A 25-03-2024
F Weekly Coordination
E Meeting
T SAFETY ENGINEERING
DEPARTMENT
BHILAI STEEL PLANT
Y
COMPLIANCE/
NON-COMPLIANCE
PHOTOGRAPH
2
OHP
3
UNSAFE CONDITION
BEFORE AFTER
DATE 12.03.2024
DEPT OHP-B
LOCATION Bucket wheel reclaimer
6A
BRIEF Nomenclature was found
missing at the operator
cabin panel
REPORTED SED
BY
4
UNSAFE CONDITION
BEFORE DATE 22.03.2024 AFTER
DEPT OHP
LOCATION RM 05 belt
BRIEF Non usages of full
bodyharness at +3m.level in
GC1, counter wt in OHP by Shri
Bhagirath Vishwakarma of
Rosy group in spite of warning
given in last week in RM 05
belt.
(REPEAT VIOLATION)
ACTION
TAKEN
REPORTED SED
BY
5
UNSAFE CONDITION
BEFORE DATE 20.03.2024 AFTER
DEPT OHP-A
LOCATION STACKER-4
BRIEF 1.) Temporary metal sheets
were placed which were being
used as a working platform. It
may not bear the man /
material load and may be
sagged which will lead to the
fall of person & material.
2.) Multiple openings and
loose materials were
observed.
REPORTED SED
BY
6
UNSAFE CONDITION
BEFORE DATE 20.03.2024 AFTER
DEPT OHP-A
LOCATION STACKER-4
BRIEF Hard barricading /Railing was
found missing around the
working platform.
REPORTED SED
BY
7
UNSAFE CONDITION
BEFORE DATE 20.03.2024 AFTER
DEPT OHP-A
LOCATION STACKER-4
BRIEF Existing hand railings are not
adequate and have sharp
edges. May lead to
hand/finger cut injuries.
REPORTED SED
BY
8
UNSAFE CONDITION
BEFORE DATE 20.03.2024 AFTER
DEPT OHP-A
LOCATION STACKER-4
BRIEF Opening was observed
between the staircase step and
platform. Loose material may
fall through it and the worker's
foot may be stuck.
REPORTED SED
BY
9
UNSAFE CONDITION
BEFORE DATE 20.03.2024 AFTER
DEPT OHP-A
LOCATION STACKER-4
BRIEF Rain water was accumulated
below the welding machines.
REPORTED SED
BY
10
UNSAFE CONDITION
BEFORE DATE 20.03.2024 AFTER
DEPT OHP-A
LOCATION STACKER-4
BRIEF Welding lug was found in
damaged condition.
REPORTED SED
BY
11
UNSAFE CONDITION
BEFORE DATE 20.03.2024 AFTER
DEPT OHP-A
LOCATION STACKER-4
BRIEF Two holder connection was
taken from the welding cable
of the single welding machine.
REPORTED SED
BY
12
SP-2
13
ACCEPTABLE UNSAFE PRACTICE
BEFORE DATE 18.03.2024 AFTER
DEPT SP2
LOCATION Coke crusher area
BRIEF Mr. Bavani Singh and Mr.
Komal Chand from M/s. CB
Patel found doing turning
operation on coke crusher 5 in
running condition such that
they are coming in close
proximity with the running
belt drive
REPORTED SED
BY
14
UNSAFE ACT
BEFORE DATE 18.03.2024 AFTER
DEPT SP2
LOCATION De dusting ESP-1
BRIEF In the work permit of De dusting ESP-1 cleaning & maintenance work, the
following observations were found:
In General Work Permit
- Name of the authorized isolator was not mentioned in isolation details
- Name and signature of initiator is absent in pre-permit checks
- Pre execution checklist was not filled by executing agency
In Work at Height Permit
- Type of fall protection system was not indicated in WAH permit
- Checklist of fall protection system is not filled- Method of access to
work position is not indicated
- Availability of HIRA & JSA not indicated
- Name and signature of permit authorizing person is absent
In Confined Space Permit
- Whether all contractors has taken safety training from SED is not
indicated
- CO level is not mentioned
- Confined space checklist was not filled
ACTION TAKEN Spot correction done & educated the persons regarding filling the permit
REPORTED BY SED
15
UNSAFE CONDITION
BEFORE DATE 18.03.2024 AFTER
DEPT SP2
LOCATION NC-5 Conveyor gallery, Raw
material area
BRIEF Absence of guarding to the
secondary coupling of NC-5
conveyor drive end
REPORTED SED
BY
16
UNSAFE CONDITION
BEFORE DATE 18.03.2024 AFTER
DEPT SP2
LOCATION FF-2 Conveyor gallery, Raw
material area
BRIEF Absence of guarding to the
tail pulley of FF-2 conveyor
REPORTED SED
BY
17
UNSAFE CONDITION
BEFORE DATE 18.03.2024 AFTER
DEPT SP2
LOCATION FF-2 Conveyor gallery, Raw
material area
BRIEF Absence of guarding to the
head pulley of FF-2 conveyor
REPORTED SED
BY
18
COCCD
19
UNSAFE CONDITION
BEFORE AFTER
DATE 19.03.2024
DEPT CO&CCD
LOCATION Y 9 94 D/E CPP2
BRIEF Rotating parts (Coupling from
motor to reducer) guarding is
not available at Y 9 94 D/E CPP2
REPORTED SED
BY
20
UNSAFE ACT
BEFORE AFTER
DATE 19.03.2024
DEPT CO&CCD
LOCATION CCD 3 M/M Assembly section
BRIEF For gas cutting set flash back
arrestor is missing in torch end.
REPORTED SED
BY
21
UNSAFE CONDITION
BEFORE AFTER
DATE 19.03.2024
DEPT CO&CCD
LOCATION CCC 3 B & CCC 3A PBCC plant
BRIEF Guarding is missing for T/E of
conveyor belt. CCC 3 B & CCC 3A
PBCC plant
REPORTED SED
BY
22
UNSAFE CONDITION
BEFORE AFTER
DATE 19.03.2024
DEPT CO&CCD
LOCATION CCD 3 mechanical assembly
section.
BRIEF Distance between tool rest &
grinding stone is more than 1/8
inch at CCD 3 mechanical
assembly section.
ACTION Intimated to respective
TAKEN stakeholders .
REPORTED SED
BY
23
UNSAFE CONDITION
BEFORE AFTER
DATE 19.03.2024
DEPT CO&CCD
LOCATION End bench 19 COB 9
BRIEF For gas cutting activity flash
back arrestor was not available
for LPG gas cylinder. Pug cutting
M/C torch end flash back
arrestor & jubilee clamp is
missing. Gas cylinder is laid
down in haphazard manner.
Agency: Universal erectors
24
UNSAFE CONDITION
BEFORE AFTER
DATE 19.03.2024
DEPT CO&CCD
LOCATION End bench 19 COB 9
BRIEF For welding machine cable
joints lug is missing.
(Mechanical maintenance)
Agency: Universal erectors
ACTION Intimated to respective
TAKEN stakeholders .
REPORTED SED
BY
25
UNSAFE ACT
BEFORE AFTER
DATE 21.03.2024
DEPT CO&CCD
LOCATION COB 11
BRIEF Multiple gas cylinder lifting is
being commenced using chain
sling which is highly unsafe &
ample of chances of slip/fail of
sling is there. (UA) Appropriate
cylinder cage / cradle shall be
used for safe material handling.
Agency: Rosy Enterprises
ACTION Intimated to respective
TAKEN stakeholders .
REPORTED SED
BY
26
UNSAFE CONDITION
BEFORE AFTER
DATE 21.03.2024
DEPT CO&CCD
LOCATION N1 end bench (COB 11 CRG M)
BRIEF Distance between tool rest &
grinding stone is more than 1/8
inch at N1 end bench (COB 11
CRG M)
ACTION Intimated to respective
TAKEN stakeholders .
REPORTED SED
BY
27
UNSAFE ACT
BEFORE AFTER
DATE 21.03.2024
DEPT CO&CCD
LOCATION Back end of CHP 1
BRIEF Workman deployed for gas
cutting activity has not worn full
body at height of 5 meters for
fabrication of shed.
(Agency: Rosy enterprises)
ACTION Intimated to respective
TAKEN stakeholders & Fine imposed.
REPORTED SED
BY
28
UNSAFE CONDITION
BEFORE AFTER
DATE 21.03.2024
DEPT CO&CCD
LOCATION Back end of CHP 1
29
UNSAFE CONDITION
BEFORE AFTER
DATE 21.03.2024
DEPT CO&CCD
LOCATION Back end of CHP 1
30
UNSAFE CONDITION
BEFORE AFTER
DATE 21.03.2024
DEPT CO&CCD
LOCATION Back end of CHP 1
31
UNSAFE CONDITION
BEFORE AFTER
DATE 21.03.2024
DEPT CO&CCD
LOCATION coke pusher (COB 11)
BRIEF Workman (Suresh Ku verma _
Agency- Rosy enterprises)
deployed for cleaning of coke
pusher at height 2.5 m (COB 11)
has not worn full body harness.
REPORTED SED
BY
32
SMS 2
UNSAFE CONDITION
BEFORE AFTER
DATE 19.03.2024
DEPT SMS-2
LOCATION Tundish Repair area
BRIEF Welder working at edge
without any protection or
safety harness.
REPORTED
BY
34
P MILL
35
SPOT CORRECTION – UNSAFE CONDITION
BEFORE DATE 20.03.2024
AFTER
DEPT Plate Mill
LOCATION Crane No. 26, Crane Mechanical
Section, Plate Mill.
BRIEF
Unsafe Condition –
No arrangement of fall protection
observed during Crane revamping
work at the level of EOT Crane
track. Point discussed with
Contractor supervisor Mr. Mohan of
M/s Aditya Fabricator also
counseling was being done at site.
REPORTED SED
BY
36
SPOT CORRECTION – UNSAFE CONDITION
BEFORE DATE 20.03.2024
AFTER
DEPT Plate Mill
LOCATION In front of Crane Mechanical
Section
BRIEF
Improper/loose electrical
connection was observed in
welding machine.
Good Observation -
Installed ELCBs were
observed in working
condition.
ACTION Rope has been installed as a fall
TAKEN protection.
Safety observation shared to Mr. FD
Dwivedi (Crane – Mech) & DSO
(Plate Mill).
REPORTED SED
BY
37
SPOT CORRECTION - UNSAFE ACT
DATE 18.03.2024
REPORTED SED
BY
38
DATE 18.03.2024
REPORTED BY SED
39
DATE 18.03.2024
UNSAFE CONDITION
BEFORE DEPT Plate Mill
AFTER
LOCATION Near Measuring Post, Area 01.
BRIEF
REPORTED SED
BY
40
UNSAFE CONDITION
DATE 18.03.2024
BEFORE AFTER
DEPT Plate Mill
BRIEF
Cable joint 02
ACTION Green Report
TAKEN Safety observation shared to DSO
(Plate Mill).
REPORTED SED
BY
Cable joint 01
41
UNSAFE CONDITION
DATE 16.03.2024
BEFORE AFTER
DEPT Plate Mill
LOCATION Reducer 08 & 09, Area 01.
BRIEF
REPORTED SED
BY
42
UNSAFE ACT
DATE 16.03.2024
BEFORE AFTER
DEPT Plate Mill
LOCATION Near CP 24, Area 02.
BRIEF
PRW worker of M/s Sahicon was
observed near CP 24 without
wearing safety helmet.
REPORTED SED
BY
43
UNSAFE CONDITION
BEFORE DATE 21.03.2024
AFTER
DEPT Plate Mill
LOCATION At entrance of Plate Mill, Area
01.
BRIEF
REPORTED SED
BY
44
UNSAFE CONDITION
BEFORE DATE 21.03.2024
AFTER
DEPT Plate Mill
LOCATION Behind the Canteen of Plate Mill
Area 01.
BRIEF
REPORTED SED
BY
45
UNSAFE CONDITION
BEFORE DATE 21.03.2024
AFTER
DEPT Plate Mill
LOCATION Behind the Canteen of Plate Mill
Area 01.
BRIEF
REPORTED SED
BY
46
UNSAFE CONDITION
BEFORE DATE 21.03.2024
AFTER
DEPT Plate Mill
LOCATION Behind the Canteen of Plate Mill
Area 01.
BRIEF
REPORTED SED
BY
47
UNSAFE CONDITION
BEFORE DATE 21.03.2024
AFTER
DEPT Plate Mill
LOCATION In Between CP 01 & 02, Area 01.
BRIEF
48
Thank 49