Professional Documents
Culture Documents
INFRASTRUTURE SECTOR
REPORT
20th February 2023
PUNJAB PLANNING AND POLICY SUPPORT PROGRAMME (P3SP)
FAISALABAD DIVISION REGIONAL PLAN
1
DISTRICT ADMINISTRATION BUILDINGS
Under the P3SP Regional Plan Edeavor it was envisaged by the Infrastructure Team
of The Urban Unit (GoPb) to assess the District Administration Buildings and facilities,
find the gaps and improvement points along with the conceptual layout, estimated costs
and proposed development schemes through rigorous and vigorous field and facilities
surveys of all the 4 Districts of the Faisalabad Division. For achieving this goal,
following Departments of this Sector were visited for example; Assistant Commissioner
Offices, Deputy Commissioner Offices, District Council Offices, Deputy Director
Development Offices & Municipal Committee (MC) Offices.
Methodology Adopted
Following approach was adopted to attain the vital objectives and targets of field
assessment and other tasks for short term, medium term and long-term regional plans;
Page 2 of 55
Locations of Surveys and Facility Visits
Various facilities of District Administration Buildings in the following four districts were visited
during December 2022 to January 2023 surveys;
During the field surveys the gaps and improvement needs were observed, and based
on that following suggestions are tabulated;
Façade
Parking Sheds Lightning Poles Office Renovation
Improvement
Solid Waste
Furniture Items Public Benches Water Coolers
Management
Landscaping /
Floor Tiling Record Rooms Smart LED Lights
Plantation
Document Cont.
Distemper Oil Paints First Aid
Sys.
Electric Cable
Green Belts Fountains Solar System
Dressing
Page 3 of 55
Interventions Interventions Interventions Interventions
Security Guard
- - -
Room
Visit Pictures
Proposed Schemes
Following schemes are proposed for the development of the Faisalabad Division;
Cost
Sr. No. Schemes
(Million PKR)
Rehabilitation of Existing Civil Officers Rest House (2
1 9.21
Kanals - 2 Stories) - District Toba Tek Singh
Construction of New Civil Officers Rest House (2 Kanals -
2 66.70
2 Stories) - District Toba Tek Singh
Renovation of District Admin. (DC Office) Building -
3 46.00
District Toba Tek Singh
Rehabilitation of Civil Officer Rest House (4 Kanals - 2
4 136.00
Stories) - District Jhang
Page 4 of 55
Cost
Sr. No. Schemes
(Million PKR)
Construction of New Block & Rehabilitation of Existing
5 District Council (4.5 Kanal - Single Stories) - District 65.76
Jhang
Construction of New Govt. Hostel in Satellite Town (5
6 238.00
Kanals - 3 Storied) - District Jhang
Construction & Rehabilitation of XEN Office (Building &
7 52.00
Highway Division) (3 Kanals - 1 Stories) - District Chiniot
Construction of 3 SDO Office (Building & Highway
8 51.99
Division) (1 Kanal 1 Storey) - District Chiniot
Construction of Civil Officer Rest House (5 Kanals 2
9 164.0
Storied) – District Chiniot
Construction of GOR-I District Complex (71 Kanals) –
10 1,221.0
District Chiniot
Renovation of Municipal Corporation Office (2 Kanals1
11 13.46
Storey) – District Chiniot
Construction of Municipal Corporation Office (8 Kanals1
12 134.0
Storey) – District Chiniot
New Construction of Dy. Dir. Development Office (2
13 85.54
Kanals 2 Storey) with 3 Vehicles - District Faisalabad
Constriction of Residences for C&W Department Officers
14 200.00
and Staff (1 Acre) - District Toba Tek Singh
Constriction of Residences for Education Department
15 200.00
Officers and Staff (1 Acre) - District Toba Tek Singh
Constriction of Residences for LG&CD Department
16 250.00
Officers and Staff (1 Acre) - District Toba Tek Singh
Provision of Missing Facilities (Meeting Room, Retiring
Room, Rest Area, Head Clerk Room, Cafeteria, parking
17 40.00
Shed, Record Room, A/V Facility at AC Office Peer Mahal
- District Toba Tek Singh
Construction of New Rest House for Peer Mahal (3 Kanals
18 51.17
Single Story) - District Toba Tek Singh
Construction of Four (04) New Community Centers for (3
19 132.0
Kanals Single Story) - District Toba Tek Singh
Construction of Four (04) New Community Centers for (3
20 132.0
Kanals Single Story) - District Jhang
Construction of Three (03) New Community Centers for
21 99.00
(3 Kanals Single Story) - District Chiniot
Construction of Four (04) New Community Centers for (3
22 132.0
Kanals Single Story) - District Faisalabad
Page 5 of 55
Cost
Sr. No. Schemes
(Million PKR)
Renovation of Metropolitan Committee Complex Peer
23 36.64
Mahal - District Toba Tek Singh
Construction of One (01) Press Club Peer Mahal (2
24 58.00
Kanals Double Story) - District Toba Tek Singh
Construction of GOR (15 Nos. of Houses) (1 Acre) – Peer
25 95.00
Mahal - District Toba Tek Singh
Renovation of Deputy Commissioner Office (5 Kanals) –
26 35.17
District Jhang
Renovation of Deputy Director Development Office (5
27 35.17
Kanals) – District Jhang
Construction of New DC Complex (Madhu Area) (4
28 200.00
Acres=1+3 Acres) - District Jhang
Construction of GOR (for Staff & Officers) (4 Acres=1+3) -
29 180.00
District Jhang
Construction of 01 New Circuit House (1 Acres=0.5 + 0.5,
30 157.32
2 Stories) - District Jhang
Renovation of Four (04) Assistant Commissioner Office (2
31 155.12
Kanals) – District Jhang
Construction of 01 New Circuit House (1 Acres=0.5 + 0.5,
32 157.32
2 Stories) - District Chiniot
Construction of New District Council Building(1 Acres=0.5
33 157.32
+ 0.5, 2 Stories) – District Jhang
Renovation of Existing Dy. Dir. Development Office (2
34 40.64
Kanals 2 Storey) - District Faisalabad
Construction of One (01) New P&D Officers Rest House
35 83.44
(3 Kanals Single Story) - District Faisalabad
Renovation of Existing Tehsil Offices in Four (04 Nos.)
36 117.92
Tehsils (3 Kanals) - District Faisalabad
Renovation of Existing Tehsil Offices in Four (04 Nos.)
37 117.92
Tehsils (3 Kanals) - District Chiniot
Renovation of Existing Tehsil Offices in Four (04 Nos.)
38 117.92
Tehsils (3 Kanals) - District Toba Tek Singh
Page 6 of 55
PUNJAB PLANNING AND POLICY SUPPORT PROGRAMME (P3SP)
FAISALABAD DIVISION REGIONAL PLAN
2
DISTRICT COURTS INFRASTRUCTURE
Under the P3SP Regional Plan Endeavor it was envisaged by the Infrastructure Team
of The Urban Unit (GoPb) to assess the District Courts facilities, find the gaps and
improvement points along with the conceptual layouts, estimated costs and proposed
development schemes through rigorous and vigorous field and facilities surveys of one
Districts of the Faisalabad Division. For achieving this goal, following facilities of this
organization were visited for example; District Courts, parking, waiting areas, water
and sanitation and allied structures etc.
Methodology Adopted
Following approach was adopted to attain the vital objectives and targets of field
assessment and other tasks for short term, medium term and long-term regional plans;
Page 7 of 55
Locations of Surveys and Facility Visits
Various facilities of District Courts Buildings in the following districts were visited during
December 2022 to January, 2023 surveys;
1) District Jhang
During the field surveys the gaps and improvement needs were observed, and based
on that following suggestions are tabulated;
Judicial Staff
Judicial Officers Improvement in Colony Office
Rest House Judges Parking (Furnished) 50 Renovation
Units
Façade
Hospital Evidence Writer
Improvement of Landscaping
Entitlement Vacancy / Post
Courts
Discounted Fee
Water Coolers Public Benches Notice Boards
for Staff Children
Solid Waste
CCTV Cameras Entrance Gates Management Solar System
(SWM)
Sub-Jails Canteen / Café First Aid Mosque / Prayer
Improvement Teria Arrangements Rooms
Interior Designing
Document School Bus for
E-Court Facility Oversee
Control System Staff Children
Trainings
Foreign Trainings
Additional Office Distemper & Oil Water
for Court Staff &
Story Paints Dispensers
Judges
Power
Paper Less Court - -
Generators
Page 8 of 55
Visit Pictures
Proposed Schemes
Following schemes are proposed for the development of the Faisalabad Division;
Cost
Sr. No. Schemes
(Million PKR)
Construction of One New District Courts Block (5
1 Kanals – Double Story) in Old DC Complex - District 157.87
Toba Tek Singh
Rehabilitation of Existing District Courts (5 Kanals) in
2 45.80
Old DC Complex - District Toba Tek Singh
Dismantling & New Construction of Old Court Room in
3 District Courts Complex (1 Kanal – Double Story) - 64.80
District Jhang
Construction of One New District Courts Block (5
4 157.87
Kanals – Double Story) - District Chiniot
Rehabilitation of Existing District Courts (5 Kanals) in
5 45.80
District Council / MC Office Complex - District Chiniot
Construction of New Rest House Building for Judges (2
6 71.60
Kanals - 2 Storied) - District Toba Tek Singh
Page 9 of 55
Cost
Sr. No. Schemes
(Million PKR)
Construction of New Rest House Building for Judges (2
7 71.60
Kanals - 2 Storied) - District Jhang
Construction of New Rest House Building for Judges (2
8 71.60
Kanals - 2 Storied) - District Chiniot
Page 10 of 55
PUNJAB PLANNING AND POLICY SUPPORT PROGRAMME (P3SP)
FAISALABAD DIVISION REGIONAL PLAN
3
GRAVEYARDS
Under the P3SP Regional Plan Endeavor it was envisaged by the Infrastructure Team
of The Urban Unit (GoPb) to assess the graveyard facilities, find the gaps and
improvement points along with the conceptual layout, estimated costs and proposed
development schemes through rigorous and vigorous filed and facilities surveys of all
the 4 Districts of the Faisalabad Division. For achieving this goal, following Graveyards,
Ablution Blocks, Toilets, Janazgah and allied facilities were visited.
Methodology Adopted
Following approach was adopted to attain the vital objectives and targets of field
assessment and other tasks for short term, medium term and long-term regional plans;
Several graveyards in the following 4 Districts were visited during December 2022 to
January 2023 surveys;
Page 11 of 55
1) District Toba Tek Singh
2) District Jhang
3) District Chiniot
4) District Faisalabad
During the field surveys the gaps and improvement needs were observed, and based
on that following suggestions are tabulated;
Page 12 of 55
Visit Pictures
Proposed Schemes
Following schemes are proposed for the development of the Faisalabad Division;
Cost
Sr. No. Schemes
(Million PKR)
Providing Missing Infrastructure Facilities at Gao-Shala
1 18.50
Graveyard - District Toba Tek Singh
Providing Missing Infrastructure Facilities at Mai Heer
2 25.00
Graveyard - District Jhang
Providing Missing Infrastructure Facilities at
3 25.00
Machianwala Graveyard - District Chiniot
Construction of Model Graveyard Shehr-e-Khamoshan
4 350.00
(295 GB) - District Toba Tek Singh
Construction of Model Graveyard Shehr-e-Khamoshan
5 350.00
- District Jhang
Construction of Model Graveyard Shehr-e-Khamoshan
6 350.00
- District Chiniot
Rehabilitation of 5 Nos. of Existing Graveyards under
7 150.00
MC - District Toba Tek Singh
Rehabilitation of 5 Nos. of Existing Graveyards under
8 150.00
MC Operation - District Jhang
Page 13 of 55
Cost
Sr. No. Schemes
(Million PKR)
Rehabilitation of 5 Nos. of Existing Graveyards under
9 150.00
MC Operation - District Chiniot
Rehabilitation of 5 Nos. of Existing Graveyards under
10 200.00
MC Operation - District Faisalabad
Page 14 of 55
PUNJAB PLANNING AND POLICY SUPPORT PROGRAMME (P3SP)
FAISALABAD DIVISION REGIONAL PLAN
4
RESCUE 1122
Under the P3SP Regional Plan Endeavor it was envisaged by the Infrastructure Team
of The Urban Unit (GoPb) to assess the RESCUE 1122 facilities, find the gaps and
improvement points along with the conceptual layout, estimated costs and proposed
development schemes through rigorous and vigorous filed and facilities surveys of all
the 4 Districts of the Faisalabad Division. For achieving this goal, infrastructure and
allied facilities at several RESCUE 1122 centers were visited.
Methodology Adopted
Following approach was adopted to attain the vital objectives and targets of field
assessment and other tasks for short term, medium term and long-term regional plans;
Page 15 of 55
Locations of Surveys and Facility Visits
Various facilities of RESCUE 1122 buildings in the following four districts were visited during
December 2022 to January 2023 surveys;
During the field surveys the gaps and improvement needs were observed, and based
on that following suggestions are tabulated;
Building
Parking Sheds Disaster Vans Fire Vehicles
Extension
Pictures
Page 16 of 55
Proposed Schemes
Following schemes are proposed for the development of the Faisalabad Division;
Cost
Sr. No. Schemes
(Million PKR)
Construction of New Building for RESCUE 1122
1 Sandianwala Town (Tehsil Pirmahal) (2 Kanals - 2 58.36
Storied) - District Toba Tek Singh
Provision of Missing Facilities (Office Building
2 Extension and all other allied facilitates) at RESCUE 30.23
1122 -(1 Kanal - 2 Storied) - District Jhang
Provision of Missing Facilities (Office Building
3 Extension and all other allied facilitates) at RESCUE 30.23
1122 - (1 Kanal - 2 Storied) - District Chiniot
Construction of One New Housing Unit for RESCUE
4 1122 Officers Residences (10 Marlas – 2 Storied) - 25.00
District Toba Tek Singh
Construction of One New Housing Unit for RESCUE
5 1122 Officers Residences (10 Marlas – 2 Storied) - 25.00
District Jhang
Construction of One New Housing Units for RESCUE
6 1122 Officers Residences (10 Marlas – 2 Storied) - 25.00
District Chiniot
Construction of One New Housing Units for RESCUE
7 1122 Officers Residences (10 Marlas – 2 Storied) - 25.00
District Faisalabad
Construction of Five (05) New RESCUE 1122 Facilities
8 310.60
(5 Kanals – 2 Storied) – District Jhang
Construction of Five (05) New RESCUE 1122 Facilities
9 310.60
(5 Kanals – 2 Storied) – District Toba Tek Singh
Construction of Six (06) New RESCUE 1122 Facilities
10 372.70
(5 Kanals – 2 Storied) – District Chiniot
Page 17 of 55
Cost
Sr. No. Schemes
(Million PKR)
Construction of Five (05) New RESCUE 1122 Facilities
11 310.60
(5 Kanals – 2 Storied) – District Faisalabad
Page 18 of 55
PUNJAB PLANNING AND POLICY SUPPORT PROGRAMME (P3SP)
FAISALABAD DIVISION REGIONAL PLAN
5
SOCIAL WELFARE, WOMEN DEVELOPMENT & BAIT-UL-MAAL
Under the P3SP Regional Plan Endeavor it was envisaged by the Infrastructure Team
of The Urban Unit (GoPb) to assess the Social Welfare, Women Development & Bait-
Ul-Maal facilities, find the gaps and improvement points along with the conceptual
layout, estimated costs and proposed development schemes through rigorous and
vigorous filed and facilities surveys of all the 4 Districts of the Faisalabad Division. For
achieving this goal, following infrastructure facilities were visited for example;
Nasheman, Old Age Home, Daar-ul-Aman, parking, mess and offices.
Methodology Adopted
Following approach was adopted to attain the vital objectives and targets of field
assessment and other tasks for short term, medium term and long-term regional plans;
Page 19 of 55
Locations of Surveys and Facility Visits
Various facilities of District administration buildings in the following four districts were
visited during December 2022 to January, 2023 surveys;
During the field surveys the gaps and improvement needs were observed, and based
on that following suggestions are tabulated;
Page 20 of 55
Interventions Interventions Interventions Interventions
Visit Pictures
Proposed Schemes
Following schemes are proposed for the development of the Faisalabad Division;
Cost
Sr. No. Schemes
(Million PKR)
Construction of Additional Story at Old Age Home -
1 26.72
District Toba Tek Singh
Construction of Additional Building for Old Age Home -
2 28.40
District Jhang
Construction of 2 New Buildings for Working Women
3 105.00
Hostel - District Chiniot (3 Kanals 2 Storey)
Construction of New Building for Working Women
4 52.45
Hostel - District Chiniot (3 Kanals 2 Storey)
Page 21 of 55
Cost
Sr. No. Schemes
(Million PKR)
Construction of New Building for Working Women
5 52.45
Hostel - District Toba Tek Singh (3 Kanals 2 Storey)
Construction of New Building for Working Women
6 52.45
Hostel - District Jhang (3 Kanals 2 Storey)
Construction of New Social Welfare Offices / Buildings
7 in 13 Tehsils of 4 Districts in Faisalabad Division (3 520.00
Kanals 2 Storey)
Page 22 of 55
PUNJAB PLANNING AND POLICY SUPPORT PROGRAMME (P3SP)
FAISALABAD DIVISION REGIONAL PLAN
6
POLICE STATION & POLICE CHOWKEES
Under the P3SP Regional Plan Endeavor it was envisaged by the Infrastructure Team
of The Urban Unit (GoPb) to assess the Police Station facilities, find the gaps and
improvement points along with the conceptual layout, estimated costs and proposed
schemes through rigorous and vigorous filed and facilities surveys of all the 4 Districts
of the Faisalabad Division. For achieving this goal, various Police Stations and allied
infrastructure were visited.
Methodology Adopted
Following approach was adopted to attain the vital objectives and targets of field
assessment and other tasks for short term, medium term and long-term regional plans;
Various facilities of Police Stations, Police Lines, Police Pickets, Police Chowkees, Barracks,
Parking Areas, Toilet Blocks, and allied buildings in the following four districts were visited
during December 2022 to January 2023 surveys;
Page 23 of 55
3) District Chiniot
4) District Faisalabad
During the field surveys the gaps and improvement needs were observed, and based
on that following suggestions are tabulated;
Admin Block
Gas Provision Geysers Roof Treatment
washrooms
Technical
Watch Towers Library needs Safe Lock-Ups
education
Laptops /
Steel Cabinets Tile Flooring Solar System
Computers
Mosque &
Printers Parking Space Pavers
Signage
Wireless &
Dry Batteries Toilet Blocks Solar systems
Amplifiers
Visit Pictures
Page 24 of 55
Proposed Schemes
Following schemes are proposed for the development of the Faisalabad Division;
Cost
Sr. No. Schemes
(Million PKR)
Construction of New Police Station - District Toba Tek
1 65.00
Singh (1 Storey 4 Kanals)
Construction of New Police Chowki at Peer Mahal –
2 14.00
District Toba Tek Singh (1 Storey 17 Marlas)
Construction of Two (02 Nos.) New Police Stations –
3 278.00
District Chiniot (05 Kanals 2 Stories)
Construction of Three (03 Nos.) New Police Chowki –
4 60.00
District Chiniot (01 Kanal 1 Storey)
Construction of Three (03 Nos.) New Police Chowki –
5 60.00
District Toba Tek Singh (01 Kanal 1 Storey)
Construction of Three (03 Nos.) New Police Chowki –
6 60.00
District Jhang (01 Kanal 1 Storey)
Construction of Three (05 Nos.) New Police Chowki –
7 100.00
District Faisalabad (01 Kanal 1 Storey)
Construction of New Police station for Kot Shaker -
8 139.00
District Jhang (5 Kanals 2 Stories)
Construction of new Police station for Thana City -
9 139.00
District Jhang (5 Kanals 2 Stories)
Construction of new Police station for Thana Sadar -
10 139.00
District Jhang (5 Kanals 2 Stories)
Construction of Three (03 Nos.) New DSP Offices for
11 Tehsil Bhawana, Tehsil Lalian, Tehsil Chiniot – District 226.45
Chiniot (2 Kanals – 2 Stories)
Construction of One (01 No.) SP Investigation Office –
12 30.93
District Chiniot (2 Kanals – 1 Storey)
Construction of One (01 No.) DSP Traffic Office – District
13 30.93
Chiniot (2 Kanals – 1 Storey)
Page 25 of 55
Cost
Sr. No. Schemes
(Million PKR)
Construction of One (01 No.) DPO Office – District
14 Chiniot (5 Kanals – 3 Storey) including Residence (3 107.92
Kanals – 2 Storey)
Construction of Three (03 Nos.) New Police Stations (Kot
15 Shakir, Thana City, Thana Sadar) – District Jhang (10 423.42
Kanals / Police Station – 3 Stories)
Revamping of Ten (10 Nos.) Police Stations and
16 202.00
Provision of Missing facilities - District Faisalabad
Revamping of Ten (10 Nos.) Police Stations and
17 202.00
Provision of Missing facilities - District Toba Tek Singh
Provision of Police Weapons, Ammunitions, Mobiles -
18 55.00
Division Faisalabad
Revamping of Ten (10 Nos.) Police Stations and
19 202.00
Provision of Missing facilities - District Jhang
Revamping of Ten (10 Nos.) Police Stations and
20 202.00
Provision of Missing facilities - District Chiniot
Revamping of Ten (40 Nos.) Police Chowki and Provision
21 400.00
of Missing facilities - District Chiniot
Construction of Police Training Institute - District
22 Faisalabad (16 Kanals - 2 Stories) including Hostel (3 304.28
Kanal – 3 Stories)
Total Cost (M) PKR 3,440.93
Page 26 of 55
PUNJAB PLANNING AND POLICY SUPPORT PROGRAMME (P3SP)
FAISALABAD DIVISION REGIONAL PLAN
7
CIVIL DEFENCE OFFICE
Under the P3SP Regional Plan Endeavor it was envisaged by the Infrastructure Team
of The Urban Unit (GoPb) to assess the Civil Defence offices and facilities, find the
gaps and improvement points along with the conceptual layout, estimated costs and
proposed development schemes through rigorous and vigorous filed and facilities
surveys of all the 4 Districts of the Faisalabad Division. For achieving this goal various
Civil Defence offices and facilities of this organization were visited.
Methodology Adopted
Following approach was adopted to attain the vital objectives and targets of field
assessment and other tasks for short term, medium term and long-term regional plans;
Various facilities of Civil Defence buildings in the following four districts were visited during
December 2022 to January 2023 surveys;
Page 27 of 55
2) District Jhang
3) District Chiniot
4) District Faisalabad
During the field surveys the gaps and improvement needs were observed, and based
on that following suggestions are tabulated;
Bomb Disposal
More Staff Bomb Suit Almirah + Cabins
Commander
Bomb Disposal
Bomb Disposal Pre-Post War Real Time X-Ray
Recovery
Kit Services Radiography
Vehicle
Advance Advance Motorcycles for On-Line
Trainings Process Manuals field staff Trainings
Fire Prevention CD + CCRC Fire
Parking Sheds
Equipment Office Extinguishers
Bomb Disposal Portable Remote Boundary Wall +
CCTV Cameras
Technician Control Vehicle Fences
Visit Pictures
Page 28 of 55
Proposed Schemes
Following schemes are proposed for the development of the Faisalabad Division;
Cost
Sr. No. Schemes
(Million PKR)
Rehabilitation of Civil Defence Office - District Toba
1 34.00
Tek Singh
Construction of New Civil Defence Office in Tehsil
2 30.00
Bhowana - District Chiniot (1 Kanal 2 Stories)
Construction of new Civil Defence Office in Tehsil
3 30.00
Lallian - District Chiniot (1 Kanal 2 Stories)
Provision of Latest Instruments & Equipment of Civil
4 60.00
Defence in District Faisalabad
Provision of Advance Trainings for Officials and Staff of
5 60.00
Civil Defence in District Faisalabad
Provision of 0.5 Km Access Road (TST) to Civil Defence
6 2.50
Office District Faisalabad
Total Cost (M) PKR 216.50
Page 29 of 55
PUNJAB PLANNING AND POLICY SUPPORT PROGRAMME (P3SP)
FAISALABAD DIVISION REGIONAL PLAN
08
GYMKHANA, LADIES CLUB
Under the P3SP Regional Plan Endeavor it was envisaged by the Infrastructure Team
of The Urban Unit (GoPb) to assess the, find the gaps and improvement points along
with the conceptual layout, estimated costs and proposed development schemes
through rigorous and vigorous filed and facilities surveys of all the 4 Districts of the
Faisalabad Division. For achieving this goal, few Gymkhana, Ladies Club facilities were
visited.
Methodology Adopted
Following approach was adopted to attain the vital objectives and targets of field
assessment and other tasks for short term, medium term and long-term regional plans;
Few Gymkhana and Ladies Club facilities in the following Districts were visited during
December 2022 to January 2023 surveys;
Page 30 of 55
1) District Toba Tek Singh
2) District Faisalabad
During the field surveys the gaps and improvement needs were observed, and based on that
following suggestions are tabulated;
Visit Pictures
Page 31 of 55
Proposed Schemes
Following schemes are proposed for the development of the Faisalabad Division;
Cost
Sr. No. Schemes
(Million PKR)
Construction of One (01 No.) New Ladies Club –
1 34.00
District Toba Tek Singh (2 Kanals 1 Story)
Construction of One (01 No.) New Ladies Club –
2 34.00
District Jhang (2 Kanals 1 Story)
Construction of One (01 No.) New Ladies Club –
3 34.00
District Chiniot (2 Kanals 1 Story)
Provision of Missing Facilities at Ladies Club - District
4 20.00
Faisalabad
Rehabilitation of Cricket Stadium along with the
5 Provision of Missing Facilities - District Toba Tek 190.52
Singh
Rehabilitation of Gymnasium along with the Provision
6 60.00
of Missing Facilities - District Toba Tek Singh
Page 32 of 55
PUNJAB PLANNING AND POLICY SUPPORT PROGRAMME (P3SP)
FAISALABAD DIVISION REGIONAL PLAN
9
LIBRARIES
Under the P3SP Regional Plan Endeavor it was envisaged by the Infrastructure Team
of The Urban Unit (GoPb) to assess the Library and allied facilities, find the gaps and
improvement points along with the conceptual layout, estimated costs and proposed
development schemes through rigorous and vigorous filed and facilities surveys of all
the 4 Districts of the Faisalabad Division. For achieving this goal, few libraries were
visited.
Methodology Adopted
Following approach was adopted to attain the vital objectives and targets of field
assessment and other tasks for short term, medium term and long-term regional plans;
Few library facilities in the following districts were visited during December 2022 to
January 2023 surveys;
Page 33 of 55
Field Survey Findings with Gaps
During the field surveys the gaps and improvement needs were observed, and based on that
following suggestions are tabulated;
Repair &
Book Racks
Maintenance of New Books More Staff / HR
(Metal / Wooden)
Buildings
Library
Benches for
LEDs Management Generators
Public
Software
Affiliation with
Water
Educational MOU Office Furniture
Dispensers
Institutes
Reading Section Photocopy
Solar System CCTV
for Children Machine
Notice Boards &
Printers Scanners Air Conditioners
Standees
Labeling &
Parking Space First Aid Boxes Maps
Signage
Anti-Termite
Fire
Improved Toilets Furniture Treatment of
Extinguishers
Books
Room for Newspaper
Laptops Guard Room
Females Racks
More Library
Newspapers & UPS Management -
Magazines Trainings
Visit Pictures
Page 34 of 55
Proposed Schemes
Following schemes are proposed for the development of the Faisalabad Division;
Cost
Sr. No. Schemes
(Million PKR)
Establishment of Ilma Public Library - District Toba Tek
1 33.00
Singh
Establishment of Public Library - District Jhang (3
2 50.00
Kanals Single Storey)
Establishment of Public Library - District Chiniot (3
3 50.00
Kanals Single Storey)
Establishment of Public Library - District Faisalabad (3
4 80.00
Kanals Single Storey)
Construction of E-Library and all facilities including
5 new work stations at District Jhang (4 Kanals – 2 60.00
Stories)
Page 35 of 55
PUNJAB PLANNING AND POLICY SUPPORT PROGRAMME (P3SP)
FAISALABAD DIVISION REGIONAL PLAN
10
PUNJAB PRISONS DEPARTMENT
Under the P3SP Regional Plan Endeavor it was envisaged by the Infrastructure Team
of The Urban Unit (GoPb) to assess the Punjab Prisons Department facilities, find the
gaps and improvement points along with the conceptual layout, estimated costs and
proposed development schemes through rigorous and vigorous filed and facilities
surveys of few Districts of the Faisalabad Division. For achieving this goal, few Punjab
Prisons Department and allied facilities were visited.
Methodology Adopted
Following approach was adopted to attain the vital objectives and targets of field
assessment and other tasks for short term, medium term and long-term regional plans;
Various facilities of Jails buildings in the following Districts were visited during December 2022
to January 2023 surveys;
Page 36 of 55
2) District Jhang
During the field surveys the gaps and improvement needs were observed, and based
on that following suggestions are tabulated;
Hospital Staff
More Staff Duty Hours
Affiliation Accommodation
Separate
Investigation Recovery Sheds New Barracks Safe Lock-Ups
Room
Police Housing
Prison Vans Furniture Store Rooms
Colony
Laptops /
Steel Cabinets Tile Flooring Solar System
Computers
Printers Gas Pipe Mosque &
RO Plant
Geysers Replacement Signage
Wireless &
Dry Batteries Toilet Blocks Solar Systems
Amplifiers
False Ceiling /
Distempering IT Equipment Solarisation
Roof Repair
Timely Permanent Front
Watch Towers Mess
Promotions Desk
Sui Gas Pipe
Line New Water Well Water Dispenser -
Replacement
Visit Pictures
Page 37 of 55
Proposed Schemes
Following schemes are proposed for the development of the Faisalabad Division;
Cost
Sr. No. Schemes
(Million PKR)
Rehabilitation of District Jail Toba Tek Singh & Provision
1 179.29
of Missing Facilities - District Toba Tek Singh
Rehabilitation of District Jail Jhang & Provision of
2 108.00
Missing Facilities - District Jail Jhang
Rehabilitation of District Jail Faisalabad & Provision of
3 100.00
Missing Facilities - District Jail Faisalabad
Page 38 of 55
PUNJAB PLANNING AND POLICY SUPPORT PROGRAMME (P3SP)
FAISALABAD DIVISION REGIONAL PLAN
11
DAY CARE CENTRE
Under the P3SP Regional Plan Endeavor it was envisaged by the Infrastructure Team
of The Urban Unit (GoPb) to assess the Day Care centers and facilities, find the gaps
and improvement points along with the conceptual layout, estimated costs and
proposed development schemes through rigorous and vigorous filed and facilities
surveys of all the 4 Districts of the Faisalabad Division. For achieving this goal, various
Day Care centers and allied facilities were visited.
Methodology Adopted
Following approach was adopted to attain the vital objectives and targets of field
assessment and other tasks for short term, medium term and long-term regional plans;
Various Day Care Centers and facilities and buildings in the following few Districts were
visited during December 2022 to January 2023 surveys;
Page 39 of 55
3) District Chiniot
During the field surveys the gaps and improvement needs were observed, and based
on that following suggestions are tabulated;
Repair &
False Ceiling Book Racks Certified Staff
Maintenance
Benches for Kids Learning
LEDs Elec. Generators
Children Toys
ABC Guide Elect. Water
Solar systems Office Furniture
Books Dispensers
Reading Section Notice Boards &
Printers CCTV
for Children Standees
Room for
Labeling &
First Aid Box Air conditioners Females Trainers
signage
/ Nannies
More
Tabs for Kids UPS Newspapers & -
Magazines
Visit Pictures
Page 40 of 55
Proposed Schemes
Following schemes are proposed for the development of the Faisalabad Division;
Cost
Sr. No. Schemes
(Million PKR)
Provision of Missing Facilities and Establishment of
1 New Day Care Centers in Ten (10 Nos.) District 40.00
Government Departments – District Toba Tek Singh
Provision of Missing Facilities and Establishment of
2 New Day Care Centers in Ten (10 Nos.) District 40.00
Government Departments – District Jhang
Provision of Missing Facilities and Establishment of
3 New Day Care Centers in Ten (10 Nos.) District 40.00
Government Departments – District Chiniot
Provision of Missing Facilities and Establishment of
4 New Day Care Centers in Ten (10 Nos.) District 40.00
Government Departments – District Faisalabad
Page 41 of 55
PUNJAB PLANNING AND POLICY SUPPORT PROGRAMME (P3SP)
FAISALABAD DIVISION REGIONAL PLAN
12
ZOO & ZOO SAFARI
Under the P3SP Regional Plan Endeavor it was envisaged by the Infrastructure Team
of The Urban Unit (GoPb) to assess the Zoo, Mini Zoos, Zoo Safari and allied facilities,
find the gaps and improvement points along with the conceptual layout, estimated costs
and proposed development schemes through rigorous and vigorous filed and facilities
surveys of all the 4 Districts of the Faisalabad Division. As there are no Zoo, Mini Zoos,
Zoo Safari and allied facilities in the 4 Districts of the Division hence few development
schemes are proposed.
Methodology Adopted
Following approach was adopted to attain the vital objectives and targets of field
assessment and other tasks for short term, medium term and long-term regional plans;
During the field surveys the gaps and improvement needs were observed, and based
on that following suggestions are tabulated;
Page 42 of 55
Interventions Interventions Interventions Interventions
Walk through
Lion Safari Play Land Lawns
aviary
Animal Ride
Solar System Natural Garden Ticketing Booth
Platform
Administration
Jurassic Park Mosque Education Station
Office
Children play
Lake Fish Aquarium Waiting Area
Area
4+8 4 4 4 10 6 12 6
Wild
Vultures Bulbul Pigeon Dove Ducks Monkey Tortoise
Cat
4 10 12 8 12 6 4 4
Black
Lamay Uryal Chinkarah Zeebra Lion Tiger Fish
Deer
5 4 6 12 4 4 4 50
Wildlife Field
Junior Hatcher Bookin Naib
Superviso Compound Electrician Driver
Clerk y Man g Clerk Qasid
r er
Page 43 of 55
Human Resources Requirement for 01 Zoo
2 2 2 2 2 2 4 4
Data
Green
Khakroo Security Animal Stenograph Watche Entry
Baildar Man/Ma
b Guards Keeper er r Operato
li
r
2 4 4 4 2 2 2 2
Proposed Layouts
Page 44 of 55
Proposed Schemes
Following schemes are proposed for the development of the Faisalabad Division;
Cost
Sr. No. Schemes
(Million PKR)
PC-II for 01 New Mini Zoo District Sargodha - District
1 15.00
Toba Tek Singh
PC-II for 01 New Mini Zoo District Sargodha - District
2 15.00
Jhang
PC-II for 01 New Mini Zoo District Sargodha - District
3 15.00
Chiniot
PC-II for 01 Zoo Safari District Sargodha - District
4 20.00
Faisalabad
Construction of 01 Mini Zoo with Animals and Birds -
5 250.00
District Toba Tek Singh
Construction of 01 Mini Zoo with Animals and Birds -
6 250.00
District Jhang
Construction of 01 Mini Zoo with Animals and Birds -
7 250.00
District Chiniot
Construction of 01 Zoo Safari with Animals and Birds -
8 500.00
District Faisalabad
Total Cost (M) PKR 1,315.00
Page 45 of 55
PUNJAB PLANNING AND POLICY SUPPORT PROGRAMME (P3SP)
FAISALABAD DIVISION REGIONAL PLAN
12
ROAD MONUMENTS & GANTRIES
Under the P3SP Regional Plan Endeavor it was envisaged by the Infrastructure Team
of The Urban Unit (GoPb) to assess the Road Monuments, city gantries and allied
facilities, find the gaps and improvement points along with the conceptual layout,
estimated costs and proposed development schemes through rigorous and vigorous
filed and facilities surveys of all the 4 Districts of the Faisalabad Division. For achieving
this goal, existing road monuments, city gantries and allied infrastructure (soft & hard)
were visited.
Methodology Adopted
Following approach was adopted to attain the vital objectives and targets of field
assessment and other tasks for short term, medium term and long-term regional plans;
Various road monuments facilities and allied infrastructure, soft and hard arrangements of
PHA, and road belts in the following four districts were visited during December 2022 to
January 2023 surveys;
Page 46 of 55
1) District Toba Tek Singh
2) District Jhang
3) District Chiniot
4) District Faisalabad
During the field surveys the gaps and improvement needs were observed, and based on that
following suggestions are tabulated;
Visit Pictures
Page 47 of 55
Proposed Schemes
Following schemes are proposed for the development of the Faisalabad Division;
Cost
Sr. No. Schemes
(Million PKR)
Construction of 20 Nos. Road Monuments & 8 City
1 130.00
Entrance Gantries - District Toba Tek Singh
Construction of 20 Nos. Road Monuments & 8 City
2 129.00
Entrance Gantries - District Jhang
Construction of 15 Nos. Road Monuments & 6 City
3 105.00
Entrance Gantries - District Chiniot
Construction of 30 Nos. Road Monuments & 10 City
4 214.00
Entrance Gantries - District Faisalabad
Beautification of 10 KMs of Main Toba Tek
Singh~Rajana Road (including Green Belts, Road
5 Signage, Electric Poles, Land Scaping & Arboriculture 500.00
at & around Stadium Gate, DHQ, Kashmir Park, Model
High School) - District Toba Tek Singh
Construction of 10 Model Bus Stops - District Toba Tek
6 18.00
Singh
7 Construction of 15 Model Bus Stops - District Jhang 27.00
8 Construction of 10 Model Bus Stops - District Chiniot 18.00
Construction of 20 Model Bus Stops - District
9 36.00
Faisalabad
Revamping and Beautification of Teko Park (307,478
10 20.00
Sq. Ft) - District Toba Tek Singh
Rehabilitation of HUD& PHED Parks & Horticulture
11 20.00
Nursery (10 Acres) - District Faisalabad
Page 48 of 55
Cost
Sr. No. Schemes
(Million PKR)
Hard & Soft Landscaping and Beautification of 100
12 50.00
Potentials Spots in 6 Tehsils - District Faisalabad
Hard & Soft Landscaping and Beautification of 60
13 30.00
Potentials Spots in 4 Tehsils - District Jhang
Hard & Soft Landscaping and Beautification of 45
14 22.50
Potentials Spots in 3 Tehsils - District Chiniot
Hard & Soft Landscaping and Beautification of 60
15 30.00
Potentials Spots in 4 Tehsils - District Toba Tek Singh
Provision of Equipment & Machinery for HUD& PHED
16 40.00
Parks & Horticulture - District Faisalabad
Renovation of Existing 100 Nos. Parks (2 Kanal Each)
17 380.00
- District Faisalabad
Renovation of Existing 20 Nos. Parks (2 Kanal Each) -
18 76.00
District Jhang
Renovation of Existing 15 Nos. Parks (2 Kanal Each) -
19 57.00
District Chiniot
Renovation of Existing 20 Nos. Parks (2 Kanal Each) -
20 76.00
District Toba Tek Singh
Total Cost (M) PKR 1,979.00
Page 49 of 55
PUNJAB PLANNING AND POLICY SUPPORT PROGRAMME (P3SP)
FAISALABAD DIVISION REGIONAL PLAN
14
HOSPITALS, COLLEGES & OTHER INFRASTRUCTURES
Under the P3SP Regional Plan Endeavor it was envisaged by the Infrastructure Team
of The Urban Unit (GoPb) to assess the Hospitals, Colleges & other Infrastructures and
Allied facilities, find the gaps and improvement points along with the conceptual layout,
estimated costs and proposed development schemes through rigorous and vigorous
filed and facilities surveys of all the 4 Districts of the Faisalabad Division.
Methodology Adopted
Following approach was adopted to attain the vital objectives and targets of field
assessment and other tasks for short term, medium term and long-term regional plans;
Few hospitals, colleges and allied infrastructure were visited during December 2022 to January
2023 surveys;
Page 50 of 55
Field Survey Findings with Gaps (City Hospital)
During the field surveys the gaps and improvement needs were observed, and based on that
following suggestions are tabulated;
Gynecological Ultrasound
Operation Theater CCTV Cameras
Ward Equipment
Field Survey Findings with Gaps (District Chiniot – Education Girls College)
During the field surveys several gaps and improvement needs were observed.
Page 51 of 55
Proposed Schemes
Following schemes are proposed for the development of the Faisalabad Division;
Cost
Sr. No. Schemes
(Million PKR)
Construction of New Gynecological Ward cum
1. Emergency Ward in City Hospital - District Toba Tek 30.00
Singhct Toba Tek Singh
Renovation and Provision of Missing Facilities at
2. Existing Blocks of City Hospital - District Toba Tek 32.64
Singh
Landscaping and Road Resurfacing of Existing Roads
3. 20.00
inside City Hospital - District Toba Tek Singh
Rehabilitation of 8 Nos. of Rural Health Centers (RHCs)
4. 180.68
- District Toba Tek Singh
Rehabilitation of 20 Nos. of Basic Health Unit (BHUs) -
5. 833.36
District Toba Tek Singh
Rehabilitation of 10 Nos. of Dispensaries - District
6. 55.80
Toba Tek Singh
Renovation of Chief Executive Officer Complex - District
7. 25.48
Health Authority - District Toba Tek Singh
Rehabilitation of 8 Nos. of Rural Health Centers (RHCs)
8. 180.68
- District Jhang
Rehabilitation of 20 Nos. of Basic Health Unit (BHUs) -
9. 833.36
District Jhang
Rehabilitation of 10 Nos. of Dispensaries - District
10. 55.80
Jhang
Rehabilitation of 8 Nos. of Rural Health Centers (RHCs)
11. 180.68
- District Chiniot
Rehabilitation of 20 Nos. of Basic Health Unit (BHUs) -
12. 833.36
District Chiniot
Rehabilitation of 10 Nos. of Dispensaries - District
13. 55.80
Chiniot
Page 52 of 55
Cost
Sr. No. Schemes
(Million PKR)
Rehabilitation of 8 Nos. of Rural Health Centers (RHCs)
14. 180.68
- District Faisalabad
Rehabilitation of 20 Nos. of Basic Health Unit (BHUs) -
15. 833.36
District Faisalabad
Rehabilitation of 10 Nos. of Dispensaries - District
16. 55.80
Faisalabad
New Grain Market Infrastructure on 10 Acres at Jhang
17. 728.00
Road Near Forest Market – District Toba Tek Singh
Construction of Four (4) New Education Complexes (4
18. 278.23
Kanals 2 Stories) - District Toba Tek Singh
Construction of Four (4) New Education Complexes (4
19. 278.23
Kanals 2 Stories) - District Jhang
Construction of Three 3 New Education Complexes (4
20. 208.68
Kanals 2 Stories) - District Chiniot
Construction of Four (4) New Education Complexes (4
21. 278.23
Kanals 2 Stories) - District Faisalabad
Construction of 01 New IT University (1 Acre = 4 Kanals
22. 250.00
2 Stories) - District Chiniot
Replacement of Old Sewerage Line 5.0 KM Length of
23. 100.00
72” Dia. - District Chiniot
Construction of 01 No. New General Bus Stand (3
24. 250.00
Acres = 2.0+1.0) - District Chiniot
Construction of 01 New Education Block & 1 New Girls
25. Hostel at Nusrat Jahan Girls College Chenab Nagar (10 600.00
Kanals 3 Stories) - District Chiniot
Construction of 01 New Museum with all Facilities &
26. Archives & Antiques (6 Kanals 2 Stories - District 200.00
Faisalabad
New Grain Market Infrastructure on 10 Acres at Jhang
27. 728.00
Road Near Forest Market – District Toba Tek Singh
Construction of Four (4) New Education Complexes (4
28. 278.23
Kanals 2 Stories) - District Toba Tek Singh
Construction of Four (4) New Education Complexes (4
29. 278.23
Kanals 2 Stories) - District Jhang
Construction of Three 3 New Education Complexes (4
30. 208.68
Kanals 2 Stories) - District Chiniot
Construction of Four (4) New Education Complexes (4
31. 278.23
Kanals 2 Stories) - District Faisalabad
Page 53 of 55
Cost
Sr. No. Schemes
(Million PKR)
Construction of 01 New IT University (1 Acre = 4 Kanals
32. 250.00
2 Stories) - District Chiniot
Replacement of Old Sewerage Line 5.0 KM Length of
33. 100.00
72” Dia. - District Chiniot
Construction of 01 No. New General Bus Stand (3
34. 250.00
Acres = 2.0+1.0) - District Chiniot
Construction of 01 New Education Block & 1 New Girls
35. Hostel at Nusrat Jahan Girls College Chenab Nagar (10 600.00
Kanals 3 Stories) - District Chiniot
Construction of Four (04 Nos.) New SDO Offices (C&W
36. 184.32
Buildings) in 4 Tehsils (2 Kanals) - District Faisalabad
Construction of Four (04 Nos.) New SDO Offices (C&W
37. 184.32
Buildings) in 4 Tehsils (2 Kanals) - District Jhang
Construction of Three (03 Nos.) New SDO Offices
38. (C&W Buildings) in 3 Tehsils (2 Kanals) - District 138.24
Chiniot
Construction of Four (04 Nos.) New SDO Offices (C&W
39. Buildings) in 4 Tehsils (2 Kanals) - District Toba Tek 184.32
Singh
Renovation of C&W Complex (8 Kanals) - District
40. 314.64
Faisalabad
Construction of Two (02) New Medical cum Teaching
41. Hospitals with all Facilities Near By Pass - District 1,200.00
Faisalabad
Construction of 01 New IT University (1 Acre = 4 Kanals
42. 350.00
2 Stories) - District Faisalabad
Construction of One (01) Technical Training Institute (1
43. 350.00
Acre = 4 Kanals 2 Stories) - District Faisalabad
City Development Package for Faisalabad - District
44. 2,000.00
Faisalabad
City Development Package for Faisalabad - District
45. 1,000.00
Jhang
City Development Package for Faisalabad - District
46. 1,000.00
Chiniot
City Development Package for Faisalabad - District
47. 1,000.00
Toba Tek Singh
Tehsil Development Package for 2Tehsils - District
48. 1,000.00
Chiniot
Tehsil Development Package for 3 Tehsils - District
49. 1,500.00
Jhang
Page 54 of 55
Cost
Sr. No. Schemes
(Million PKR)
Tehsil Development Package for 3 Tehsils - District
50. 1,500.00
Toba Tek Singh
Tehsil Development Package for 3 Tehsils - District
51. 1,500.00
Faisalabad
Total Cost (M) PKR 23,936.00
Page 55 of 55