
GB283-81 32240 1
alignment
bearings
Load bearing Φ800×Φ1060×155 91682/800 1
No. Name
1 User's Manual of ZJ40DBSTDrilling Rig
38
USER’S MANUAL OF ZJ40DBST DRILLING RIG
39
Attached drawing 1 Elevation of ZJ40DBST Drilling Rig
40
Attached drawing 2 Plan of ZJ40DBST Drilling Rig
41
Attached drawing 3 Drive System Drawing of ZJ40DBST Drilling Rig
42
Attached drawing 4 Foundation Drawing of ZJ40DBST Drilling Rig
43