You are on page 1of 4

ARCHITECTURE WORKS FOR TOWER C REMARK: C1 C2 C3 C4 C5 95%= window area subframe issue

DATE : 03/08/2023 C6 C7 C8 C9 C10


C11 C12 C13 C14 C15
C16 C17 C18 C19 C20
C21 C22

Level Brick Door Frame Plaster Window Subframe Soffit skim coat Ceiling frame Ceiling board Toilet ceiling frame Toilet ceiling board

Ground Floor

95 95 95 95 95 100 100 100 100 100 / 50 50 50 50 / / / / /


95 95 95 95 95 100 100 100 100 100 / 50 70 40 40 / / 80 40 90
1st Floor 95 95 95 95 95 100 100 100 100 100 40 40 40 60 / 90 90 90 90 /
95 40 95 95 95 100 40 100 100 100 / / / / 40 / / / / /
70 95 75 100 / 40 / /
/ / / / 60 / / / / /
/ / / 60 80 / / 70 70 100
2nd Floor 95 95 95 95 / 100 100 100 100 /
/ 35 / / / / 70 / / /
/ / / / / / / / / /

3rd Floor

4th Floor

5th Floor

6th Floor

7th Floor

8th Floor

Motor Room/Lower Roof

Page 1 of 4
ARCHITECTURE W
DATE : 03/08

Level Water proofing Water proofing (balcony) Bonding test Living Screed Bedroom Screed Wet / toilet screed Vinyl tiles Kitchen tiles Toilet tiles Y

Ground Floor

1st Floor

2nd Floor

3rd Floor

4th Floor

5th Floor

6th Floor

7th Floor

8th Floor

Motor Room/Lower Roof

Page 2 of 4
ARCHITECTURE W
DATE : 03/08

Level Yard tiles Sliding door & window frame Balcony Screeding Window Subframe Balcony tiles Door leaf Window leaf Internal Wall Painting External Wall Painting Ceiling Pain

Ground Floor 70

1st Floor

2nd Floor

3rd Floor

4th Floor

5th Floor

6th Floor

7th Floor

8th Floor

Motor Room/Lower Roof

Page 3 of 4
ARCHITECTURE W
DATE : 03/08

Level nting Wall Skim Coat Sliding Door Door Leaf Refuse Room Electrical Room M&E Room Staircase Nosing Tile Staircase FD & Brick Corridor Screeding Corridor Tile Corridor & lift Ceiling

Ground Floor

1st Floor 30

2nd Floor

3rd Floor

4th Floor

5th Floor

6th Floor

7th Floor

8th Floor

Motor Room/Lower Roof

Page 4 of 4