6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 1 of 37
CONTRACT No. 4600009769
REVISION LIST
Revision Status Revision Status Revision Status
Page Page Page
0 1 2 3 4 5 6 0 1 2 3 4 5 6 0 1 2 3 4 5 6
0 X 42 84
1 X 43 85
2 X 44 86
3 X X 45 87
4 X X 46 88
5 X X 47 89
6 X X 48 90
7 X X 49 91
8 X X 50 92
9 X X 51 93
10 X X 52 94
11 X X 53 95
12 X X 54 96
13 55 97
14 56 98
15 57 99
16 58 100
17 59 101
18 60 102
19 61 103
20 62 104
21 63 105
22 64 106
23 65 107
24 66 108
25 67 109
26 68 110
27 69 111
28 70 112
29 71 113
30 72 114
31 73 115
32 74 116
33 75 117
34 76 118
35 77 119
36 78 120
37 79 121
38 80 122
39 81 123
40 82 124
41 83 125
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 2 of 37
CONTRACT No. 4600009769
CONTENTS
1. PURPOSE ............................................................................................ 3
2. SCOPE ................................................................................................. 3
3. NOTE AND ABBREVIATIONS................................................................. 3
4. REFERENCES ........................................................................................ 4
5. SAFETY ................................................................................................ 4
5.1. GENERAL ........................................................................................ 4
5.2. RISK ASSESSMENT ............................................................................. 4
5.3. EMERGENCY EVACUATION PROCEDURE.................................................... 5
5.4. WORK PERMITS ................................................................................ 5
6. RESOURCES ......................................................................................... 5
6.1. LIST OF PERSONNEL, EQUIPMENT AND MARINE SPREAD MOBILIZED ................ 5
6.2. MARINE SPREAD ............................................................................... 6
6.3. EQUIPMENT / TOOLS ......................................................................... 6
7. BATHYMETRIC AND TOPO SURVEY SEQUENCE ..................................... 6
7.1. STAGE PREPARATION.......................................................................... 7
7.2. STAGE DATA COLLECTION ................................................................... 12
7.3. STAGE DATA PROCESSING ................................................................... 15
7.4. STAGE FINAL REPORT ........................................................................ 15
8. ATTACHMENT .................................................................................... 16
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 3 of 37
CONTRACT No. 4600009769
1. PURPOSE
The survey service was required to determine the topography of the river around the work
1
site. These maps are used to determine the condition and around existing pipeline
between protection pile the river at the location of jobs. The survey was conducted by
means of echo sounder equipped with RTK-DGPS positioning system.
2. SCOPE
The scope of work of this procedure is covering the bathymetric and topo survey to obtain
topo and seabed profile in working area.
This location need to be surveyed to have details of water depth information and river
contour depth. The work shall be carried out utilizing echo sounder, RTK DGPS
positioning system and Total Station.
The objectives of this survey are as follows:
To identify and to mapping river contour depth around pipeline and existing protection
pile area
To map river contour depth at the survey area in a scale of 1:1000 at the survey area
of 100m x100m before the installation sheet pile and protection pile.
4. REFERENCES
5. SAFETY
As a principal in the survey activity, CONTRACTOR will be conducting a safety induction
for all personal coming on board for this activity. The CONTRACTOR’s HSE Coordinator
and his representative will perform briefing to everyone involved to introduce the important
of safe practices and create the awareness that they are indeed working within an existing
live pipeline at their working area.
5.1. General
To minimize the risk of accidents during the work, safety precautions and risk
assessment has been prepared as guidelines for all personal involved. Safety
inductions shall be organized upon mobilization of all personnel on site. The Risk
Assessment shall be clearly explained and existing facilities.
5.2. Risk Assessment
A specific risk assessment is refer to Job Risk Assessment to this procedure and will
discussed, reviewed and approved by Company as necessary to request the permit to
work.
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 5 of 37
CONTRACT No. 4600009769
6. RESOURCES
6.1. List of Personnel, Equipment and Marine Spread Mobilized
TITLE QUANTITY
Party Chief Survey 1
Supervisor 1
PC / Hydrographic Surveyor 1
Survey Engineer 1
Data Processor 1
Tide Gauge Observer / GPS Ref Sta. 1
Helpers (Local Laborer) 1
Safetyman 1
Medic 1
Sea Truck crew 2
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 6 of 37
CONTRACT No. 4600009769
PC n/a 1
SAILCOMP KVH
fluxgate
Heading Azimuth1000 1
compass
7.1. Preparation
a. Work Map / Map Distribution Benchmark ( BM )
Benchmark will be used are BM RC-52 and BM LT-02 (see attachment 8.1)
Incase of BM is not avaible any more contractor will establish new BM generate
from BM LT-02.
b. Data Preparation
Survey Line
The area to be surveyed is within a grid area of 100m x 100m location of the
sheet pile and protection pile area that installed. The Bathymetric survey and will
be carried out along the following designed survey lines. The main lines will be
run across the river and along around pipeline area with an interval of 2m and
the cross lines will be run perpendicular to the main line with an interval of 15m.
Navigation & echo sounder data will be logged continuously and fixes will be run
every 5m. The bathymetric survey will be run in one pass.
Topographic survey line will be run overlap 10m with bathymetric survey and
ensured all working area for sheet pile has inside survey area.
BATHYMETRY SURVEY PROCEDURE
6769-22-TNF-PWK-3-006-P
REV.1 REPAIR OF EXPOSED 30" PIPELINE AT RCB-
PAGE
TNF 565 & 563
Status : A 8 of 37
CONTRACT No. 4600009769
List line bathymetry and topo survey at TNF 565 & 563.
1 No of Total
No Description Direction Length Interval
Line Length
2 Along the
Cross Lines 100m 15m 6 600m
river
Main Lines Across the
3 20m 2m 50 1000m
Topo river
Topo line
overlap with line
bathymetric
100mtr length
No of Total
No Description Direction Length Interval
Line Length
2 Along the
Cross Lines 150m 15m 7 1050m
river
Main Lines Across the
3 30m 2m 50 3000m
Topo river
Topo line
overlap line
bathymetric
150mtr length