You are on page 1of 6

Karnatak law society’s

SHRI VASANTARAO POTDAR POLYTECHNIC


TILAKWADI, BELGAVI 590006

DEPARTMENT OF CIVIL ENGINEERING

“TRAFFIC ENGINEERING & SITE VISIT”

A PROJECT REPORT SUBMITTED IN PARTIAL FULFILLMENT OF


THE REQUIREMENT FOR THE AWARD OF DIPLOMA IN CIVIL
ENGINEERING BY THE BOARD OF TECHNICAL EXAMINATION,
BANGLORE FOR THE ACADEMIC YEAR 2022-2023

SUBMITTED BY:

VIDYASAGAR R. PAMMAR ASHUTOSH PATIL


SANKET B. MUTTUR UTKARSH M. PATIL
SWARAJ HUNDRE SOHAM P. KHADILKAR
MANGESH SHINDOLKAR RUSHIKESH KANBARKAR
SAGAR BELAKUD NIGAR KHATIB
PRITHVI HONDI

UNDER THE GUIDENCE OF


Mr. PRADEEP KULKARNI
BE (Civil), Lecturer

2022-2023
Karnatak Law Society's
SHRI VASANTRAO POTDAR POLYTECHNIC
Tilakwadi, Belagavi-590006

Department of Civil Engineering

Certificate
Certified that this project report entitled " TRAFFIC ENGINEERING & SITE VISIT”
which is submitted by Mr. Vidyasagar R. Pammar (457CE20034), Mr. Sanket B. Muttur
(457CE20018), Mr. Soham P. Khadilkar (457CE20023), Mr. Utkarsh M.
PATIL (457CE20031), Mr. Sagar Belakud (457CE20015), Mr. Prithvi Hondi
(457CE20013), Mr. Ashutosh Patil (457CE20003), Mr. Swaraj Hundre (457CE20029),
Mr. Mangesh Shindolkar (457CE20008), Mr. Rushikesh Kanbarkar (457CE20014), Ms.
Nigar Khatib (457CE20010) a bonafied students in partial fulfilment for the award of
Diploma in Civil Engineering during the year 2022- 2023 is a record of his own work
carried out under my guidance. It is certified that all correction/suggestions indicated for
internal assessment have been incorporated in the report and one copy of it being deposited in
the Institute library.
The project report has been approved as it satisfies the academic requirements in respect of
project work prescribed for the said Diploma Course,
It is future understood that by this certificate the undersigned do not endorse or approved any
statement made, opinion expressed or conclusion draw there in but approve the project only
for which it is submitted.

Mr. Pradeep. Kulkarni


Coarse Co-ordinator

Mrs. LAXMI ANGADI Prof. S. S. MALAJ


H.O.D Principal
ACKNOWLEDGEMENT

It is the greatest pleasure and pride that we present this report before you. The satisfaction
and at this moment of triumph it would be unfair to neglect all those who helped us in the
successful completion of the project.

We express our heartiest gratitude to our principal Prof. Mrs. S. S. MALAJ and head of
department Mrs. Laxmi Angadi for all guidance that they provided us.

We have great pleasure to express our deep and sincere gratitude to our project guides
Mr. Pradeep Kulkarni for timely support, advice, Guidance during traffic engineering
survey & Site visit at Udhyambhag, Belagavi and for completing report.

We are Grateful to the people of Godse contractor for their kind co-operation. Lastly we are
grateful to all the people who have helped us directly or indirectly in the completion of this
project.
iii
GROUP No. – 2

SL.no. REGISTER No. STUDENT NAME

1. 457CE20034 Vidyasagar R. Pammar

2. 457CE20018 Sanket B. Muttur

3. 457CE20023 Soham P. Khadilkar

4. 457CE20031 Utkarsh M. Patil

5. 457CE20015 Sagar Belakud

6. 457CE20013 Prithvi Hondi

7. 457CE20003 Ashutosh Patil

8. 457CE20029 Swaraj Hundre

9. 457CE20008 Mangesh Shindolkar

10. 457CE20014 Rushikesh Kanbarkar

11. 457CE20010 Nigar Khatib


iv
CONTENTS
TRAFFIC ENGINEERING
1.1 OBJECTIVE: 01-03
To conduct a traffic volume study and to determine PCU values.

1.1.1. EQUIPMENT AND FACILITIES


1.1.2. THEORY
1.1.3. PROCEDURE
1.1.4. OBSERVATION
1.1.5. OBSERVATION SHEET
1.2 OBJECTIVE: 04-05
Representation of Traffic composition using tables and chart
1.3 OBJECTIVE: 06-10
To conduct a spot speed study, develop a cumulative frequency speed distribution curve
and calculate various statistical measures.

1.3.1. EQUIPMENT AND FACILITIES


1.3.2. THEORY
1.3.3. PROCEDURE
1.3.4. PRESENTATION OF DATA
1.3.5. RESULT
1.4 HOME INTERVIE: 11-11
By using standard table and format

SITE VISIT REPORT ON RIGID PAVEMENT CONSTRUCTION


2.1. ABOUT LOCATION 12-12
2.2. CONSTRUCTION ASPECTS AND METHODOLOGY OF SUB GRADE.
13-13
2.3 CONSTRUCTION ASPECTS AND METHODOLOGY OF SUB BASE.
13-13
2.4. CONVCRETE PAVEMENT DETAILS (M40) 13-14
2.5. MACHINERIES & EQUIPMENTS USED IN THE CONSTRUCTION OF
CEMENT CONCRETE PAVEMENT AND THERE USES: 14-15
V
2.6. MATERIALS USED & TEST CONDUCTED ON THE MATERIALS:
15-15
2.7 LATEST TECHNOLOGIES USED IN THE CONSTRUCTION OF THE
PAVEMENT: 16-16

2.8 SAFETY MEASURES THAT WERE TAKEN DURING THE CONSTRUCTION


OF PAVEMENT: 16-16

2.9 PHOTO GALLERY: 17-18

You might also like