Inadequate hard barricade around the excavation


1 II L RMCO SLEEPER AREA RMCO Barricades at the Deep Feb-17-2024 18-02-2024
required to complete the hard barricade around Excavation
Inadequate edge protection observed in multiple ETC
2 XI L RMCO SLEEPER AREA On-going Feb-17-2024
excavation required shoring 21-02-2024
Ladder access landing platform not provided and the RMCO Provided Step access
3 XII L RMCO SLEEPER AREA Feb-17-2024 19-02-2024
access seen obstructed by the scaffold tube from the and Provide Board to the Ladder
An HDPE utility line observed hanged with plastic rope
4 X M RMCO SLEEPER AREA Provided Scaffolding To Feb-17-2024 19-02-2024
instead of solid support support the existing HDPE line
Inadequate signage has been observed around
5 IV L RMCO SLEEPER AREA RMCO Replaced the Feb-17-2024 19-02-2024
excavation and laydown area sub-standard signages
A temporary shelter has been in use for Mess hall, rest ETC
6 XXII L RMCO LAYDOWN On-going Feb-17-2024
shelter and Prayer hall, which should be separated 25-02-2024
Damaged green mesh shall be replaced around from
7 XXII L RMCO REST SHELTER Belong to WL (Removed By WL) Feb-17-2024 18-02-2024
the shelter
An excavation with shoring provided not suitable for RMCO Provided Scaffolding to
8 XI M RMCO UTILITY AREA protect the Soil Erosion Feb-17-2024 18-02-2024
withstanding the soil erosion
9 Laydown area shall be protected with hard barrier II L RMCO UTILITY AREA Provided soft barricades till scaffolder get their ajeer Feb-17-2024 25-02-2024
10 Waste skip not available to dispose the site waste XVI L RMCO UTILITY AREA On-going Feb-17-2024 ETC 21-02-2024

Multiple excavation beside the road has been observed RMCO Provided Additional
11 XIX L RMCO SLEEPER AREA Feb-17-2024 18-02-2024
with no blinking lights Blainking Lights on the road side
Rebar caps not provided for the extended protruding
12 XI L RMCO SLEEPER AREA RMCO Provided Rebar Caps Feb-17-2024 18-02-2024
rebars
Improper materials arrangement observed in multiple FIRE STATION
13 XXI L RMCO WISON Feb-17-2024
areas which shall be stored properly. AREA