FARABI YANBU PETROCHEMICAL MAJOR PROJECTS /
LABHS
SE
NOTIFICATION OF RADIOGRAPHY
1 ALL CONTRACTORS
pare: foalro24
EASE BE ADVISED Ral 1V WIL BE TAKH EON THE PROJECT
Day ees Snde
DATE, 2 2:
TIME Fro._Cio0 Pm oo PM
LocaTion 2 Pipia
CONTRACTORSUBCONTRACTOR NEED TO ENSURE THAT ALL THEIR EMPLOYEES
ARE MADE AWARE OF THIS ACTIVITY AND INSTRUCT THEM TO KEEP AWAY FROME
‘THE “RADIATION AREA”. REFER TO THE AREA PLOT PLAN.
SHOULD THIS ACTIVITY INTERFERE WITH CONTRACTORSUBCONTRACTOR PRESENT
SCHEDULE PLEASE CONTACT THE SUBCONTRACTOR RESPONSIBLE PERSON AS SOON
[AS POSSIBLE TO ALLOW ALTERNATE ARRANGEMENTS TO BE MADE?
IF THERE IS NO REPONSE FROM THIS MEMO THE RADIOGRAPHY WILL TAKE
PRIORITY AND ANY OTHER ACTIVITY IN THE AREA WILL STOP UNTIL THE
RADIOGRAPHY HAS BEEN COMPLETED.
i
CO-OPERATION AND CO-ORDINATION OF TILIS MEMO IS EXPECTED.
pi %
CONTRACTOR SITE MANAGER/CONSTRUCTION MANAG