Bill of Quantity

Storage Tank Repainting Project

Metode kerja : Gondola


Metode surface preparation : Power tools
Unit Price
No Job Qty Vol
Material Labor
A TB 6
H : 25.7 M, D : 19.3
1 Power tools surface preparation m² 1557.471
2 Painting primer coat m² 1557.471
3 Painting second coat m² 1557.471
4 Painting Top coat m² 1557.471
B TB 7
H : 25.7 M, D : 19.2
1 Power tools surface preparation m² 1549.402
2 Painting primer coat m² 1549.402
3 Painting second coat m² 1549.402
4 Painting Top coat m² 1549.402
C TB 11
H : 25.8 M, D : 21.3
1 Power tools surface preparation m² 1725.556
2 Painting primer coat m² 1725.556
3 Painting second coat m² 1725.556
4 Painting Top coat m² 1725.556
D In-Direct Item
1 Mob & Demob Lot 1
2 Accomodation & transportation Lot 1
3 QC inspection and project documentation Lot 1
4 Safety Lot 1
5 Gondola Lot 1
6 Scafolding penunjang Lot 1
7 Housekeeping Lot 1
ct

Total Price
Material Labor Ammount

- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -

Total Price -
Bill of Quantity
Storage Tank Repainting Project

Metode kerja : Scafolding full


Metode surface preparation : Power tools
Unit Price
No Job Qty Vol
Material Labor
A TB 6
H : 25.7 M, D : 19.3
1 Power tools surface preparation m² 1557.471
2 Painting primer coat m² 1557.471
3 Painting second coat m² 1557.471
4 Painting Top coat m² 1557.471
B TB 7
H : 25.7 M, D : 19.2
1 Power tools surface preparation m² 1549.402
2 Painting primer coat m² 1549.402
3 Painting second coat m² 1549.402
4 Painting Top coat m² 1549.402
C TB 11
H : 25.8 M, D : 21.3
1 Power tools surface preparation m² 1725.556
2 Painting primer coat m² 1725.556
3 Painting second coat m² 1725.556
4 Painting Top coat m² 1725.556
D In-Direct Item
1 Mob & Demob Lot 1
2 Accomodation & transportation Lot 1
3 QC inspection and project documentation Lot 1
4 Safety Lot 1
5 Scafolding full Lot 1
6 Housekeeping Lot 1
ct

Total Price
Material Labor Ammount

- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -

Total Price -
Bill of Quantity
Storage Tank Repainting Project

Metode kerja : Gondola


Metode surface preparation : Sand Blast SA 2.5
Unit Price
No Job Qty Vol
Material Labor
A TB 6
H : 25.7 M, D : 19.3
1 Sand Blasting surface preparation m² 1557.471
2 Painting primer coat m² 1557.471
3 Painting second coat m² 1557.471
4 Painting Top coat m² 1557.471
B TB 7
H : 25.7 M, D : 19.2
1 Sand Blasting surface preparation m² 1549.402
2 Painting primer coat m² 1549.402
3 Painting second coat m² 1549.402
4 Painting Top coat m² 1549.402
C TB 11
H : 25.8 M, D : 21.3
1 Sand Blasting surface preparation m² 1725.556
2 Painting primer coat m² 1725.556
3 Painting second coat m² 1725.556
4 Painting Top coat m² 1725.556
D In-Direct Item
1 Mob & Demob Lot 1
2 Accomodation & transportation Lot 1
3 QC inspection and project documentation Lot 1
4 Safety Lot 1
5 Gondola Lot 1
6 Scafolding penunjang Lot 1
7 Housekeeping Lot 1
ct

Total Price
Material Labor Ammount

- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -

Total Price -
Bill of Quantity
Storage Tank Repainting Project

Metode kerja : Scafolding full


Metode surface preparation : Sand Blast SA 2.5
Unit Price
No Job Qty Vol
Material Labor
A TB 6
H : 25.7 M, D : 19.3
1 Sand Blasting surface preparation m² 1557.471
2 Painting primer coat m² 1557.471
3 Painting second coat m² 1557.471
4 Painting Top coat m² 1557.471
B TB 7
H : 25.7 M, D : 19.2
1 Sand Blasting surface preparation m² 1549.402
2 Painting primer coat m² 1549.402
3 Painting second coat m² 1549.402
4 Painting Top coat m² 1549.402
C TB 11
H : 25.8 M, D : 21.3
1 Sand Blasting surface preparation m² 1725.556
2 Painting primer coat m² 1725.556
3 Painting second coat m² 1725.556
4 Painting Top coat m² 1725.556
D In-Direct Item
1 Mob & Demob Lot 1
2 Accomodation & transportation Lot 1
3 QC inspection and project documentation Lot 1
4 Safety Lot 1
5 Scafolding penunjang Lot 1
6 Housekeeping Lot 1
ct

Total Price
Material Labor Ammount

- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -

- - -
- - -
- - -
- - -

Total Price -
Paint Specification
Brand : Jumlah
Primer coat spec : ….... Liter
Thinner spec : ….... Liter
Second coat spec : ….... Liter
Thinner spec : ….... Liter
Top coat spec : ….... Liter
Thinner spec : ….... Liter
Primer DFT : …...... µ
Second DFT : …...... µ
Top coat DFT : …...... µ
Total DFT : 320 µ
Gondola Specification
Picture

Dimension Length meter


Width meter
Height meter
Weigth Kg
Metode Scafolding
1 Menggunakan scafolding jenis tubular
2 Quantity scafolding dapat memenuhi seluruh lingkaran tangki (bukan parsial)
Metode Gondola
1 Menggunakan gondola dengan berat selama bekerja tidak lebih dari 150 kg
2 Diperkenankan menambahkan anchor tambahan dibagian atap dengan terlebih dahulu mengajukan
technical plan nya
3 Scafolding dalam BoQ metode ini hanya sebagai penunjang untuk spot yang tidak memungkinkan dijangkau gondola
4 Gondola yang digunakan harus memenuhi standar kerja dan keselamatan
5 Gondola wajib menyertakan sertifikat layak digunakan
6 Kontraktor wajib menyediakan inspektor bersertifikat TKPK 3 untuk melakukan assesment tali gondola
7 Assesment tali gondola dilakukan secara periodik selama proyek berjalan.

QC Inspection
1 Pihak kontraktor menyediakan tim QC painting yang memiliki sertifikat dan yang ditunjuk oleh principle cat.
2 QC inspection wajib dilakukan di setiap proses pengerjaan

Safety
1 Kontraktor wajib menyiapkan personel safety officer yang bersertifikat AK3 dan berkemampuan melakukan DCU (t

Accomodation, transportation & mobilization


1 Direkomendasikan untuk dapat menyewa rumah kontrakan di daerah Maridan (ITCI), harga rata2 rumah sewa Rp 3
dengan biaya speed boat dari Maridan ke site LDC sebesar Rp 250.000/ 2 trip sehari (Cp : H. Yahya 0813-8570-8774
2 Direkomendasikan untuk menggunakan jasa kapal klotok barang sebagai media penyeberangan material maupun a
ke site LDC (Cp : Agus 0852-4637-6919)
u mengajukan

mungkinkan dijangkau gondola

ment tali gondola

njuk oleh principle cat.

mampuan melakukan DCU (tensimeter)

harga rata2 rumah sewa Rp 3.000.000 / bulan,


Cp : H. Yahya 0813-8570-8774)
berangan material maupun alat dari kampung baru
Metode kerja Jumlah Qty
A Metode Gondola + Power Tools ….. Bulan
B Metode Gondola + Sand Blasting ….. Bulan
C Metode Scafolding full + Power Tools ….. Bulan
D Metode Scafolding full + Sandblasting ….. Bulan