PT.

CHAROEN POKPAND INDONESIA, TBK- PLANT BIMA


DEPARTEMEN MAINTENANCE & REPAIR

Dryer Tieling TLCL - 900

Maintenance Interval (Operasional Hours or Elapsed Time)


No. Maintenance Task 3h 500 h 1000 h 3000 h 6000 h 9000 h 24000 Comment
1 Dy 1 Mth 2 Mth 6 Mth 1 Yr 1.5 Yr 4 Yr
1 Bearing Lubrication chain grate
2 Lubrication sproket
3 Check Coupling joint (HF dan CF)
4 Check heat exchanger leak
5 Check baja wire rope for bucket coal
6 Check sensor high and low level
7 Check sensor hot fan and cool fan
8 Check power and network cables
9 Bearing lubrication
10 Check furnace strucktur
11 Check sensor furnace
12 Check Joint bolt and welding
13 Clean furnace and heat exchanger
14 Check Impeller (ID, HF, CF)
15 Sensor Calibration
16 Change oil gearbox
17 Change oil Draft fan induced
18 Change baja wire rope BC
19 Change belt
20 Change Bearing

Worked by Knowed by Approved by

Mechanic Electrical Hermanus Setiawan Samsul Hidayat


Spv. Maint & Repair Manager Plant