You are on page 1of 1
FARABI oe FARABI YANBU PETROCHEMICAL MAJOR PROJECTS / LABHS SE NOTIFICATION OF RADIOGRAPHY 1 ALL CONTRACTORS pare: foalro24 EASE BE ADVISED Ral 1V WIL BE TAKH EON THE PROJECT Day ees Snde DATE, 2 2: TIME Fro._Cio0 Pm oo PM LocaTion 2 Pipia CONTRACTORSUBCONTRACTOR NEED TO ENSURE THAT ALL THEIR EMPLOYEES ARE MADE AWARE OF THIS ACTIVITY AND INSTRUCT THEM TO KEEP AWAY FROME ‘THE “RADIATION AREA”. REFER TO THE AREA PLOT PLAN. SHOULD THIS ACTIVITY INTERFERE WITH CONTRACTORSUBCONTRACTOR PRESENT SCHEDULE PLEASE CONTACT THE SUBCONTRACTOR RESPONSIBLE PERSON AS SOON [AS POSSIBLE TO ALLOW ALTERNATE ARRANGEMENTS TO BE MADE? IF THERE IS NO REPONSE FROM THIS MEMO THE RADIOGRAPHY WILL TAKE PRIORITY AND ANY OTHER ACTIVITY IN THE AREA WILL STOP UNTIL THE RADIOGRAPHY HAS BEEN COMPLETED. i CO-OPERATION AND CO-ORDINATION OF TILIS MEMO IS EXPECTED. pi % CONTRACTOR SITE MANAGER/CONSTRUCTION MANAG

You might also like