PT.

CHAROEN POKPAND INDONESIA, TBK- PLANT BIMA


DEPARTEMEN MAINTENANCE & REPAIR

Dryer Tieling TLCL - 900

Maintenance Interval (Operasional Hours or Elapsed Time)


No. Maintenance Task 3h 500 h 1000 h 3000 h 6000 h 9000 h 24000 Comment
1 Dy 1 Mth 2 Mth 6 Mth 1 Yr 1.5 Yr 4 Yr
1 Grease as chain grate
2 Lubrication sproket
3 Check Coupling joint (HF dan CF)
4 Check heat exchanger leak
5 Check baja wire rope for bucket coal
6 Check sensor high and low level
7 Check sensor hot fan and cool fan
8 Check power and network cables
9 Check/change chain grate
10 Bearing lubrication
11 Check furnace strucktur
12 Check sensor furnace
13 Check Joint bolt and welding
14 Clean furnace and heat exchanger
15 Check Impeller (ID, HF, CF)
16 Sensor Calibration
17 Change oil gearbox
18 Change oil Draft fan induced
19 Change baja wire rope BC
20 Change belt

Worked by Knowed by Approved by

Mechanic Electrical Hermanus Setiawan Samsul Hidayat


Spv. Maint & Repair Manager Plant
LAMPIRAN PREVENTIVE DRYER TIELING

Gbr 1. grease bearing chain grate Gbr 2. grease bearing feedroll

Gbr 3. Check couplig joint Gbr 4. Check/change baja wire rope coal bucket

Gbr 5. Check oil level Gbr 6. Check kekentalan oli

Gbr 7. Check/change chain grate Gbr 8. Check power,network cables


Gbr 9. Checkkekencangan baut dryer Gbr 10. Check kebocoran pada heat exchnger

Gbr 11. Pembersihan underground heat exchnger Gbr 12. pembersihan pipa heat exchnger

Gbr 13. Check hot fan sensor Gbr 14. Check high and low lv dryer

Gbr 15. Check impeller Gbr 16. Pengecangan baut dudukan hot fan
Gbr 17. Check struktur bata kubah luar Gbr 18. Check struktur bata kubah dalam