You are on page 1of 1
UPPERSTRUCTURE (CONT'D) Installation (Cont'd) Figure 50-10-11 ree | Install the three tapered head alignment bolts (item 1) [Figure 50-10-11] through the swing bearing and into the upperstructure. These bolts should be spaced at approximately 120°, This procedure will correctly align the upperstructure for correct swing motor gear to swing bearing ring gear clearance, Tighten these three tapered bolts to 60 ft-lbs. (81 Nm) torque, Remove the three alignment pins (Item 2) [Figure 50-10- 11] from the upperstructure. Figure 50-10-12 Apply thread lock adhesive (LOCKTITE #242) to the threads of the bolts. Install the bolts (Item 1) [Figure 50- 10-12] into all holes (except the three with the alignment bolts installed). 50-10-5 1053 01537 Tighten the bolts to 118-133 ft-lbs. (160-180 Nm) torque, Remove the three alignment bolts (item 2) [Figure 50- 10-12]. Install the three remaining bolts. Tighten the bolts to 118-133 ft-lbs. (160-180 Nm) torque. Figure 50-10-13 Install the hoses on the swivel joint [Figure 50-10-12] Remove the chains and lifting fixture. Install the swing motor drive carrier. (See Removal And Installation on Page 20-91-1) Check the backlash between the gears by moving the frame back and forth at several points throughout 360° of, frame rotation. There must be some backlash present. Install the swing motor. (See Removal And Installation on Page 20-90-11) Dealer Copy -- Not for Resale 435 Excavator Service Manual

You might also like