OP.12.

18 WORK PERMIT Rev: 01

Rev Date 14/04/2021


OP.12.18-F-04
EMERGENCY RESCUE PLAN
Page Number Page 1 of 1

Equipment No.: 1900-TK-041AB & Unit: Date:


08, 05, 06AB LAB-4 (NEW CONSTRUCTION) 11-12-2023

Department/Unit/Equipment: Attachment: Contractor:

CONSTRUCTION Drawing Other. RMCO/WISON

Special Rescue Plan Required Personal Monitor

Yes No Yes No
MINIMUM REQUIRED PERSONAL PROTECTIVE EQUIPMENT: TOOLS & EQUIPMENT NEEDED:
FALL DOUBLE HEARING PPE CLOTHING 1. Pulley
PROTECTION PROTECTION (ABOVE NORMAL) 2. Nylon rope
3. Harness without lanyard
Full Body Rescue Helmet SPECIAL GLOVES
Harness
GOGGLES AIR PURIFYING Safety Glasses
RESPIRATOR
FACE SHIELD SCBA HELMET AND SFAETY
SHOES
OTHER (LIST)
POTENTIAL LOSS/HAZARD
KEY CRITICAL JOB STEPS STEPS TO PREVENT/MANAGE RISK
Worst Case Scenario
By on site workers

1. Carpentry and Rebar work  Electrocution  Only Approved type of power tools
2. Concrete Pouring  Formwork failure shall be used with valid contractor
3. Compaction( using roller  Crushing inspection sticker and protected
compactor) by ELCB or GFCI
 Prior to pour the concrete
formwork shall be inspected and
approved by QC. And shall be
inspected by Site HSE.
 Equipment shall be operated by
trained person.
 All rotating part shall be guarded
 Workforce shall be rotate to avoid
fatigue.

FP Rescue Team Plan

Rev.: 01 OC.03.04. F-03


23/08/2020
OP.12.18 WORK PERMIT Rev: 01

Rev Date 14/04/2021


OP.12.18-F-04
EMERGENCY RESCUE PLAN
Page Number Page 1 of 1

High Angle Rescue Operation (Black & tackle). *Comments:


Arial Ladder rescue operation.
Other. Pulley fixed with temporary scaffolding stricture.

No. Requirement Details of arrangements


Entry & Exit Through temporary fixed ladder provided with temporary
1
Confined space Platform Controlled by a trained Hole watcher maintaining Entry, Exit Log
Sheet.

2 Means of access (manhole open I Enter into Open Ring type foundation ( 10 meters dia) through ladder
channel head open I pit cover open)
3 Open Tank foundation
Lighting requirement

4 N/A
Internal obstructions

6  Harness without lanyards


 Rescue stretcher
Rescue equipment’s available
 Pulley

7
N/A
Availability of Life line or SCBA

8 Air Horn and Mobile Phones


Communication tools

10 Maximum number of men inside 10


confined space
Air horn or any other type
11 Air Horn
emergency horn with standby
person.
Mechanical device on-site for
12 immediate use to retrieve personnel Rope and Pulley
from vertical type confined spaces
more than 2 meters deep.
14 Who takes charge in emergency RMCO ERT

Rev.: 01 OC.03.04. F-03


23/08/2020
OP.12.18 WORK PERMIT Rev: 01

Rev Date 14/04/2021


OP.12.18-F-04
EMERGENCY RESCUE PLAN
Page Number Page 1 of 1

15 How is emergency alarm raised Using Air Horn and Mobile Phone
16 Define escape route or attach Attached
escape plan

Person Name Auth. No. Signature Date Time

Fire Chief Wasi Asghar 055-8440127

Mohamamd Azam 055-3345348


Rescue Man Noor Muhammad 058-1949657
Mohammad Shamim 053-5718912
Aziz Ur Rehman 050-9529805

Permit Receiver Bakhaml Khan 059-7520793

Permit Issuer Saleem Sheikh 057-2293426

HSEO Gulzar Ahmed 059-0048923

Note: Preparation should be done by all team members.

Rev.: 01 OC.03.04. F-03


23/08/2020
OP.12.18 WORK PERMIT Rev: 01

Rev Date 14/04/2021


OP.12.18-F-04
EMERGENCY RESCUE PLAN
Page Number Page 1 of 1

MOSQUE
ASSEMBLY POINT

TOILET

TANK-05A

TANK-41A TANK-41B

TANK-05B
RMCO SITE REST
SHELTER

Rev.: 01 OC.03.04. F-03


23/08/2020
OP.12.18 WORK PERMIT Rev: 01

Rev Date 14/04/2021


OP.12.18-F-04
EMERGENCY RESCUE PLAN
Page Number Page 1 of 1

EMERGENCY REPORTING PROTOCOL

Rev.: 01 OC.03.04. F-03


23/08/2020
EMERGENCY REPORTING PROTOCOL
PLANT LOCATION CLIENT: JOB UNIT
RABIGHSAUDI ARABIA WISON CIVIL WORK LAB-4 & LAB-3

PROJECT / Document No. RMCO-MOD-OC-001


FARABI/WISON LAB-4 PROJECT
Document Date 24 DECEMBER 2022
Document Name CLOSE-OUT REPORT
CONTRACTOR CONTRACT NO.
RABIGH MODERN COMPANY LTD. Revision No. 00

CONFINED SPACE RESCUE DRILL


OBSERVATION CLOSE-OUT REPORT

Rev. Revision Date Revision Information Prepared Checked Approved


Abdul Qadeer Mohammad Shahid@ Muzafar Ali
00 24 Dec 2022 Issued for Close-out
(HSE-Supervisor) (Const. Dept. Mgr.) (Project Manager)
S.No COMPANY COMMENTS ACTION BY ACTION/RECOMMENDATION STATUS

1. Contractor (Wison) did not


fallow the Emergency WISON N/A Completed
Reporting protocol (did not
reported to FYPC HESS Lead
after Receiving Call from
subcontractor HSEM.
Color coded their helmet
RMCO and Provided Them Green
01 FARABI 2. Identification mark/vest was
not Provided to the ERT team. Vest Labeled with ERT Completed

RMCO Mr. Tabriz HSEO will be Act


3. Flag man was not available at as Flagman in case of Any Completed
the entry point to assess the emergency
ambulance.

1. No one moved with the victim


RMCO Advised the ERT member to C
inside the ambulance from ERT
02 Wison be at least one person stay
team ompleted
with the victim till clinic.

Positive Comments

1. All Operator switched of their equipment and proceed to assembly point


2. Alarm was audible
03 Farabi
3. Everyone Responded to alarm immediately
4. Medical Team Arrived at site on planned time
Tool Box Talk

Medical & First Aid Provision

Head count

Close-out Meeting