SECTION 1 OBSERVATION
: REPORT
IMPACTED : Quality
*Notes: Only one Category per PMAR - if two different categories, make a separate PMAR
Only one Unit per PMAR
SECTION 2 REPORT
: PREPARATION AND REVIEW STATUS
DEPARTMENT: Quality_QA_QC
PREPARED :
Name Irwan Nugraha Date: 01 October 2022
CHECKED 1 :
Aaron
Name Date: 01 October 2022
Tanhueco
CHECKED 2 :
SECTION 3 FOLLOW
: UP ACTION (FILL-UP BY CONTRACTOR)
RESPONDED :
Name : Date:
VERIFIED :
Name : Date:
SECTION 4 FOLLOW
: UP ACTION (FILL-UP BY IPMT)
VERIFIED
Name : Date:
SECTION 5 ATTACHMENT(S)
: WITH DESCRIPTION (I.E PHOTOS, ETC)
Project Monitoring Action Report
SECTION 1 OBSERVATION
: REPORT
IMPACTED : Quality
*Notes: Only one Category per PMAR - if two different categories, make a separate PMAR
Only one Unit per PMAR
SECTION 2 REPORT
: PREPARATION AND REVIEW STATUS
DEPARTMENT: Quality_QA_QC
PREPARED :
Name Irwan Nugraha Date: 01 October 2022
CHECKED 1 :
Aaron
Name Date: 01 October 2022
Tanhueco
CHECKED 2 :
SECTION 3 FOLLOW
: UP ACTION (FILL-UP BY CONTRACTOR)
RESPONDED :
Name : Date:
VERIFIED :
Name : Date:
SECTION 4 FOLLOW
: UP ACTION (FILL-UP BY IPMT)
VERIFIED
Name : Date:
SECTION 5 ATTACHMENT(S)
: WITH DESCRIPTION (I.E PHOTOS, ETC)
Project Monitoring Action Report
Attachment 1. PMAR-XXX3
Figure 1. Welding Matrix (Without welder ID. No. and WPS No.) for Weld Joint No. 4 refer to the
drawing Doc. No. 003AA53D-P-765-01-1 are tack welded using without applicable WPS No. and
Welder ID.
Project Monitoring Action Report
Figure 2. Welding Matrix (Without welder ID. No. and WPS No.) for Weld Joint No. 5 refer to the
drawing Doc. No. 059A02-P-205-01-2 are completed welded using without applicable WPS No.
and Welder ID.
Figure 3. Welding Matrix (Without welder ID. No. and WPS No.) for Weld Joint No. 2 & 3 refer to
the drawing Doc. No. 059A02-P-297-06-1 are completed welded using without applicable WPS
No. and Welder ID.
Project Monitoring Action Report
Figure 4. Not acceptable tack weld (Tack weld shall be allocate on bevel surface to be welded,
tack weld shall not be on the base metal surface).
Project Monitoring Action Report
Figure 5. Material handling is not in accordance with the materials handling procedure (all
materials shall not be placed directly on the ground)
Project Monitoring Action Report
Figure 6. Material handling is not in accordance with the materials handling procedure (all
materials shall not be placed directly on the ground)
Project Monitoring Action Report
Figure 7. Welder (Welder ID. No. 3542) was doing welding on weld joint No. 2 and 3 refer to
Drawing Doc. No. 003BA53C-VF-406-01-1 using WPS No. 008 but there are no available
approved and qualified WPS display near welding activity, even the welder are not aware of
WPS.
Project Monitoring Action Report
Stainless Steel
Materials (316L)
Direct contact to
Carbon Steel
(Support)
Stainless Steel
Materials (316L)
Direct contact to
Carbon Steel
(Support)
Project Monitoring Action Report
Stainless Steel
Materials (316L)
Direct contact to
Carbon Steel (Roller)
Stainless Steel
Materials (316L)
Direct contact to
Carbon Steel (Roller)
Project Monitoring Action Report
Stainless Steel
Materials (316L)
Direct contact to
Carbon Steel
(Support)
Project Monitoring Action Report
Stainless Steel
Materials (316L)
Direct contact to
Carbon Steel
(Support)
Figure 8. Exotic materials (CRA Alloy Materials) Stainless Steel Materials (316L) was directly
contact with Carbon steel materials, this is prohibited by the Project Specification , Procedure
and Code/Standard, contact directly with carbon steel susceptible to damage the corrosion
resistance property of materials and tend to occur failure during application and operation of
this materials. (Implementation of materials receiving, handling, storage procedure is very
poor).
Project Monitoring Action Report
Project Monitoring Action Report
Figure 9. There was observed defect (Scratched) on surface body of Stainless-Steel Pipe refer to
Drawing Doc. No. 059A03-F6-011-01-2, Those weld joint (No. 8 and 9) have been completed
welding, but the welding matrix was not mentioned applicable WPS and Welders ID No.
Project Monitoring Action Report
Figure 10. There was observed welding machines with obsolete Inspected and calibration
sticker/Expired calibration welding machines need to be recalibrated, blur stickers (not
readable) to be replaced with readable one and re-written to be readable,
Project Monitoring Action Report
Figure 11. Material handling is not in accordance with the materials handling procedure (all
materials shall not be placed directly on the ground)