Level Brick Door Frame Plaster Window Subframe Corridor Plastering Ceiling frame Ceiling board Toilet ceiling frame Toilet ceiling board
Ground Floor
95 95 95 95 95 100 100 100 100 100 30 50 50 50 50 / / / / / 100 100 100 100 100
95 95 95 95 95 100 100 100 100 100 40 50 70 40 40 / / 80 40 90 100 / / / /
1st Floor 95 95 95 95 95 100 100 100 100 100 40 40 40 60 40 90 90 90 90 / / 60 100 / /
95 40 95 95 95 100 40 100 100 100 40 / 40 30 40 / / / / / / / / / 100
70 95 75 100 / 40 / / 70 100
/ 30 60 90 95 / 50 80 100 100
50 80 95 95 95 50 100 100 100 100
2nd Floor 95 95 95 95 80 100 100 100 100 90
80 95 / 50 / 90 100 / 70 /
/ 30 50
3rd Floor
4th Floor
5th Floor
6th Floor
7th Floor
8th Floor
Page 1 of 4
ARCHITECTURE W
DATE : 03/08
Level Water proofing Water proofing (balcony) Bonding test Living Screed Bedroom Screed Wet / toilet screed Vinyl tiles Kitchen tiles Toilet tiles
Ground Floor
1st Floor
2nd Floor
3rd Floor
4th Floor
5th Floor
6th Floor
7th Floor
8th Floor
Page 2 of 4
ARCHITECTURE W
DATE : 03/08
Level Yard tiles Sliding door & window frame Balcony Screeding Soffit SkimCoat Balcony tiles Door leaf Window leaf Internal Wall Painting External Wall Painting
Ground Floor
1st Floor
2nd Floor
3rd Floor
4th Floor
5th Floor
6th Floor
7th Floor
8th Floor
Page 3 of 4
ARCHITECTURE W
DATE : 03/08
Level Ceiling Painting Wall Skim Coat Sliding Door Door Leaf Refuse Room Electrical Room M&E Room Staircase Nosing Tile Staircase FD & Brick Corridor Screeding Corridor Tile Corridor & lift Ceiling
Ground Floor
1st Floor 30
2nd Floor
3rd Floor
4th Floor
5th Floor
6th Floor
7th Floor
8th Floor