ETHIOPIA
Report on
of
MISKU SUSPENDED BRIDGE
over
Tsetseka
Submitted by
Mode of Execution
Cost Estimate 1
Pedestrain Trail Bridge Burundi
TTRAIL BRIDGE IN ETHIOPIA
ETHIOPIA
SPECIAL TRAIL BRIDGE PROJECT
Cost Estimate 2
Pedestrain Trail Bridge Burundi
TOTAL 400 TRANSPORTATION 308,121.78
Cost Estimate 3
Pedestrain Trail Bridge Burundi
Cost Estimate 4
Pedestrain Trail Bridge Burundi
363 INSURANCE
1 Labours (20 persons) person 20.0 0.00
Cost Estimate 6
Pedestrain Trail Bridge Burundi
Requirement of
Require- Sand Rubble/
Item Unit Quantity nment per Cement Block
Gravel Bldr
Unit Stone
(bags) ( m3 ) ( m3
( m3 )
( m3 ) )
4.40 0.00
551 Plain Mass Concrete
m3 0.00 0.47 0.00
1:3:6
0.89 0.00
6.40 155.14
552 Reinforced Cement
m3 24.24 0.45 10.79
Concrete 1:2:4
0.85 20.60
2.64 364.32
0.28 38.64
553 Plum Concrete 40% m3 138.00
0.54 74.52
0.50 69.00
2.28 46.79
1.10 22.57
1.50 61.56
1.10 45.14
9.12 18.42
564 Cement Plaster (1:4) m3 2.02
1.31 2.65
Cost Estimate 7
Pedestrain Trail Bridge Burundi
Cost Estimate 8
Pedestrain Trail Bridge Burundi
Unit
Description Unit Rate Unit Cost
Quantity
Total Cost (1+2) 19.31
Vat 13% 2.51
Total cost per kg 21.82
Cost Estimate 9
Pedestrain Trail Bridge Burundi
Unit
Description Unit Rate Unit Cost
Quantity
400 TRANSPORTATION
420 Transportation by Truck (Steel Parts, Cables, Cement, Tools & Other Materials) per ton
Metalled Road 720.00 1.00 5.000 3600.00
Sekota To (Ziquala) Road head
Non-Metalled Road 58.00 1.00 10.000 580.00
Total Per ton 4180.00
Total per kg 4.18
430 Portering Road head to Site per 1000kg
441 Materials except Cables & Cement (Rate=Daily Wage/40) 0.15 1000 250.00 937.50
Sub-total per 1000 kg 937.50
Total cost per kg transportation of materials except cables 0.94
442 Cables, Bulldog Grips & Tools (Rate=Daily Wage/22) 0.15 1000 250.00 1704.55
Sub-total per 1000 kg 1704.55
Total cost per kg transportation of wire ropes 1.70
443 Cement (Rate=Daily Wage/40) 0.15 1000 250.00 937.50
Sub-total per 1000 kg 937.50
Total cost per kg transportation of wire ropes 0.94
500 CONSTRUCTION WORKS
510 Site Clearance per m2
Labour unskilled md 0.06 250.00 15.00
Cost per m2 15.00
520 All Excavation
521 Soil
Labour unskilled md 0.80 250.00 200.00
Cost per m3 200.00
522 Soft Rock
Labour unskilled md 1.40 250.00 350.00
Cost per m3 350.00
523 Hard Rock (Quarrying)
Material Fuel ltr 2.20 31.22 68.68
Labour unskilled md 1.65 250.00 412.50
Cost per m3 481.18
524 Hard Rock by Blasting
Material Fuel ltr 2.20 31.22 68.68
Labour skilled md 0.04 550.00 22.00
unskilled md 1.65 250.00 412.50
Cost per m3 503.18
530 Foundation Excavation
531 Soil
Labour unskilled md 1.69 250.00 422.50
Cost per m3 422.50
532 Soft Rock
Labour unskilled md 2.50 250.00 625.00
Cost per m3 625.00
533 Hard Rock by Quarrying
Material Fuel ltr 4.00 31.22 124.87
Labour unskilled md 5.50 250.00 1375.00
Cost per m3 1499.87
534 Hard Rock by Blasting
Material Fuel ltr 2.20 31.22 68.68
Labour skilled md 0.04 550.00 22.00
unskilled md 4.40 250.00 1100.00
Cost per m3 1190.68
535 Hard Rock by Chiselling
Labour unskilled md 25.20 250.00 6300.00
Cost per m3 6300.00
536 Backfilling
Cost Estimate 10
Pedestrain Trail Bridge Burundi
Unit
Description Unit Rate Unit Cost
Quantity
Labour unskilled md 0.85 250.00 212.50
Cost per m3 212.50
Cost Estimate 11
Pedestrain Trail Bridge Burundi
Unit
Description Unit Rate Unit Cost
Quantity
540 Gabions Works
541 Box Size 2.0 x 1.0 x 1.0
Material Mesh Wire 10 SWG kg 12.08 45.19 545.89
Selvage Wire 7 SWG kg 1.58 45.19 71.40
Binding Wire 12 SWG kg 0.48 45.19 21.69
Rubble m3 1.10 1192.50 1311.75
Labour Fabrication of Gabion skilled md 0.23 550.00 126.50
unskilled md 0.10 250.00 25.00
Construction of Gabions unskilled md 0.20 250.00 50.00
Cost per m3 2152.23
542 Box Size 3.0 x 1.0 x 1.0
Material Mesh Wire 10 SWG kg 11.70 45.19 528.72
Selvage Wire 7 SWG kg 1.37 45.19 61.91
Binding Wire 12 SWG kg 0.43 45.19 19.43
Rubble m3 1.10 1192.50 1311.75
Labour Fabrication of Gabion skilled md 0.21 550.00 115.50
unskilled md 0.10 250.00 25.00
Construction of Gabions unskilled md 0.20 250.00 50.00
Cost per m3 2112.31
543 Box Size 2.0 x 1.0 x 0.3
Material Mesh Wire 10 SWG kg 22.33 45.19 1009.08
Selvage Wire 7 SWG kg 3.75 45.19 169.46
Binding Wire 12 SWG kg 1.08 45.19 48.80
Rubble m3 1.10 1192.50 1311.75
Labour Fabrication of Gabion skilled md 0.44 550.00 242.00
unskilled md 0.20 250.00 50.00
Construction of Gabions unskilled md 0.20 250.00 50.00
Cost per m3 2881.10
544 Box Size 3.0 x 1.0 x 0.3
Material Mesh Wire 10 SWG kg 21.94 45.19 991.46
Selvage Wire 7 SWG kg 3.33 45.19 150.48
Binding Wire 12 SWG kg 1.00 45.19 45.19
Rubble m3 1.10 1192.50 1311.75
Labour Fabrication of Gabion skilled md 0.41 550.00 225.50
unskilled md 0.19 250.00 47.50
Construction of Gabions unskilled md 0.20 250.00 50.00
Cost per m3 2821.88
550 Concrete Works
551 Plain Mass Concrete 1:3:6
Material Cement bag 4.40 500.00 2200.00
Gravel (5-40 mm) m3 0.89 1542.50 1372.83
Sand m3 0.47 1497.50 703.82
Labour skilled md 1.00 550.00 550.00
unskilled md 4.00 250.00 1000.00
Cost per m3 5826.65
552 Reinforcement Cement Concrete 1:2:4
Material Cement bag 6.40 500.00 3200.00
Gravel (5-40 mm) m3 0.85 1542.50 1311.13
Sand m3 0.45 1497.50 673.88
Labour skilled md 1.00 550.00 550.00
unskilled md 4.00 250.00 1000.00
Cost per m3 6735.00
553 Plum Concrete (1:3:6)+40% Boulder
Material Cement bag 2.64 500.00 1320.00
Gravel (5-40 mm) m3 0.54 1542.50 832.95
Sand m3 0.28 1497.50 419.30
Boulders (225 mm) m3 0.50 1192.50 596.25
Labour skilled md 0.50 550.00 275.00
unskilled md 4.00 250.00 1000.00
Cost per m3 4443.50
554 Form Work
Material Wood m3 0.01 0.00 0.00
Nails kg 0.03 44.60 1.34
Labour skilled md 0.78 550.00 429.00
Cost Estimate 12
Pedestrain Trail Bridge Burundi
Unit
Description Unit Rate Unit Cost
Quantity
unskilled md 0.62 250.00 155.00
Cost per m2 585.34
Cost Estimate 13
Pedestrain Trail Bridge Burundi
Unit
Description Unit Rate Unit Cost
Quantity
560 Masonry Mortar Works
561 Dry Stone Masonry or Pitching
Material Rubble m3 1.10 1192.50 1311.75
Labour skilled md 1.00 550.00 550.00
unskilled md 2.00 250.00 500.00
Cost per m3 2361.75
562 Rubble Masonry 1:4
Material Cement bag 2.28 500.00 1140.00
Sand m3 0.45 1497.50 673.88
Stone m3 1.10 1192.50 1311.75
Labour skilled md 1.50 550.00 825.00
unskilled md 5.00 250.00 1250.00
Cost per m3 5200.63
563 Rubble Masonry 1:6
Material Cement bag 1.50 500.00 750.00
Sand m3 0.47 1497.50 703.82
Stone m3 1.10 1192.50 1311.75
Labour skilled md 1.50 550.00 825.00
unskilled md 5.00 250.00 1250.00
Cost per m3 4840.58
564 Cement Plaster 1:4, 20 mm thick
Material Cement bag 0.16 500.00 80.00
Sand m3 0.02 1497.50 29.95
Labour skilled md 0.22 550.00 121.00
unskilled md 0.22 250.00 55.00
Cost per m2 285.95
570 Erection and Finishing Works
571 Hoisting of Cables per m (Incl un/coiling)
Cable Ø 13 mm
Labour skilled md 0.01 550.00 5.50
unskilled md 0.08 250.00 20.00
Subtotal 25.50
Cable Ø 26 mm
Labour skilled md 0.04 550.00 22.00
unskilled md 0.32 250.00 80.00
Subtotal 102.00
Cable Ø 32 mm
Labour skilled md 0.06 550.00 33.00
unskilled md 0.48 250.00 120.00
Subtotal 153.00
Cable Ø 36 mm
Labour skilled md 0.08 550.00 44.00
unskilled md 0.61 250.00 152.50
Subtotal 196.50
Cable Ø 40 mm
Labour skilled md 0.10 550.00 55.00
unskilled md 0.75 250.00 187.50
Subtotal 242.50
Total (refer to the corresponding number and diameter of wire ropes) 719.50
Cost per m 719.50
572 Hoisting of Windties and Stabilizing Cables
Labour skilled md 0.27 550.00 148.50
unskilled md 0.67 250.00 167.50
Cost per pc 316.00
573 Erection of the Walkway
For Suspended Bridge
Labour skilled md 1.53 550.00 841.50
unskilled md 3.22 250.00 806.25
Cost per m 1647.75
574 Coaltar Application
For Suspended Bridge
Material Coaltar ltr 0.56 2.00 1.12
Kerosene ltr 0.19 1.00 0.19
Labour skilled md 0.03 550.00 16.50
unskilled md 0.06 250.00 15.00
Cost Estimate 14
Pedestrain Trail Bridge Burundi
Unit
Description Unit Rate Unit Cost
Quantity
Cost per m 32.81
Cost Estimate 15
TTRAIL BRIDGE IN ETHIOPIA
ETHIOPIA
SPECIAL TRAIL BRIDGE PROJECT
4. Transportation
Description Unit Quantity Rate Cost
Addis Ababa to Wire Ropes, Bulldog Grips, Steel
kg 59330.94
Road Head Parts, Cement & Other Materials
Total Transportation
LIST OF DESIGN & DRAWING
A. List Of Deque Design
S. No. Description Qty Remarks
1 Main & Handrail Cable Structures for Suspended Bridge 1
2 1 Left Bank on Rock
Drum Type Main Anchorage Foundation
3 1 Right Bank on Rock
4 1 Up Stream
Design of Windguy Cable Structure
5 1 Down Stream
6 1 Up Stream
Left Bank
7 Windguy Anchorage Foundation 1 Down Stream
8 (Extended Anchorage) 1 Up Stream
Right Bank
9 1 Down Stream
10 1 Up Stream
Design of Windguy Cable Structure (Windties Details)
11 1 Down Stream
Total Sheet 11
B. List Of Drawing
Sheet Page
S. No. Drawing No Description Qty Remarks
No. No.
1 1GA GA 1-1 1
2 1-2 1 1
02 Walk Way
3 2-2 2 1
4 1-2 11 1
06 Steel Deck
5 2-2 12 1
Common
6 1-2 18 1
11 Windtie
7 2-2 19 1
8 1-3 63 1
9 42 Windgay Cable Anchorage Extended length 2-3 64 1
10 3-3 65 1
11 1-4 96 1
12 2-4 97 1
61 Main Cable Anchorage Left Bank
13 3-4 98 1
14 4-4 99 1
15 1-4 96 1
16 2-4 97 1
61 Main Cable Anchorage Right Bank
17 3-4 98 1
18 4-4 99 1
19 1-2 107 1
63(32) Handrail Cable & Fixation Cable Anchorage
20 2-2 108 1
21 2-2 291 1 L/B DS
22 2-2 291 1 L/B US
42/1 Windguy Cable Foundation
23 2-2 291 1 R/B DS
24 2-2 291 1 R/B US
25 1-3 327 1
26 61/1(32) Main Foundation 2-3 328 1 Left Bank
27 3-3 329 1
28 1-3 327 1
29 61/1(32) Main Foundation 2-3 328 1 Right Bank
30 3-3 329 1
Total Drawing Sheet 30
TTRAIL BRIDGE IN ETHIOPIA
ETHIOPIA
SPECIAL TRAIL BRIDGE PROJECT
COST ESTIMATE : INFORMATION, DATA & QUANTITY INPUT SHEET
Bridge Information Sheet
m 3
m 3
m 3
m 2
m 3
m3 m3 m3 m3
Main Block Foundation PC 1:
Left Bank 12.12 62.16 8.87 20.52 0.81 95.62
Right Bank 12.12 62.16 8.87 20.52 0.81 95.62
Windguy Cable Anchorage TV
US - Left Bank 3.42 0.00 5.13 0.100 8.64
D
US - Right Bank 3.42 0.00 5.13 0.100 8.64 W
o
DS - Left Bank 3.42 0.00 5.13 0.100 8.64 iw
DS - Right Bank 3.42 0.00 5.13 0.100 8.64 n
d
Ramp-LB g
S
Ramp-RB Right
u
t
Others - LB y
r
Others - RB e
PC 1:3:6
TOTAL 0.00 24.24 138.00 17.74 0.00 20.52 41.04 2.02 B
a
UPlm
POS CE 551 552 553 554 561 562 563 564 Right
o
c
k
Official Rates
Rate
Description Unit Remarks
BIRR
Wire Ropes Ø 13 mm m 48.00
Ø 26 mm m 0.00
Ø 32 mm m 268.80
Ø 36 mm m 0.00
Ø 40 mm m 0.00
Bulldog Grips Ø 13 mm pc 46.80
Ø 26 mm pc 0.00
Ø 32 mm pc 238.80
Ø 36 mm pc 0.00
Ø 40 mm pc 0.00
Blasting Materials Gelatine kg
Detonator pc
Fuse Wire m
Supply of Steelparts Structural Steel kg 80.00
Reinforcement Steel kg 54.00
Thimbles Ø 13 mm pc 60.00
Ø 26 mm pc 0.00
Ø 32 mm pc 240.00
Ø 36 mm pc 0.00
Ø 40 mm pc 0.00
Miscellaneous Supply Gabion Wire 7,10,12 SWG kg 45.19
Sign Board pc 0.00
Bolts, Nuts & Washers: Grade 4.6 kg 250.00
Rust Prevention Zink kg 122.49
Hot Dip Galvanization Hydrochloric Acid ltr 38.65
Chemical for pre-fluxing kg 7.73
Fuel ltr 31.22
Paint Primer and finishing Enamel m2 63.00
Tools & Equipment Tools & Equipment set 10000.00
Labour Rates Workshop Skilled md 550.00
for Fabrication Unskilled md 250.00
Site Skilled md 550.00
for Construction Unskilled md 250.00
Porter md 250.00
Transportation Truck Metalled Road (….........to …............. txkm 5.00
Truck Non-Metalled Road (…........to.......... txkm 10.00
Construction Cement bag 500.00
Binding Wire kg 44.60
Nail for Site store & Form work kg 44.60
Seiving wire mesh (1.5m) (3mm2) pc 300.00
Project Information Hoarding Board pc
Local Wood m3
Site Management Local Human Interpreter cum Social Mobilizer month
Resource Watch Person/Office Assisstant month
Site Store & Temporary Shed at Bridge Site no
Vehicle/Fuel Store Rent at Bridge Site month
Vehicle Rent with Driver & Maintenance month
Fuel for Vehicle month
Erection and Finishing Works Coaltar ltr 2.00
Kerosene ltr 1.00
Additional Haulage, m Sand md 2.50
Rubble md 4.00
Gravell md 0.00