Professional Documents
Culture Documents
Project Name
xx-xxxx-xxxx 1
E.N. E.N.
FGL 0.00
Acting Loads
• Own weight of concrete
• Weight of water
m
• Weight of soil above the tank SWL -1
2.7
• Lateral earth pressure
h1 =
• Lateral hydrostatic pressure due to ground water
• Soil reaction below the tank
• Uplift force due to ground water SFL -2.70
Cases of Loading
Empty
Tank is full of water and no Tank is empty and consider During operation and
soil around the tank soil around the tank dewatering around the tank
Design Data:
Cubic Compressive Strength of Concrete fcu = 40 MPa
Specified Compressive Strength of Concrete f'c = 32 MPa
Specified Yield Strength of Reinforcement fy = 400 MPa
Density of Concrete γc = 25 kN/m3
Modulus of Elasticity of Concrete Ec = 30405 MPa
Modulus of Elasticity of Reinforcement Es = 200000 MPa
Allowable Soil Bearing Capacity qall = 250 kPa
Earth Pressure Coefficient At Rest Ko = 0.5
Soil Bulk Density γs = 18 kN/m3
Submerged Soil Density γs' = 8 kN/m3
Density of Water γw = 10 kN/m3
Ground Water Table below FGL hGW = 6 m
Height of Sewage Water Hsw = 2.7 m
Surcharge Load q= 20 kN/m2
Length of Sludge Trap L1 = 1.4 m
Length of Petrol Interceptor L2 = 1.4 m
Length of the Base Overhang L3 = 0.05 m
Width of the Tank B= 1.4 m
Height of the Tank H= 3 m
Thickness of the Outer Walls tw1 = 0.3 m
Thickness of the Inner Wall tw2 = 0.3 m
Thickness of the Roof Slab tR = 0.3 m
Thickness of the Base tbase = 0.4 m
Total Length of the Base Lbase = 3.8 m
Total Breadth of the Base Bbase = 2.1 m
Project Project Code Sheet No.
Project Name
xx-xxxx-xxxx 2
E.N. E.N.
Wtotal = 310 kN
Loads Calculations
Consider a strip of 1.0 m width
Loads acting on the upper roof W1 = tR*1*γc
10.8
W1 = 7.5 kN/m'
E.N. E.N.
W3 = 27 kN/m' 10.8
Wα
b= 10.80 m Continous Both Ends mb = 0.76
5.4
r= 1.75
α= 0.90 Wα = 24.38 kN/m' Wβ
β= 0.10 Wβ = 2.62 kN/m'
Summary of Loads
7.06
24.38 24.38
12.84
Critical Sections
E.N. E.N.
Total weight of the tank including its contents Wtotal = Lbase*Bbase*tbase*γc + 2*B*H*tw1*γc + B*H*tw2*γc + L1*B*tR*γc +
2*Lbase*L3*H*γs + 2*(Bbase-2*L3)*L3*H*γs
Wtotal = 500 kN
W1
x
e2' 6m
ew e3 e2 e1 e1 e2 e3 ew
W2
Loads Calculations
Consider a strip of 1.0 m width
Loads acting on the upper roof W1 = tR*1*γc + q*1
10.8
W1 = 27.5 kN/m'
E.N. E.N.
15.4
Wβ
b= 15.4 m Continous Both Ends mb = 0.76
r= 1.43
α= 0.81 Wα = 72.67 kN/m' Wα
β= 0.19 Wβ = 17.58 kN/m'
e1 = 10 kN/m'
e2 = γs*hGW*ko
e2 = 54 kN/m'
e2' = γs*x*ko
e3 = γs'*(h1-hGW)*ko
e3 = -13.20 kN/m'
ew = γw*(h1-hGW)
ew = -33.00 kN/m'
eR = e1 + e2'
eR = 7.30 kN/m'
eT = e1 + e2 + e3 + ew - eR
eT = 10.50 kN/m'
r= 2.29
α= 0.96 Wα = 7.04 kN/m' Wβ
β= 0.04 Wβ = 0.26 kN/m'
Project Project Code Sheet No.
Project Name
xx-xxxx-xxxx 6
E.N. E.N.
Wα
b= 10.8 m Continous Both Ends mb = 0.87
5.40
r= 2.29
α= 0.96 Wα = 10.13 kN/m' Wβ
β= 0.04 Wβ = 0.37 kN/m'
Summary of Loads
26.55
10.13
10.13
7.04
7.04
17.58
Critical Sections
1 2
Project Project Code Sheet No.
Project Name
xx-xxxx-xxxx 7
E.N. E.N.
Check of Uplift
Total weight of the tank Wtotal = Lbase*Bbase*tbase*γc + 2*B*H*tw1*γc + B*H*tw2*γc + L1*B*tR*γc +
Wtotal = 235 kN
q= 29.45 kPa
F.O.S. = q/quplift
W1
x
e2'
e2 e1 e1 e2
W2
Loads Calculations
Consider a strip of 1.0 m width
Loads acting on the upper roof W1 = tR*1*γc + q*1
10.8
W1 = 27.5 kN/m'
E.N. E.N.
10.8
W2 = 58.93 kN/m'
15.4
Wβ
b= 15.4 m Continous Both Ends mb = 0.76
r= 1.43
α= 0.81 Wα = 47.45 kN/m' Wα
β= 0.19 Wβ = 11.48 kN/m'
e1 = 10 kN/m'
e2 = γs*h1*ko
e2 = 24.3 kN/m'
e2' = γs*x*ko
eR = e1 + e2'
eR = 7.30 kN/m'
eT = e1 + e2 - eR
eT = 27.00 kN/m'
r= 2.29
α= 0.96 Wα = 7.04 kN/m' Wβ
β= 0.04 Wβ = 0.26 kN/m'
r= 2.29
α= 0.96 Wα = 26.05 kN/m' Wβ
β= 0.04 Wβ = 0.95 kN/m'
Project Project Code Sheet No.
Project Name
xx-xxxx-xxxx 9
E.N. E.N.
Summary of Loads
26.55
26.05
26.05
7.04
7.04
11.48
Critical Sections
1 2
Summary of Critical Sections for all Cases of Loading