Professional Documents
Culture Documents
instrument cable
with depth 0.2 meter
instrument cable
with depth 0.2 m
should be isolated FH-2 Line
after isolated
lowering sleeve pipe FH-1 Line
inside the trench to
Perform HDD FH-3 Line
the length is:
for trench 17 m
for sleeve pipe 16 m
end trench
(8m+9m from both sides cable) DB