You are on page 1of 1

MAAP NOTES:

1. BUSWAY PLUG-IN CIRCUIT BREAKER (PICB) SHALL BE SAME BRAND AS EXISTING. PLEASE SPECIFY BRAND. SPECIFY IF PICB ENCLOSURE IS NEW OR
EXISTING. COORDINATE PICB REPLACEMENT WITH BUSWAY SUPPLIER. DRAWING SHALL BE DONE BY BUSWAY SUPPLIER AS COMMENTED.
2. PLUG-IN UNIT ENCLOSURE SHALL HAVE POSITIVE GROUND CONNECTION TO THE BUSWAY. PLUG-UNIT SHALL BE MECHANICALLY INTERLOCKED TO
PREVENT REMOVAL WHILE THE SWITCH IS "ON" POSITION AND SHALL BE EQUIPPED WITH AN INTERLOCK TO PREVENT THE COVER FROM BEING
OPENED WHILE THE SWITCH IS "ON" POSITION AND TO PREVENT ACCIDENTAL "CLOSING" OF THE SWITCH WHILE THE COVER IS OPEN.
3. PROVIDE MOUNTING ELEVATION DETAIL. INDICATE MOUNTING HEIGHT OF PICB.
4. ALL ELECTRICAL WORKS HEREIN SHALL CONFORM TO BUILDING STANDARD AND TENANT FIT-OUT GUIDELINES. SEE OTHER NOTES AT PREVIOUS
COMMENTED AND APPROVED FIT-OUT ELECTRICAL PLANS. 04042023

204
200 200
106

25 16
200

16

24
24
25
106

30
136
30

25
25

32
32
8
15
30

460

460
8
16 5 17 30
16 5 17
17 17
17 17
17 17
17 17

200

SD PLAN VIEW SD REAR ELEVATION SD SIDE ELEVATION


1 2 3

SHOP DRAWING PROPOSED BUSBAR PINS & ENCLOSURE SD-x

You might also like