Professional Documents
Culture Documents
SUBMITTED BY:
2022-2023
Karnatak Law Society's
SHRI VASANTRAO POTDAR POLYTECHNIC
Tilakwadi, Belagavi-590006
Certificate
Certified that this project report entitled " TRAFFIC ENGINEERING & SITE VISIT”
which is submitted by Mr. Vidyasagar R. Pammar (457CE20034), Mr. Sanket B. Muttur
(457CE20018), Mr. Soham P. Khadilkar (457CE20023), Mr. Utkarsh M.
PATIL (457CE20031), Mr. Sagar Belakud (457CE20015), Mr. Prithvi Hondi
(457CE20013), Mr. Ashutosh Patil (457CE20003), Mr. Swaraj Hundre (457CE20029),
Mr. Mangesh Shindolkar (457CE20008), Mr. Rushikesh Kanbarkar (457CE20014), Ms.
Nigar Khatib (457CE20010) a bonafied students in partial fulfilment for the award of
Diploma in Civil Engineering during the year 2022- 2023 is a record of his own work
carried out under my guidance. It is certified that all correction/suggestions indicated for
internal assessment have been incorporated in the report and one copy of it being deposited in
the Institute library.
The project report has been approved as it satisfies the academic requirements in respect of
project work prescribed for the said Diploma Course,
It is future understood that by this certificate the undersigned do not endorse or approved any
statement made, opinion expressed or conclusion draw there in but approve the project only
for which it is submitted.
It is the greatest pleasure and pride that we present this report before you. The satisfaction
and at this moment of triumph it would be unfair to neglect all those who helped us in the
successful completion of the project.
We express our heartiest gratitude to our principal Prof. Mrs. S. S. MALAJ and head of
department Mrs. Laxmi Angadi for all guidance that they provided us.
We have great pleasure to express our deep and sincere gratitude to our project guides
Mr. Pradeep Kulkarni for timely support, advice, Guidance during traffic engineering
survey & Site visit at Udhyambhag, Belagavi and for completing report.
We are Grateful to the people of Godse contractor for their kind co-operation. Lastly we are
grateful to all the people who have helped us directly or indirectly in the completion of this
project.
iii
GROUP No. – 2