LIFTING ACTIVITIES CHECKLIST

Specific Work
Date
Location
Materials to be
PTW No
lift.

Check
No Description Box Remarks
Yes No
1 PTW have obtained and displayed at site.

2 Joint site inspection has been conducted by PTW issuer and Receiver

3 All PTW supportive documents are available with the PTW

4 Daily Inspection checklist of the crane has maintained by Operator.

5 Lifting plan have been developed, completed and available at site.

6 Swing area/swing radius have barricaded

Signage have been posted at site (lifting in progress, unauthorized person not
7
allowed etc.)

8 Lifting activity is being monitor/assess by trained and certified Riggers.

9 Is there any other activity on-going within the radius of the crane?

All lifting tackles (shackles, Slings) are properly maintained and color coded by
10
PRC approved 3rd party.

11 The actual length of the boom and radius in the field are as per lifting plan?

12 Road closure has been completed and available at site.

13 Is the wind speed is not more than 32km/hr.

Inspected by PTW/Supervisor Verified by HSE


___________________ __________

RMCO-HSE-F-082