1) Water Full condition ( Hydro test condition) + Earth below base slab
2) Soil and surcharge from outside & Filter Bed empty + Earth below base slab + Media Pressure
Load case 1:
4.9
49
2.1
18
29.8125
Lateral earth pressure on wall from soil below base slab= 2.15x 0.5 x 18 = 18 kN/m2
Load case 2:
FGL
2.7 2.1
24.3 18
5 18.8125
Earth pressure acting at the base of the wall =2.7x18x0.5 = 24.3 kN/m2
Lateral earth pressure on wall from soil below base slab= 18 kN/m2
Design Constants:
m= 9.333
k= 0.418
j= 0.861
Q= 1.799
Load diagram:
10.89
0.9
Thickness required=
= 4.41x10^6 X 6/(2x1000) = 115.022 mm
Provide slab thickness = 150 mm
OK
Distribution Steel
Diameter of bar provided = 8 mm
Minimum percentage of steel required = 0.35 %
Minimum Area of steel required on each face = 262.5 mm2/m
Provide 8 mm dia tor steel at a spacing (on top face) = 150 mm c/c
Calculation of Vertical load in gallery area (On one Side+tr. Water channel/2) - Control room ar
### #REF! kN
### #REF! kN
### #REF! kN
### #REF! kN
### #REF! kN
### #REF! kN
### #REF! kN
### #REF! kN
### #REF! kN
### #REF! kN
### #REF! kN
### #REF! kN
### #REF! m
Calculation of Vertical load in gallery area (On one Side+tr.water channel) - Other area
### #REF! kN
### #REF! kN
### #REF! m