You are on page 1of 33

L&T Construction

Water & Effluent Treatment IC


DOCUMENT NO. Date
PROJECT: #REF!
#REF! 09-May-2024

DESIGNED CHECKED PAGE


STRUCTURE: #REF!
#REF! #REF!
(6.4) Wind Load Calculation

Basic wind Speed considered (Vb) = 50.00 m/sec

Design Wind Speed is given by Vz = K1 x K2 x K3 x Vb

Risk Coefficient, K1 (Table:1 IS 875 - PART 3) = 1.00

Table 2: Terrain, Height and structure size Coefficient (K2 - 0m to 10m)= 1.00

IS 875 Terrain, Height and structure size Coefficient (K2 - 10m to 15m)= 1.05

(PART 3) Terrain, Height and structure size Coefficient (K2 - 15m to 20m)= 1.07

Terrain, Height and structure size Coefficient (K2 - 20m to 30m)= 1.12

(for Terrain Catergory = 2)

Topography Factor (K3) = 1.00

Importance factor for cyclonic region (K4) 1.30

Design Wind Speed is given by Vz (0m- 10m) = 50 x 1 x 1 x 1 x 1.3 = 65.00 m/sec

Design Wind Speed is given by Vz (10m- 15m) = 50 x 1 x 1.05 x 1 x 1.3 = 68.25 m/sec

Design Wind Speed is given by Vz (15m- 20m) = 50 x 1 x 1.07 x 1 x 1.3 = 69.55 m/sec

Design Wind Speed is given by Vz (20m- 30m) = 50 x 1 x 1.12 x 1 x 1.3 = 72.80 m/sec

Wind Pressure (0m - 10m) = pz 0.6 x 65� = 2.54 N/m2

Wind Pressure (10m - 15m) = pz 0.6 x 68.25� = 2.80 N/m2

Wind Pressure (15m - 20m) = pz 0.6 x 69.55� = 2.90 N/m2

Wind Pressure (20m - 30m) = pz 0.6 x 72.8� = 3.18 N/m2

CL 7.2 Wind directionality factor Kd 1.00

CL 7.2.1 Area averaging factor ka 0.80

Combination Factor kc 1.00

Design wind Pressure Pd = KdxKaxKcxPz

Design Wind Pressure (0m - 10m) = pd = KdxKaxKcxP .535x 1x 0.8x 1 = 2.03 N/m2

Design Wind Pressure (10m - 15m) = pd = KdxKaxKcxP .795x 1x 0.8x 1 = 2.24 N/m2

Design Wind Pressure (15m - 20m) = pd = KdxKaxKcxP .902x 1x 0.8x 1 = 2.32 N/m2

Design Wind Pressure (20m - 30m) = pd = KdxKaxKcxP 3.18x 1x 0.8x 1 = 2.54 N/m2
# 000000Sensitivity: LNT Construction Internal Use
L&T Construction
Water & Effluent Treatment IC
DOCUMENT NO. Date
PROJECT: #REF!
#REF! 09-May-2024

DESIGNED CHECKED PAGE


STRUCTURE: #REF!
#REF! #REF!

For all Circular members in Plan consider Shape Factor as 0.7

Projected area of the Tank upto top of bottom slab

Shape factor for circular Structure= 0.70

# 000000Sensitivity: LNT Construction Internal Use


L&T Construction
Water & Effluent Treatment IC
DOCUMENT NO. Date
PROJECT: #REF!
#REF! 09-May-2024

DESIGNED CHECKED PAGE


STRUCTURE: #REF!
#REF! #REF!

a) Wind load on Cylindrical Wall

Height of cylindrical wall = #REF! m

Projected area of cylindrical wall = #REF! #REF! m2

Wind load acting on the projected area (0m - 10m) = 0.7 x 2.03= 1.42 kN/m2

Wind load acting on the projected area (10m - 15m) = 0.7 x 2.24= 1.57 kN/m2

Wind load acting on the projected area (15m - 20m) = 0.7 x 2.32= 1.62 kN/m2

Wind load acting on the projected area (20m - 30m) = 0.7 x 2.54= 1.78 kN/m2

For Load application in staad

Equivalent Wind load normal to surface (0m - 10m) = 1.42 / π/2 0.90 kN/m2

Equivalent Wind load normal to surface (10m - 15m) = 1.57 /π/2 1.00 kN/m2

Equivalent Wind load normal to surface (15m - 20m) = 1.62 / π/2 1.03 kN/m2

Equivalent Wind load normal to surface (20m - 30m) = 1.78 / π/2 1.13 kN/m2

Staging Height = #REF! m

Columns along wind (Outer columns) = 7 Nos

Outer Column diameter = #REF! m

Inner Column Diameter = #REF! m

Frame area of staging = #REF! #REF! m2

No. of tie level beam exposed to wind = 5 Nos

Area of beams exposed to wind = #REF! #REF! m2

Area of columns exposed to wind = #REF! #REF! m2

Total exposed Area of staging = #REF! #REF! m2

Solidity Ratio #REF! #REF!

Force Coefficient for flat-sided Members, Cf = 1.70


From table -
31 of IS 875
Force Coefficient for Circular-Sections, Cf = 0.80

For 0 m -10 m

Force on outer columns #REF! #REF! kN/m

Force on inner columns #REF! #REF! kN/m


# 000000Sensitivity: LNT Construction Internal Use
L&T Construction
Water & Effluent Treatment IC
DOCUMENT NO. Date
PROJECT: #REF!
#REF! 09-May-2024

DESIGNED CHECKED PAGE


STRUCTURE: #REF!
#REF! #REF!
Force from Tie Beam #REF! #REF! kN

For 10 m -15 m

Force on outer columns #REF! #REF! kN/m

Force on inner columns #REF! #REF! kN/m

Base level beams & Tie Beams

Force from base level Beam #REF! #REF! kN

Force from Tie Beam #REF! #REF! kN

For 15 m -20 m

Force on outer columns #REF! #REF! kN/m

Force on inner columns #REF! #REF! kN/m

Base level beams & Tie Beams

Force from base level Beam #REF! #REF! kN

Force from Tie Beam #REF! #REF! kN

For 20 m -30 m

Force on outer columns #REF! #REF! kN/m

Force on inner columns #REF! #REF! kN/m

Base level beams & Tie Beams

Force from base level Beam #REF! #REF! kN

Force from Tie Beam #REF! #REF! kN

C) Wind load on stair case

Length (b) = 3.05 m

Width (a) = 2.45 m

Height (h) = 31.00 m

Width of column = 0.50 m

Depth of beam = 0.40 m


# 000000Sensitivity: LNT Construction Internal Use
L&T Construction
Water & Effluent Treatment IC
DOCUMENT NO. Date
PROJECT: #REF!
#REF! 09-May-2024

DESIGNED CHECKED PAGE


STRUCTURE: #REF!
#REF! #REF!
Exposed area = 31x3.05 94.55 m2

Total exposed area of column = = 31 x 0.5 x 2 31.00 m2

Total exposed area of beam = = x 3.05 x 10 0.00 m2

Total exposed area of column & beam = 0 + 31 31.00 m2

Solidity ratio 0.30

Force coefficient = 1.70

For 0 m -10 m

Columns = 1.7 x 0.5 x 2.03 = 1.73 kN/m

Force from stair Beam (1.7 x 2.03 x 3.05 x 0.4 ) /2= 1.76 kN

For 10 m -15 m

Columns = 1.7 x 0.5 x 2.24 = 1.90 kN/m

Force from stair Beam (1.7 x 2.24 x 3.05 x 0.4 ) /2= 1.94 kN

For 15 m -20 m

Columns = 1.7 x 0.5 x 2.32 = 1.97 kN/m

Force from stair Beam (1.7 x 2.32 x 3.05 x 0.4 ) /2= 2.01 kN

For 20 m -30 m

Columns = 1.7 x 0.5 x 2.54 = 2.16 kN/m

Force from stair Beam (1.7 x 2.54 x 3.05 x 0.4 ) /2= 2.20 kN

# 000000Sensitivity: LNT Construction Internal Use


45
L&T Construction
Water and Effluent Treatment IC
DOCUMENT NO. DATE
PROJECT: #REF!
#REF! 09-May-2024

DESIGNED CHECKED PAGE


STRUCTURE: #REF!
#REF! #REF!
(10) DESIGN OF BASE RAFT
Net SBC recommendation = #REF! kN/m2
Depth of foundation below NGL/FGL = #REF! m
Density of soil = #REF! kN/m3
Grade of Concrete, fck = #REF! N/mm2
Grade of Steel, fy = #REF! N/mm2
#REF! #REF! kN/m2
#REF! #REF! kN/m2
Permissible settlement of raft = 40 mm
Subgrade modulus for raft design = #REF! #REF! kN/m2/m

Thickness of base raft = 450 mm


Diameter of circular Raft = 34.65 m
Check For Foundation Pressure:
Pg No: B2 Base pressure under normal case (From STAAD) = 139 kN/m2
Pg No: B2 Base pressure under seismic/Wind case (From STAAD) = 142 kN/m2
Dead load of raft slab = #REF! #REF! kN/m2
Dead load of soil #REF! #REF! kN/m2

Under Normal Condition:


Maximum Base Pressure normal case = #REF! kN/m2
Allowable Net bearing pressure = #REF! kN/m2
#REF!

Under Seismic/Wind Condition:


Maximum Base Pressure seismic case = #REF! #REF! kN/m2
Allowable Net bearing pressure = #REF!
#REF!

Check for overturning moment due to wind


(a) When tank is Full:
Horizontal load causing overturning moment (Total reaction of wind load ) = 1147.95 kN
From
STAAD Conservatevly, all loads are considered at mid height of container = #REF! m
Overturning moment = ### #REF! kNm
Restoring Moment due to self weight of tank (Tank full case) :
Weight of tank causing restoring moment (Total Dead load of tank and Water)

# 000000Sensitivity: LNT Construction Internal Use


46
L&T Construction
Water and Effluent Treatment IC
DOCUMENT NO. DATE
PROJECT: #REF!
#REF! 09-May-2024

DESIGNED CHECKED PAGE


STRUCTURE: #REF!
#REF! #REF!
= ### #REF! kN

# 000000Sensitivity: LNT Construction Internal Use


47
L&T Construction
Water and Effluent Treatment IC
DOCUMENT NO. DATE
PROJECT: #REF!
#REF! 09-May-2024

DESIGNED CHECKED PAGE


STRUCTURE: #REF!
#REF! #REF!
#REF! #REF! m

Restoring Moment = #REF! #REF! kN-m

Factor of safety against overturning = ### #REF!


#REF!

(b) When tank is Empty:


STAAD Horizontal load causing overturning moment (Total reaction of wind load ) = 1147.95 kN
Conservatevly, all loads are considered at mid height of container = #REF! m
Overturning moment = ### #REF! kNm
Restoring Moment due to self weight of tank (Tank Empty case) :
Weight of tank causing restoring moment (Total Dead load )
= ### #REF! kN
#REF! #REF! m
Restoring Moment = #REF! #REF! kN-m
Factor of safety against overturning = ### #REF!
#REF!
Raft Thickness:
Maximum Factored Bending moment ( From STAAD ) = 380 kN-m
Depth required, d = (Mu/0.133fckb)0.5 =
### #REF! mm
#REF!

Raft Reinforcement:
(A) Reinforcement along Column Strip
Top face Reinforcement :
Pg No: B2 Maximum BM causing Tension on the Top face of Raft (M x or My) = 178 kN-m/m

Total net Bending Moment at top face of raft = 178 kN-m/m

Diameter of bar provided = 12 mm


Cover to the reinforcement = 40 mm
Effective depth of Raft = 450-40-12/2 = 404 mm
R= Mu/bd2 = 1.09 Mpa
#REF! #REF! %
Area of steel required for Bending = #REF! mm2/m
Minimuml reinforcement required 0.12 %
# 000000Sensitivity: LNT Construction Internal Use
48
L&T Construction
Water and Effluent Treatment IC
DOCUMENT NO. DATE
PROJECT: #REF!
#REF! 09-May-2024

DESIGNED CHECKED PAGE


STRUCTURE: #REF!
#REF! #REF!
Minimum Area of steel required = 484.80 mm2/m

# 000000Sensitivity: LNT Construction Internal Use


49
L&T Construction
Water and Effluent Treatment IC
DOCUMENT NO. DATE
PROJECT: #REF!
#REF! 09-May-2024

DESIGNED CHECKED PAGE


STRUCTURE: #REF!
#REF! #REF!
Spacing of bar required = #REF! mm c/c

#REF!

Area of steel provided on top face of raft = #REF! mm2/m


Percentage of steel provided = #REF! %

Bottom face Reinforcement :


Pg No: B3 Maximum BM causing Tension on Bottom face of Raft (M x or My) = 380 kN-m/m

Total net B M at Bottom face of raft = 380 kN-m/m

Diameter of bar provided = 20 mm


Cover to the reinforcement = 50 mm
Effective depth of Raft = 450-50-20/2 = 390 mm
R= Mu/bd2 = 2.50 Mpa
#REF! #REF! %
Area of steel required for Bending = #REF! mm2/m
Minimuml reinforcement required 0.12 %
Minimum Area of steel required in each direction = 468.00 mm2/m
Spacing of bar required = #REF! mm c/c

#REF!

Area of steel provided on Bottom face of raft = #REF! mm2/m


Percentage of steel provided = #REF! %

Check for Shear stress


Shear is checked at a distance 'd' from face of column

Maximum Factored Shear stress (SQx or SQy)= 0.988 N/mm2


Maximum shear stress tcmax = #REF! N/mm2
#REF!

Tension reinforcement available at this section is, A st = #REF! mm2


100Ast/bd = ### #REF!
#REF!
tc = #REF! MPa
#REF!

# 000000Sensitivity: LNT Construction Internal Use


50
L&T Construction
Water and Effluent Treatment IC
DOCUMENT NO. DATE
PROJECT: #REF!
#REF! 09-May-2024

DESIGNED CHECKED PAGE


STRUCTURE: #REF!
#REF! #REF!
Diameter of Shear link = 16 mm
Unbalanced shear, V = (tv-tc)bd = #REF! N
Spacing of Link required =0.87f
, Sv= yAsvd/V #REF! mm
Spacing provided = #REF! mm
#REF!
(B) Reinforcement along middle strip:
Thickness of raft = 450.00 mm
Maximum Factored Bending moment ( From STAAD ) = 188 kN-m
Depth required, d = (Mu/0.133fckb)0.5 =
### #REF! mm
#REF!

Top face Reinforcement :


Pg No: B3 Maximum BM causing Tension on the Top face of Raft (M x or My) = 153 kN-m/m

Total net B M at top face of raft = 153 kN-m/m

Diameter of bar provided = 12 mm


Cover to the reinforcement = 40 mm
Effective depth of Raft = 450-40-12/2 = 404 mm
R= Mu/bd2 = 0.94 Mpa
#REF! #REF! %
Area of steel required for Bending = #REF! mm2/m
Minimuml reinforcement required 0.12 %
Minimum Area of steel required on each face = 484.80 mm2/m
Spacing of bar required = #REF! mm c/c

#REF!

Area of steel provided on top face of raft = #REF! mm2/m


Percentage of steel provided = #REF! %

Bottom face Reinforcement :


Pg No: B3 Maximum BM causing Tension on Bottom face of Raft (M x or My) = 188 kN-m/m

Total net B M at Bottom face of raft = 188 kN-m/m

Diameter of bar provided = 16 mm


Cover to the reinforcement = 50 mm

# 000000Sensitivity: LNT Construction Internal Use


51
L&T Construction
Water and Effluent Treatment IC
DOCUMENT NO. DATE
PROJECT: #REF!
#REF! 09-May-2024

DESIGNED CHECKED PAGE


STRUCTURE: #REF!
#REF! #REF!
Effective depth of Raft = 450-50-16/2 = 392 mm
R= Mu/bd2 = 1.22 Mpa
#REF! #REF! %
Area of steel required for Bending = #REF! mm2/m
Minimuml reinforcement required 0.12 %
Minimum Area of steel required on each face = 470.40 mm2/m
Spacing of bar required = #REF! mm c/c

#REF!

Area of steel provided on Bottom face of raft = #REF! mm2/m


Percentage of steel provided = #REF! %

# 000000Sensitivity: LNT Construction Internal Use


Design of Isolated Footing -F1
e Mx
Founding level below FGL 1.00 Ds 1.75 m
Density of soil gs 18.00 kN/m 3
d X
Allowable Net SBC 150.00 kN/m² Mz L
B (m) L (m) D(m) Weight (KN) Z
Column 0.30 0.50
Fdn 2.00 2.00 0.40 40.00
Soil filling 2.00 2.00 1.35 93.56

Total wt 133.56 kN B

Jt LOAD FORCE-X FORCE-Y FORCE-Z MOM-X MOM Z Total wt P/A Mxx/(L²B/6) Mzz/(B²L/6) Pmax Pmin Load SBC GBC pnet pdesign Mxu Mzu Vxu Vzu Punching SBC check Overturning check Sliding check

Factor Factor In x- direc In z-direc

51 201 DL+LL 15 296 15 9 -7 429.76 107.44 7.05 5.45 119.93 94.94 1.50 1.00 181.50 95.63 85.63 36.13 46.40 53.69 65.00 444.31 SAFE 59.18 45.73 SAFE 14.66 SAFE
202 DL+LL+SL+X -5 268 15 10 40 401.89 100.47 7.40 30.17 138.04 62.90 1.20 1.25 219.00 113.74 103.74 35.01 44.97 52.04 62.99 322.00 SAFE 9.99 40.76 SAFE 13.55 SAFE
203 DL+LL+SL-X 35 324 14 9 -55 457.63 114.41 6.70 41.07 162.17 66.64 1.20 1.25 219.00 137.87 127.87 43.16 55.43 64.14 77.64 388.89 SAFE 8.36 51.23 SAFE 6.62 SAFE
204 DL+LL+SL+Z 15 322 14 5 -7 455.06 113.77 3.86 5.46 123.08 104.45 1.20 1.25 219.00 98.78 88.78 29.96 38.49 44.53 53.91 385.81 SAFE 62.56 88.49 SAFE 15.52 SAFE
205 DL+LL+SL-Z 15 271 15 14 -7 404.45 101.11 10.24 5.44 116.79 85.44 1.20 1.25 219.00 92.49 82.49 27.84 35.76 41.38 50.09 325.08 SAFE 55.8 29.63 SAFE 13.51 SAFE
206 DL+SL+X -5 250 15 10 40 383.46 95.87 7.67 29.65 133.18 58.55 1.50 1.25 219.00 108.88 98.88 41.71 53.58 62.00 75.05 374.86 SAFE 9.71 37.51 SAFE 12.63 SAFE
207 DL+SL-X 35 306 15 9 -55 439.20 109.80 6.97 41.59 158.36 61.24 1.50 1.25 219.00 134.06 124.06 52.34 67.23 77.79 94.16 458.46 SAFE 7.92 47.26 SAFE 6.31 SAFE
208 DL+SL+Z 15 303 14 6 -8 436.63 109.16 4.13 5.98 119.27 99.05 1.50 1.25 219.00 94.97 84.97 35.85 46.04 53.28 64.49 454.62 SAFE 54.74 79.32 SAFE 14.67 SAFE
209 DL+SL-Z 15 252 15 14 -8 386.02 96.51 10.51 5.96 112.98 80.03 1.50 1.25 219.00 88.68 78.68 33.19 42.63 49.33 59.72 378.70 SAFE 48.56 27.55 SAFE 12.6 SAFE
210 DL+LL+WL+X 7 290 15 10 8 423.06 105.77 7.22 6.25 119.23 92.30 1.20 1.25 219.00 94.93 84.93 28.66 36.82 42.60 51.57 347.41 SAFE 50.81 43.95 SAFE 14.37 SAFE
211 DL+LL+WL-X 22 303 14 9 -22 436.43 109.11 6.88 16.87 132.86 85.36 1.20 1.25 219.00 108.56 98.56 33.26 42.72 49.44 59.84 363.45 SAFE 19.4 47.6 SAFE 9.88 SAFE
212 DL+LL+WL+Z 15 298 14 9 -7 431.66 107.92 6.76 5.45 120.13 95.71 1.20 1.25 219.00 95.83 85.83 28.97 37.21 43.05 52.11 357.73 SAFE 59.45 47.87 SAFE 14.72 SAFE
213 DL+LL+WL-Z 15 294 15 10 -7 427.65 106.91 7.61 5.44 119.97 93.86 1.20 1.25 219.00 95.67 85.67 28.91 37.14 42.97 52.02 352.91 SAFE 58.95 42.13 SAFE 14.36 SAFE
214 DL+WL+X 7 271 15 10 8 404.63 101.16 7.49 5.72 114.37 87.95 1.50 1.25 219.00 90.07 80.07 33.78 43.39 50.20 60.77 406.62 SAFE 53.06 40.51 SAFE 13.42 SAFE
215 DL+WL-X 22 284 15 10 -23 418.00 104.50 7.15 17.40 129.05 79.95 1.50 1.25 219.00 104.75 94.75 39.97 51.34 59.41 71.91 426.67 SAFE 18.02 43.87 SAFE 9.37 SAFE

216 DL+WL+Z 15 280 15 9 -8 413.23 103.31 7.03 5.97 116.32 90.30 1.50 1.25 219.00 92.02 82.02 34.60 44.44 51.42 62.25 419.51 SAFE 51.89 44.06 SAFE 13.88 SAFE
217 DL+WL-Z 15 276 15 11 -8 409.22 102.30 7.89 5.97 116.16 88.45 1.50 1.25 219.00 91.86 81.86 34.53 44.36 51.32 62.13 413.49 SAFE 51.44 38.93 SAFE 13.42 SAFE
52 201 DL+LL -15 298 18 12 9 431.76 107.94 9.03 6.77 123.73 92.15 1.50 1.00 181.50 99.43 89.43 37.73 48.46 56.07 67.88 447.30 SAFE 47.86 35.88 SAFE 11.75 SAFE
202 DL+LL+SL+X -35 326 18 11 56 459.64 114.91 8.53 42.37 165.82 64.00 1.20 1.25 219.00 141.52 131.52 44.39 57.01 65.97 79.86 391.30 SAFE 8.14 40.41 SAFE 6.58 SAFE
203 DL+LL+SL-X 5 270 19 13 -38 403.87 100.97 9.52 28.84 139.33 62.61 1.20 1.25 219.00 115.03 105.03 35.45 45.53 52.68 63.77 324.38 SAFE 10.51 31.82 SAFE 10.77 SAFE
204 DL+LL+SL+Z -15 322 19 8 9 455.27 113.82 5.89 6.77 126.48 101.15 1.20 1.25 219.00 102.18 92.18 31.11 39.96 46.24 55.97 386.06 SAFE 50.42 57.97 SAFE 12.03 SAFE
205 DL+LL+SL-Z -15 275 18 16 9 408.24 102.06 12.16 6.76 120.98 83.14 1.20 1.25 219.00 96.68 86.68 29.26 37.58 43.48 52.63 329.63 SAFE 45.29 25.18 SAFE 11.46 SAFE
206 DL+SL+X -35 309 18 12 56 442.22 110.55 8.73 41.87 161.15 59.96 1.50 1.25 219.00 136.85 126.85 53.51 68.74 79.53 96.28 462.99 SAFE 7.93 38.01 SAFE 6.37 SAFE
207 DL+SL-X 5 253 19 13 -39 386.45 96.61 9.72 29.35 135.68 57.55 1.50 1.25 219.00 111.38 101.38 42.77 54.93 63.56 76.94 379.34 SAFE 9.88 29.84 SAFE 10.2 SAFE
208 DL+SL+Z -15 304 19 8 8 437.85 109.46 6.09 6.27 121.81 97.11 1.50 1.25 219.00 97.51 87.51 36.92 47.42 54.87 66.42 456.44 SAFE 52.41 53.97 SAFE 11.45 SAFE
209 DL+SL-Z -15 257 18 16 8 390.82 97.71 12.36 6.25 116.32 79.09 1.50 1.25 219.00 92.02 82.02 34.60 44.44 51.42 62.25 385.90 SAFE 46.87 23.73 SAFE 10.85 SAFE
210 DL+LL+WL+X -23 305 18 12 24 438.45 109.61 8.84 18.22 136.67 82.55 1.20 1.25 219.00 112.37 102.37 34.55 44.38 51.35 62.16 365.87 SAFE 18.05 37.2 SAFE 9.74 SAFE
211 DL+LL+WL-X -7 292 19 12 -7 425.07 106.27 9.27 4.90 120.44 92.10 1.20 1.25 219.00 96.14 86.14 29.07 37.34 43.21 52.30 349.82 SAFE 65.09 34.39 SAFE 11.4 SAFE
212 DL+LL+WL+Z -15 300 18 12 9 433.65 108.41 8.74 6.77 123.92 92.91 1.20 1.25 219.00 99.62 89.62 30.25 38.85 44.95 54.42 360.12 SAFE 48.07 37.23 SAFE 11.81 SAFE
213 DL+LL+WL-Z -15 296 19 13 9 429.93 107.48 9.60 6.77 123.84 91.12 1.20 1.25 219.00 99.54 89.54 30.22 38.82 44.92 54.37 355.65 SAFE 47.67 33.6 SAFE 11.55 SAFE
214 DL+WL+X -22 287 18 12 24 421.03 105.26 9.04 17.71 132.00 78.51 1.50 1.25 219.00 107.70 97.70 41.22 52.94 61.26 74.16 431.21 SAFE 17.83 34.95 SAFE 9.45 SAFE
215 DL+WL-X -7 274 19 13 -7 407.65 101.91 9.47 5.40 116.78 87.04 1.50 1.25 219.00 92.48 82.48 34.80 44.70 51.72 62.60 411.14 SAFE 56.58 32.3 SAFE 10.82 SAFE
216 DL+WL+Z -15 283 19 12 8 416.23 104.06 8.93 6.26 119.25 88.86 1.50 1.25 219.00 94.95 84.95 35.84 46.03 53.26 64.48 424.01 SAFE 49.87 34.95 SAFE 11.22 SAFE
217 DL+WL-Z -15 279 19 13 8 412.51 103.13 9.79 6.26 119.18 87.08 1.50 1.25 219.00 94.88 84.88 35.81 45.99 53.22 64.42 418.43 SAFE 49.44 31.6 SAFE 10.96 SAFE

max 34.81 326.09 19.13 16.48 56.50 459.64 114.91 12.36 42.37 165.82 104.45 1.50 1.25 219.00 141.52 131.52 53.51 68.74 79.53 96.28 462.99
min -34.98 249.91 14.09 5.14 -55.46 383.46 95.87 3.86 4.90 112.98 57.55 1.20 1.00 181.50 88.68 78.68 27.84 35.76 41.38 50.09 322.00

# 000000Sensitivity: LNT Construction Internal Use


Design
Concrete grade 25
Steel grade 500

Clear cover 50 mm
fck 25 N/mm2
sst 500 N/mm2
Moment along Mx direction Moment along Mz direction
Projection proj 0.75 m 0.85
d provided dprov 332 mm 344.00 mm
Mu/bd 2
= 54x1E6 / ( 1000 x 332^2 ) = 69x1E6 / ( 1000 x 344^2 )
0.485508 0.58
Steel / m pt = ( 1 - SQRT ( 1 - 0.49 * 4 / (0.87x 25) ) ) x 100 x 25 = ( 1 - SQRT ( 1 - 0.58 * 4 / (0.87x 25) ) ) x 100 x 25
2 x 500 2 x 500
0.1142203 % 0.14 %
Minimum % of steel 0.12 % 0.12 %
Ast / m Ast = 0.12 x 1000 x 400/100 = 0.14 x 1000 x 344/100
480 mm 2
required 472.32 mm2 required
12 tor @ 200 c/c provided 565.48668 mm2 provided 12 tor @ 200 565.49 mm2 provided
0.170327 % Hence o.k 0.16 % Hence o.k

Shear Stress / m t = 80 x 1000 / (1000 x332) = 96 x 1000 / (1000 x344)


0.2395622 N/mm² 0.28 N/mm²
Shear Stress/m (allowable) 0.3079984 N/mm² 0.30 N/mm²
Punching shear stress = 463 x 1000
344 x 2 x ( 0.3 x 1000 + 0.5 x 1000 + 2 x 344 )
0.45 N/mm2 < allowable 1.25 Hence o.k

# 000000Sensitivity: LNT Construction Internal Use


Design of Isolated Footing -F1
e Mx
Founding level below FGL 1.00 Ds 1.75 m
Density of soil gs 18.00 kN/m3 d X
Allowable Net SBC 150.00 kN/m² Mz L
B (m) L (m) D(m) Weight (KN) Z
Column 0.30 0.50
Fdn 2.00 2.00 0.40 40.00
Soil filling 2.00 2.00 1.35 93.56

Total wt 133.56 kN B

Jt LOAD FORCE-X FORCE-Y FORCE-Z MOM-X MOM Z Total wt P/A Mxx/(L²B/6) Mzz/(B²L/6) Pmax Pmin Load SBC GBC pnet pdesign Mxu Mzu Vxu Vzu Punching SBC check Overturning check Sliding check

Factor Factor In x- direc In z-direc

53 201 DL+LL 20 252 -25 -14 -11 385.16 96.29 10.53 7.90 114.72 77.86 1.50 1.00 181.50 90.42 80.42 33.93 43.58 50.42 61.04 377.40 SAFE 36.58 27.43 SAFE 7.78 SAFE
202 DL+LL+SL+X 8 234 -25 -14 18 368.03 92.01 10.22 13.85 116.08 67.93 1.20 1.25 219.00 91.78 81.78 27.60 35.45 41.02 49.66 281.37 SAFE 19.93 27 SAFE 7.49 SAFE
203 DL+LL+SL-X 33 269 -25 -14 -40 402.28 100.57 10.84 29.65 141.06 60.08 1.20 1.25 219.00 116.76 106.76 36.03 46.28 53.55 64.83 322.47 SAFE 10.18 27.84 SAFE 6.18 SAFE
204 DL+LL+SL+Z 21 265 -22 -17 -12 398.43 99.61 12.69 8.68 120.98 78.24 1.20 1.25 219.00 96.68 86.68 29.25 37.57 43.48 52.63 317.85 SAFE 34.41 23.56 SAFE 8.98 SAFE
205 DL+LL+SL-Z 20 238 -27 -11 -9 371.89 92.97 8.38 7.11 108.46 77.48 1.20 1.25 219.00 84.16 74.16 25.03 32.15 37.20 45.03 286.00 SAFE 39.21 33.3 SAFE 6.81 SAFE
206 DL+SL+X 8 226 -24 -13 18 359.25 89.81 9.99 13.70 113.50 66.12 1.50 1.25 219.00 89.20 79.20 33.41 42.92 49.66 60.11 338.54 SAFE 19.68 26.97 SAFE 7.41 SAFE
207 DL+SL-X 33 260 -25 -14 -40 393.50 98.37 10.61 29.81 138.79 57.96 1.50 1.25 219.00 114.49 104.49 44.08 56.62 65.52 79.31 389.91 SAFE 9.91 27.82 SAFE 6.04 SAFE
208 DL+SL+Z 21 256 -22 -17 -12 389.64 97.41 12.46 8.84 118.71 76.11 1.50 1.25 219.00 94.41 84.41 35.61 45.74 52.92 64.06 384.13 SAFE 33.06 23.47 SAFE 8.9 SAFE
209 DL+SL-Z 20 230 -27 -11 -10 363.10 90.78 8.15 7.27 106.19 75.36 1.50 1.25 219.00 81.89 71.89 30.33 38.96 45.08 54.57 344.32 SAFE 37.46 33.44 SAFE 6.72 SAFE
210 DL+LL+WL+X 15 247 -25 -14 0 380.34 95.08 10.38 0.17 105.63 84.54 1.20 1.25 219.00 81.33 71.33 24.07 30.92 35.78 43.31 296.14 SAFE 1720.98 27.49 SAFE 7.73 SAFE
211 DL+LL+WL-X 25 256 -25 -14 -21 389.99 97.50 10.68 15.86 124.04 70.95 1.20 1.25 219.00 99.74 89.74 30.29 38.90 45.01 54.49 307.72 SAFE 18.45 27.38 SAFE 7.7 SAFE
212 DL+LL+WL+Z 20 253 -25 -14 -11 386.15 96.54 10.72 7.93 115.19 77.88 1.20 1.25 219.00 90.89 80.89 27.30 35.07 40.58 49.12 303.12 SAFE 36.52 27.01 SAFE 7.86 SAFE
213 DL+LL+WL-Z 20 250 -25 -13 -10 384.03 96.01 9.93 7.77 113.70 78.31 1.20 1.25 219.00 89.40 79.40 26.80 34.42 39.83 48.21 300.57 SAFE 37.09 29.02 SAFE 7.81 SAFE
214 DL+WL+X 15 238 -24 -14 0 371.55 92.89 10.15 0.01 103.05 82.73 1.50 1.25 219.00 78.75 68.75 29.00 37.25 43.10 52.18 356.99 SAFE 30962.42 27.46 SAFE 7.64 SAFE
215 DL+WL-X 25 248 -25 -14 -21 381.20 95.30 10.45 16.02 121.77 68.83 1.50 1.25 219.00 97.47 87.47 36.90 47.40 54.84 66.39 371.47 SAFE 17.85 27.36 SAFE 7.51 SAFE

216 DL+WL+Z 20 244 -24 -14 -11 377.37 94.34 10.49 8.09 112.92 75.76 1.50 1.25 219.00 88.62 78.62 33.17 42.60 49.30 59.67 365.72 SAFE 35 26.98 SAFE 7.78 SAFE
217 DL+WL-Z 20 242 -24 -13 -11 375.25 93.81 9.69 7.92 111.43 76.19 1.50 1.25 219.00 87.13 77.13 32.54 41.79 48.36 58.54 362.54 SAFE 35.52 29.04 SAFE 7.73 SAFE
54 201 DL+LL -20 270 -31 -17 12 403.31 100.83 13.08 8.77 122.67 78.99 1.50 1.00 181.50 98.37 88.37 37.28 47.89 55.41 67.07 404.64 SAFE 34.51 23.14 SAFE 6.5 SAFE
202 DL+LL+SL+X -33 287 -31 -18 41 420.49 105.12 13.52 30.54 149.18 61.07 1.20 1.25 219.00 124.88 114.88 38.77 49.80 57.62 69.75 344.32 SAFE 10.33 23.33 SAFE 6.41 SAFE
203 DL+LL+SL-X -8 253 -31 -17 -17 386.14 96.53 12.63 13.00 122.17 70.90 1.20 1.25 219.00 97.87 87.87 29.66 38.09 44.08 53.36 303.10 SAFE 22.27 22.93 SAFE 6.27 SAFE
204 DL+LL+SL+Z -20 281 -27 -20 11 414.70 103.68 15.22 8.02 126.92 80.43 1.20 1.25 219.00 102.62 92.62 31.26 40.15 46.46 56.24 337.38 SAFE 38.78 20.43 SAFE 7.6 SAFE
205 DL+LL+SL-Z -21 258 -35 -15 13 391.92 97.98 10.93 9.51 118.42 77.54 1.20 1.25 219.00 94.12 84.12 28.39 36.47 42.19 51.08 310.04 SAFE 30.91 26.9 SAFE 5.64 SAFE
206 DL+SL+X -33 278 -31 -18 40 411.21 102.80 13.31 30.37 146.48 59.13 1.50 1.25 219.00 122.18 112.18 47.32 60.79 70.33 85.14 416.48 SAFE 10.16 23.18 SAFE 6.28 SAFE
207 DL+SL-X -8 243 -31 -17 -18 376.85 94.21 12.42 13.17 119.80 68.63 1.50 1.25 219.00 95.50 85.50 36.07 46.33 53.61 64.90 364.95 SAFE 21.46 22.77 SAFE 6.17 SAFE
208 DL+SL+Z -20 272 -27 -20 10 405.42 101.35 15.01 7.85 124.22 78.49 1.50 1.25 219.00 99.92 89.92 37.93 48.72 56.38 68.25 407.80 SAFE 38.72 20.26 SAFE 7.5 SAFE
209 DL+SL-Z -21 249 -35 -14 12 382.64 95.66 10.71 9.34 115.72 75.60 1.50 1.25 219.00 91.42 81.42 34.35 44.12 51.05 61.80 373.63 SAFE 30.72 26.79 SAFE 5.54 SAFE
210 DL+LL+WL+X -26 275 -31 -18 22 408.16 102.04 13.24 16.73 132.01 72.07 1.20 1.25 219.00 107.71 97.71 32.98 42.36 49.01 59.33 329.53 SAFE 18.3 23.12 SAFE 6.55 SAFE
211 DL+LL+WL-X -15 265 -31 -17 1 398.47 99.62 12.86 0.69 113.17 86.07 1.20 1.25 219.00 88.87 78.87 26.62 34.19 39.56 47.89 317.89 SAFE 433.59 23.24 SAFE 6.46 SAFE
212 DL+LL+WL+Z -20 271 -31 -18 12 404.26 101.07 13.28 8.73 123.08 79.05 1.20 1.25 219.00 98.78 88.78 29.96 38.48 44.53 53.91 324.85 SAFE 34.72 22.84 SAFE 6.57 SAFE
213 DL+LL+WL-Z -20 269 -31 -17 12 402.47 100.62 12.47 8.85 121.94 79.30 1.20 1.25 219.00 97.64 87.64 29.58 37.99 43.96 53.21 322.69 SAFE 34.12 24.21 SAFE 6.49 SAFE
214 DL+WL+X -25 265 -31 -17 22 398.88 99.72 13.03 16.56 129.31 70.13 1.50 1.25 219.00 105.01 95.01 40.08 51.48 59.57 72.11 397.99 SAFE 18.07 22.97 SAFE 6.45 SAFE
215 DL+WL-X -15 256 -31 -17 1 389.18 97.30 12.65 0.52 110.46 84.13 1.50 1.25 219.00 86.16 76.16 32.13 41.27 47.75 57.81 383.44 SAFE 557.57 23.09 SAFE 6.37 SAFE
216 DL+WL+Z -20 261 -31 -17 11 394.98 98.74 13.06 8.57 120.37 77.12 1.50 1.25 219.00 96.07 86.07 36.31 46.64 53.97 65.33 392.13 SAFE 34.58 22.68 SAFE 6.47 SAFE
217 DL+WL-Z -20 260 -31 -16 12 393.18 98.30 12.25 8.68 119.23 77.36 1.50 1.25 219.00 94.93 84.93 35.83 46.02 53.25 64.47 389.44 SAFE 33.96 24.07 SAFE 6.39 SAFE

max 32.60 286.94 -21.90 -10.86 40.72 420.49 105.12 15.22 30.54 149.18 86.07 1.50 1.25 219.00 124.88 114.88 47.32 60.79 70.33 85.14 416.48
min -32.85 225.69 -34.80 -20.30 -39.74 359.25 89.81 8.15 0.01 103.05 57.96 1.20 1.00 181.50 78.75 68.75 24.07 30.92 35.78 43.31 281.37

# 000000Sensitivity: LNT Construction Internal Use


Design
Concrete grade M25
Steel grade Fe500

Clear cover 50.00 mm


fck 25.00 N/mm2
sst 500.00 N/mm2
Moment along Mx direction Moment along Mz direction
Projection proj 0.75 m 0.85
d provided dprov 332.00 mm 344.00 mm
Mu/bd 2
= 47x1E6 / ( 1000 x 332^2 ) = 61x1E6 / ( 1000 x 344^2 )
0.43 0.51
Steel / m pt = ( 1 - SQRT ( 1 - 0.43 * 4 / (0.87x 25) ) ) x 100 x 25 = ( 1 - SQRT ( 1 - 0.51 * 4 / (0.87x 25) ) ) x 100 x 25
2 x 500 2 x 500
0.10 % 0.12 %
Minimum % of steel 0.12 % 0.12 %
Ast / m Ast = 0.12 x 1000 x 400/100 = 0.12 x 1000 x 344/100
480.00 mm2 required 416.29 mm2 required
12 tor @ 200 c/c provided 565.49 mm2 provided 12 tor @ 200 565.49 mm2 provided
0.17 % Hence o.k 0.16 % Hence o.k

Shear Stress / m t = 70 x 1000 / (1000 x332) = 85 x 1000 / (1000 x344)


0.21 N/mm² 0.25 N/mm²
Shear Stress/m (allowable) 0.31 N/mm² 0.30 N/mm²
Punching shear stress = 416 x 1000
344 x 2 x ( 0.3 x 1000 + 0.5 x 1000 + 2 x 344 )
0.41 N/mm2 < allowable 1.25 Hence o.k

# 000000Sensitivity: LNT Construction Internal Use


L&T Construction
Water & Effluent Treatment IC- EDRC

PROJECT: DOCUMENT NO. DATE


Execution of 02 Nos. Individual Mega PWS to Boudh & Kandhamal District
including five years Operation & Maintenance under One Package LE21M985-C-WS-WT-DC-

DESIGNED CHECKED
TITLE: Design Calculation of Filter house
NR VP

15. DESIGN OF ISOLATED FOOTING - STAIRCASE


Typical Calculation

Based on the Support reactions from the STAAD analysis the design of footing is carried out
using Excel spreadsheet for all load combinations at all joints . A typical calculation with step
by step procedure is explained below for the easy understanding of the spreadsheet .

Design data e Mx
Water Table Height from bottom of footing = 0.0 m
Founding level below FGL Ds = 2.0 m L d X
Density of soil gs = 18.0 kN/m3 Mz
Allowable Net SBC = 250.0 kN/m² Z
B (m) L (m) D(m) Weight (KN)
Column 0.30 0.30
Foundation 1.30 1.30 0.30 12.68 B
Soil filling 1.50 1.50 1.70 66.10

Total wt 78.77 kN 66.096+12.675

Forces
Fx = 0.00 KN
Fy = 57.46 kN
FZ = 0.000 KN
Mx = 0.000 kN.m
Mz = 0.00 kN.m
Total weight = 136.23 kN
P/A = 136.23/(1.3*1.3)
= 80.61 kN/m²
Mxx/(L²B/6) = 0*6/(1.3^2*1.3)
= 0.00 kN/m²
Mzz/(B²L/6) = 0.00 kN/m²

Pmax P/A + Mxx/(L²B/6) +Mzz/(B²L/6) = 81 kN/m²


Pmin P/A - Mxx/(L²B/6) - Mzz/(B²L/6) = 80.6 kN/m²

Load factor = 1.5


Gross Bearing capacity = 250 x1+2*18
= 286 kN/m²
Pdesign = 80.61-(0.3*25)-1.7*18
42.51 kN/m²
Moment along Mx direction
Projection proj = 0.500 m (1.3-0.3)/2
Mxu = 42.51*0.5*0.5/2*1.5
= 7.97 kN.m
Moment along Mz direction
Projection proj = 0.500 m (1.3-0.3)/2
Mzu = 42.51*0.5*0.5/2*1.5
= 7.970625 kN.m
Effective depth in x direction = 235 mm
Effective depth in z direction = 245 mm
Shear force Vxu = 42.51*(0.5-(235/1000))*1.5
16.897725 kN
Shear force Vzu = 42.51*(0.5-(245/1000))*1.5
16.26
Punching Force Fy*1.5 = 86.1855 kN

000000Sensitivity: LNT Construction Internal Use


#
L&T Construction

Water & Effluent Treatment IC


Document No. LE21M985-C-WS-WT-DC-
Project Execution of 02 Nos. Individual Mega PWS to Boudh & Kandhamal District including five years Operation & Maintenance under One Package
Designed NR
Checked VP
Title Design Calculation of Filter house
Date 09/05/2024

DESIGN OF ISOLATED FOOTING -F1


e Mx
Founding level below FGL Ds 2.00 m
Density of soil gs 18.00 kN/m3 d X
Allowable Net SBC 250.00 kN/m² Mz L
B (m) L (m) D(m) Weight (KN) Z
Column Size 0.30 0.30
Fdn 1.30 1.30 0.30 12.68
Soil filling 1.50 1.50 1.70 66.10

Total wt 78.77 kN B

Jt LOAD FORCE-X FORCE-Y FORCE-Z MOM-X MOM Z Total wt P/A Mxx/(L²B/6) Mzz/(B²L/6) Pmax Pmin SBC GBC pnet pdesign Mxu Mzu Vxu Vzu Punching SBC check

Factor Factor

16 201 1.0 (DL+LL) 0 57 0 0 0 136.23 80.61 0.00 0.00 80.61 80.61 1.50 1.00 286.00 50.01 42.51 7.97 7.97 16.90 16.26 86.19 SAFE
202 1.0 (DL+SLX) -3 42 0 0 17 121.11 71.66 0.00 46.69 118.35 24.97 1.50 1.25 348.50 87.75 80.25 15.05 15.05 31.90 30.70 63.51 SAFE
203 1.0 (DL+SL-X) 3 42 0 0 -17 121.11 71.66 0.00 46.69 118.35 24.97 1.50 1.25 348.50 87.75 80.25 15.05 15.05 31.90 30.70 63.51 SAFE
204 1.0 (DL+SLZ) 0 42 -3 -17 0 121.11 71.66 46.69 0.00 118.35 24.97 1.50 1.25 348.50 87.75 80.25 15.05 15.05 31.90 30.70 63.51 SAFE
205 1.0 (DL+SL-Z) 0 42 3 17 0 121.11 71.66 46.69 0.00 118.35 24.97 1.50 1.25 348.50 87.75 80.25 15.05 15.05 31.90 30.70 63.51 SAFE
206 1.0(DL+LL+SLX) -3 57 0 0 17 136.23 80.61 0.00 46.69 127.30 33.92 1.50 1.25 348.50 96.70 89.20 16.72 16.72 35.46 34.12 86.19 SAFE
207 1.0(DL+LL+SL-X) 3 57 0 0 -17 136.23 80.61 0.00 46.69 127.30 33.92 1.50 1.25 348.50 96.70 89.20 16.72 16.72 35.46 34.12 86.19 SAFE
208 1.0(DL+LL+SLZ) 0 57 -3 -17 0 136.23 80.61 46.69 0.00 127.30 33.92 1.50 1.25 348.50 96.70 89.20 16.72 16.72 35.46 34.12 86.19 SAFE
209 1.0(DL+LL+SL-Z) 0 57 3 17 0 136.23 80.61 46.69 0.00 127.30 33.92 1.50 1.25 348.50 96.70 89.20 16.72 16.72 35.46 34.12 86.19 SAFE

max 3.12 57.46 3.12 17.10 17.10 136.23 80.61 46.69 46.69 127.30 80.61 1.50 1.25 348.50 96.70 89.20 16.72 16.72 35.46 34.12 86.19
min -3.12 42.34 -3.12 -17.10 -17.10 121.11 71.66 0.00 0.00 80.61 24.97 1.50 1.00 286.00 50.01 42.51 7.97 7.97 16.90 16.26 63.51

Design
Concrete grade M30
Steel grade Fe500

Clear cover 50.00 mm


fck 30.00 N/mm2
sst 500.00 N/mm2
Moment along Mx direction Moment along Mz direction
Projection proj 0.50 m 0.50
d provided dprov 235.00 mm 245.00 mm
Mu/bd2 = 17xE6 / ( 1000 x 235^2 ) = 17x1E6 / ( 1000 x 245^2 )
0.30 0.28
Steel / m pt = ( 1 - SQRT ( 1 - 0.30 * 4 / (0.87x 30) ) ) x 100 x 30 = ( 1 - SQRT ( 1 - 0.28 * 4 / (0.87x 30) ) ) x 100 x 30
2 x 500 2 x 500
0.07 % 0.06 %
Minimum % of steel 0.12 % 0.12 %
Ast / m Ast = 0.12 x 1000 x 300/100 = 0.12 x 1000 x 300/100
360.00 mm2 required 360.00 mm2 required
10 tor @ 200 c/c provided 392.70 mm2 provided 10 tor @ 200 392.70 mm2 provided
0.17 % Hence o.k 0.16 % Hence o.k

Shear Stress / m t = 35 x 1000 / (1000 x235) = 34 x 1000 / (1000 x245)

# 000000Sensitivity: LNT Construction Internal Use


L&T Construction

Water & Effluent Treatment IC


Document No. LE21M985-C-WS-WT-DC-
Project Execution of 02 Nos. Individual Mega PWS to Boudh & Kandhamal District including five years Operation & Maintenance under One Package
Designed NR
Checked VP
Title Design Calculation of Filter house
Date 09/05/2024
0.15 N/mm² 0.14 N/mm²
Shear Stress/m (allowable) 0.31 N/mm² 0.30 N/mm²
Punching shear stress = 86 x 1000
245 x 2 x ( 0.3 x 1000 + 0.3 x 1000 + 2 x 245 )
0.16 N/mm2 < allowable 1.37 Hence o.k

# 000000Sensitivity: LNT Construction Internal Use


Horizontal Vertical Horizontal Moment
Node L/C Fx kN Fy kN Fz kN Mx kN-m Mz kN-m
16 201 0.00 57.46 0.00 0.00 0
202 -3.12 42.34 0.00 0.00 17.096
203 3.12 42.34 0.00 0.00 -17.096
204 0.00 42.34 -3.12 -17.10 0
205 0.00 42.34 3.12 17.10 0
206 -3.12 57.46 0.00 0.00 17.096
207 3.12 57.46 0.00 0.00 -17.096
208 0.00 57.46 -3.12 -17.10 0
209 0.00 57.46 3.12 17.10 0

# 000000Sensitivity: LNT Construction Internal Use


Design of Isolated Footing -F5
e Mx
Founding level below FGL Ds 2.00 m
Density of soil gs 18.00 kN/m3 d X
Allowable Net SBC 100.00 kN/m² Mz L
B (m) L (m) D(m) Weight (KN) Z
Column 0.40 0.50
Fdn 2.60 2.60 0.40 67.60
Soil filling 2.60 2.60 1.60 188.93

Total wt 256.53 kN B

Jt LOAD FORCE-X FORCE-Y FORCE-Z MOM-X MOM Z Total wt P/A Mxx/(L²B/6)Mzz/(B²L/6) Pmax Pmin Load SBC GBC pnet pdesign Mxu Mzu Vxu Vzu Punching SBC check

FactorFactor
163 11 -31.68 489.61 -6.81 -1.49 12.78 746.14 110.38 0.51 4.36 115.25 105.51 1.50 1.00 136.00 86.45 76.45 63.21 69.37 82.33 86.69 734.42 SAFE
12 -55.86 469.94 -6.50 -1.08 89.58 726.47 107.47 0.37 30.58 138.41 76.52 1.20 1.25 161.00 109.61 99.61 65.89 72.32 85.83 90.37 563.93 SAFE
13 -7.51 509.28 -7.12 -1.91 -64.03 765.81 113.29 0.65 21.86 135.79 90.78 1.20 1.25 161.00 106.99 96.99 64.16 70.42 83.57 87.99 611.14 SAFE
14 -30.12 482.36 -62.99 -87.53 8.37 738.89 109.30 29.88 2.86 142.04 76.56 1.20 1.25 161.00 113.24 103.24 68.30 74.95 88.95 93.66 578.84 SAFE
15 -33.25 496.86 49.38 84.55 17.18 753.39 111.45 28.86 5.86 146.18 76.72 1.20 1.25 161.00 117.38 107.38 71.03 77.95 92.52 97.41 596.23 SAFE
16 -40.44 369.08 -4.54 -1.04 83.16 625.61 92.55 0.35 28.39 121.29 63.80 1.50 1.25 161.00 92.49 82.49 68.21 74.86 88.84 93.54 553.62 SAFE
17 7.91 408.43 -5.16 -1.87 -70.45 664.96 98.37 0.64 24.05 123.05 73.68 1.50 1.25 161.00 94.25 84.25 69.67 76.46 90.74 95.54 612.64 SAFE
18 -14.70 381.51 -61.03 -87.50 1.95 638.04 94.38 29.87 0.67 124.92 63.85 1.50 1.25 161.00 96.12 86.12 71.21 78.15 92.75 97.66 572.26 SAFE
19 -17.83 396.00 51.33 84.59 10.76 652.53 96.53 28.88 3.67 129.08 63.98 1.50 1.25 161.00 100.28 90.28 74.65 81.93 97.23 102.37 594.00 SAFE
20 -43.37 483.91 -5.95 -0.14 50.21 740.44 109.53 0.05 17.14 126.72 92.35 1.20 1.25 161.00 97.92 87.92 58.16 63.83 75.75 79.76 580.69 SAFE
21 -10.34 496.48 -7.53 -2.60 -28.91 753.01 111.39 0.89 9.87 122.15 100.63 1.20 1.25 161.00 93.35 83.35 55.13 60.51 71.81 75.61 595.77 SAFE
22 -30.30 485.49 -42.07 -54.85 8.62 742.02 109.77 18.73 2.94 131.44 88.10 1.20 1.25 161.00 102.64 92.64 61.28 67.25 79.82 84.04 582.59 SAFE
23 -32.86 492.98 29.41 50.33 16.49 749.51 110.87 17.18 5.63 133.69 88.06 1.20 1.25 161.00 104.89 94.89 62.77 68.89 81.75 86.08 591.58 SAFE
24 -27.95 383.05 -3.99 -0.10 43.79 639.58 94.61 0.03 14.95 109.59 79.63 1.50 1.25 161.00 80.79 70.79 58.54 64.25 76.25 80.28 574.58 SAFE
25 5.08 395.62 -5.57 -2.56 -35.33 652.15 96.47 0.87 12.06 109.41 83.54 1.50 1.25 161.00 80.61 70.61 58.38 64.08 76.04 80.07 593.43 SAFE
26 -14.88 384.64 -40.12 -54.82 2.20 641.16 94.85 18.71 0.75 114.31 75.38 1.50 1.25 161.00 85.51 75.51 62.44 68.53 81.33 85.63 576.95 SAFE
27 -17.44 392.13 31.37 50.37 10.07 648.65 95.95 17.19 3.44 116.59 75.32 1.50 1.25 161.00 87.79 77.79 64.32 70.59 83.78 88.21 588.19 SAFE
164 28 30.15 477.88 0.42 3.69 -10.01 734.41 108.64 1.26 3.42 113.32 103.96 1.50 1.00 136.00 84.52 74.52 61.62 67.62 80.25 84.50 716.82 SAFE
29 6.26 498.40 -0.70 1.59 66.67 754.92 111.68 0.54 22.76 134.98 88.37 1.20 1.25 161.00 106.18 96.18 63.62 69.83 82.87 87.25 598.08 SAFE
30 54.04 457.36 1.53 5.78 -86.69 713.89 105.60 1.97 29.59 137.17 74.04 1.20 1.25 161.00 108.37 98.37 65.07 71.42 84.76 89.24 548.83 SAFE
31 31.31 477.15 -26.19 -44.73 -14.20 733.68 108.53 15.27 4.85 128.65 88.41 1.20 1.25 161.00 99.85 89.85 59.44 65.23 77.41 81.51 572.58 SAFE
32 28.99 478.61 27.03 52.10 -5.82 735.14 108.75 17.78 1.99 128.52 88.98 1.20 1.25 161.00 99.72 89.72 59.35 65.14 77.30 81.39 574.33 SAFE
33 -8.57 405.85 -1.23 0.23 72.14 662.38 97.99 0.08 24.63 122.69 73.28 1.50 1.25 161.00 93.89 83.89 69.37 76.13 90.35 95.13 608.78 SAFE
34 39.20 364.81 1.00 4.42 -81.22 621.34 91.91 1.51 27.73 121.15 62.68 1.50 1.25 161.00 92.35 82.35 68.09 74.73 88.69 93.38 547.22 SAFE
35 16.48 384.60 -26.73 -46.09 -8.73 641.13 94.84 15.73 2.98 113.55 76.13 1.50 1.25 161.00 84.75 74.75 61.81 67.84 80.51 84.77 576.90 SAFE
36 14.15 386.06 26.49 50.74 -0.35 642.59 95.06 17.32 0.12 112.50 77.62 1.50 1.25 161.00 83.70 73.70 60.94 66.88 79.37 83.57 579.09 SAFE

000000Sensitivity: LNT Construction Internal Use


#
37 9.54 484.48 -1.23 0.74 29.56 741.01 109.62 0.25 10.09 119.96 99.27 1.20 1.25 161.00 91.16 81.16 53.69 58.92 69.93 73.63 581.37 SAFE
38 42.38 471.48 1.74 6.06 -49.47 728.01 107.69 2.07 16.89 126.65 88.74 1.20 1.25 161.00 97.85 87.85 58.11 63.78 75.69 79.70 565.77 SAFE
39 31.44 475.59 -12.19 -18.08 -13.97 732.12 108.30 6.17 4.77 119.24 97.36 1.20 1.25 161.00 90.44 80.44 53.21 58.40 69.31 72.98 570.71 SAFE
40 29.04 478.51 10.52 21.47 -6.33 735.04 108.73 7.33 2.16 118.22 99.24 1.20 1.25 161.00 89.42 79.42 52.54 57.66 68.43 72.05 574.21 SAFE
41 -5.30 391.93 -1.76 -0.62 35.03 648.46 95.93 0.21 11.96 108.10 83.75 1.50 1.25 161.00 79.30 69.30 57.30 62.89 74.63 78.58 587.90 SAFE
42 27.54 378.93 1.21 4.70 -43.99 635.46 94.00 1.60 15.02 110.62 77.38 1.50 1.25 161.00 81.82 71.82 59.39 65.18 77.35 81.45 568.40 SAFE
43 16.61 383.04 -12.73 -19.44 -8.49 639.57 94.61 6.64 2.90 104.15 85.08 1.50 1.25 161.00 75.35 65.35 54.03 59.30 70.38 74.10 574.56 SAFE
44 14.20 385.97 9.99 20.11 -0.86 642.49 95.04 6.86 0.29 102.20 87.89 1.50 1.25 161.00 73.40 63.40 52.42 57.54 68.28 71.90 578.95 SAFE

max 7.91 509.28 51.33 84.59 89.58 765.81 113.29 29.88 30.58 146.18 105.51 1.50 1.25 161.00 117.38 107.38 74.65 81.93 97.23 102.37 734.42
min -55.86 369.08 -62.99 -87.53 -70.45 625.61 92.55 0.03 0.67 109.41 63.80 1.20 1.00 136.00 80.61 70.61 55.13 60.51 71.81 75.61 553.62

Design
Concrete grade M25
Steel grade Fe415

Clear cover 50.00 mm


fck 25.00 N/mm2
sst 415.00 N/mm2
Moment along Mx direction Moment along Mz direction
Projection proj 1.05 m 1.10
d provided dprov 332.00 mm 344.00 mm
Mu/bd2 = 75x1E6 / ( 1000 x 332^2 ) = 82x1E6 / ( 1000 x 344^2 )
0.68 0.69
Steel / m pt = ( 1 - SQRT ( 1 - 0.68 * 4 / (0.87x 25) ) ) x 100 x 25 = ( 1 - SQRT ( 1 - 0.69 * 4 / (0.87x 25) ) ) x 100 x 25
2 x 415 2 x 415
0.19 % 0.20 %
Minimum % of steel 0.12 % 0.12 %
Ast / m Ast = 0.19 x 1000 x 332/100 = 0.20 x 1000 x 344/100
643.44 mm2 required 682.07 mm2 required
12 tor @ 150 c/c provided 753.98 mm2 provided 12 tor @ 150 753.98 mm2 provided
0.23 % Hence o.k 0.22 % Hence o.k

Shear Stress / m t = 97 x 1000 / (1000 x332) = 102 x 1000 / (1000 x344)


0.29 N/mm² 0.30 N/mm²
Shear Stress/m (allowable) 0.35 N/mm² 0.34 N/mm²
Punching shear stress = 734 x 1000
344 x 2 x ( 0.4 x 1000 + 0.5 x 1000 + 2 x 344 )

000000Sensitivity: LNT Construction Internal Use


#
0.67 N/mm2 < allowable 1.25 Hence o.k

000000Sensitivity: LNT Construction Internal Use


#
Sheet 48 of 33

LARSEN & TOUBRO LIMITED


ECC Division – EDRC BILL OF QUANTITIES
JOB NO SHEET
PROJECT. #REF!

REV. NO. DATE


DOC NO #REF! 09/05/2024
CALCULATED CHECKED
PARTICULARS #REF!
#REF! #REF!
Dimensions
Numbers Contents
Sl No. Description of Work Height / Total
No Length Breadth or area
Depth

1 PCC
F1 #REF! #REF! #REF! #REF! m2
F2 #REF! #REF! #REF! #REF! m2
F3 #REF! #REF! #REF! #REF! m2
F4 #REF! #REF! #REF! #REF! m2
F5 #REF! #REF! #REF! #REF! m2
F6 #REF! #REF! #REF! #REF! m2
Raft 0 #REF! 0.000 #REF! m2
#REF! m2
1 Reinforced Concrete
Raft 3.1416 #REF! #REF! #REF! m2
F1 #REF! #REF! #REF! #REF! m2
F2 #REF! #REF! #REF! #REF! m2
F3 #REF! 16.756 #REF! #REF! m2
F4 #REF! #REF! #REF! #REF! m2
F5 #REF! #REF! #REF! #REF! m2
F6 #REF! #REF! #REF! #REF! m2
Columns : Inner #REF! #REF! #REF! #REF! m2
Outer #REF! #REF! #REF! #REF! m2
Bracings (periphery, tie level / plinth level ): #REF! #REF! #REF! #REF! m2
Orthogonal Bracing : ( tie level / plinth level) #REF! #REF! #REF! #REF! m2
Bottom ring Beam #REF! #REF! #REF! #REF! m2
Orthogonal beam ( base level) - Side Face (web) 1 #REF! #REF! #REF! m2
Cover slab level beam - side face (web) 1 #REF! #REF! #REF! m2
Balcony 3.1416 #REF! #REF! #REF! m2
Side wall 6.2832 #REF! #REF! #REF! m2
Submerged columns #REF! #REF! #REF! #REF! m2
Base slab- Bottom 0.7854 #REF! #REF! #REF! m2
Base Slab - Sides 3.1416 #REF! #REF! #REF! m2
Cover slab 0.7854 #REF! #REF! #REF! m2

Stair case column #REF! #REF! #REF! #REF! m2


Footing #REF! #REF! #REF! #REF! m2
Staircase Slab along with sides + bottom of TB1 #REF! #REF! #REF! #REF! m2
TB1 (Side face of web) #REF! #REF! #REF! #REF! m2
TB2 #REF! #REF! #REF! #REF! m2
Steps -Sides #REF! 0.500 #REF! #REF! #REF! m2
Steps -Front #REF! #REF! #REF! #REF! m2
Valve Chamber Wall 1/350 #REF! #REF! #REF! m2
9/400 #REF! #REF! #REF! m2
18/450 #REF! #REF! #REF! m2
Base Slab #REF! #REF! #REF! m2

000000Sensitivity: LNT Construction Internal Use


#
Sheet 49 of 33

LARSEN & TOUBRO LIMITED


ECC Division – EDRC BILL OF QUANTITIES
JOB NO SHEET
PROJECT. #REF!

REV. NO. DATE


DOC NO #REF! 09/05/2024
CALCULATED CHECKED
PARTICULARS #REF!
#REF! #REF!
Dimensions
Numbers Contents
Sl No. Description of Work Height / Total
No Length Breadth or area
Depth
TOTAL = #REF!
TENDER = 2818

000000Sensitivity: LNT Construction Internal Use


#
50

LARSEN & TOUBRO LIMITED


ECC Division – EDRC BILL OF QUANTITIES
JOB NO SHEET
PROJECT. #REF!
REV. NO. DATE
DOC NO #REF!
09-05-2024
CALCULATED CHECKED
PARTICULARS #REF!
#REF! #REF!

Dia of bar Nos. per Cut length Weight /


Sl No. Description of Work Bar nos. Nos. Net length in m Total Weight (kg) Total
in mm Member in m Metre

### Footing TOP Dir 1 #REF! ### #REF! #REF! #REF! #REF! #REF! kg
BOT Dir 2 #REF! ### #REF! #REF! #REF! #REF! #REF! kg

### Footing TOP Dir 1 #REF! ### #REF! #REF! #REF! #REF! #REF! kg
BOT Dir 2 #REF! ### #REF! #REF! #REF! #REF! #REF! kg

### Footing TOP Dir 1 8 4 26 3 312.00 0.394 123.0 kg


BOT Dir 2 12 4 18 2.25 162.00 0.887 143.8 kg

### Combined footing


TOP -X Dir 1 12 ### 24 4.736 #REF! 0.887 21.3 kg
BOT -X Dir 2 12 ### 20 4.736 #REF! 0.887 17.7 kg
TOP -Y Dir 1 10 ### 24 3 #REF! 0.616 14.8 kg
BOT -Y Dir 2 10 ### 24 3 #REF! 0.616 14.8 kg

### Combined footing


TOP -X Dir 1 0 ### #REF! #REF! #REF! 0.000 #REF! kg
BOT -X Dir 2 0 ### #REF! #REF! #REF! 0.000 #REF! kg
TOP -Y Dir 1 0 ### #REF! #REF! #REF! 0.000 #REF! kg
BOT -Y Dir 2 0 ### #REF! #REF! #REF! 0.000 #REF! kg

Raft column strip - Top Y12 0 #REF! #REF! #REF! 0.887 #REF! kg
Bottom Y20 0 #REF! #REF! #REF! 2.465 #REF! kg

Raft middle strip - Top Y12 0 #REF! #REF! #REF! 0.887 #REF! kg
Bottom Y16 0 #REF! #REF! #REF! 1.578 #REF! kg

Shear links Y0 0 #REF! 0.000 0.0 kg

Outer Cloumns Bar 1 Y20 ### 7 #REF! #REF! 2.465 #REF! kg


Bar 2 #REF! ### #REF! #REF! #REF! #REF! #REF! kg
Special Z Y0 ### #REF! #REF! #REF! 0.000 #REF! kg
Other Z #REF! ### #REF! #REF! #REF! #REF! #REF! kg

Inner Cloumns Bar 1 Y20 ### 7 #REF! #REF! 2.465 #REF! kg


Bar 2 #REF! ### #REF! #REF! #REF! #REF! #REF! kg

Stirrup 2 #REF! ### #REF! #REF! #REF! #REF! #REF! kg


### #REF! Top 1: Y25 1 2 #REF! #REF! 3.851 #REF! kg
Curtail Top 2: #REF! 1 #REF! #REF! #REF! #REF! #REF! kg
Bottom 1: Y25 1 2 #REF! #REF! 3.851 #REF! kg
Bottom 2: Y12 1 1 #REF! #REF! 0.887 #REF! kg

Normal Ties #REF! 1 #REF! #REF! #REF! #REF! #REF! kg


### #REF! Top 1: Y25 4 3 #REF! #REF! 3.851 #REF! kg
Curtail Top 2: Y12 4 2 #REF! #REF! 0.887 #REF! kg
Bottom 1: Y25 4 3 #REF! #REF! 3.851 #REF! kg
Bottom 2: #REF! 4 2 #REF! #REF! #REF! #REF! kg

Normal #REF! 4 #REF! #REF! #REF! #REF! #REF! kg

Plinth Beams #REF! Top 1: Y25 1 2 #REF! #REF! 3.851 #REF! kg


Curtail Top 2: Y12 1 1 #REF! #REF! 0.887 #REF! kg
Bottom 1: Y25 1 2 #REF! #REF! 3.851 #REF! kg
Bottom 2: Y12 1 1 #REF! #REF! 0.887 #REF! kg

Normal Ties #REF! 1 #REF! #REF! #REF! #REF! #REF! kg

### #REF! Top 1: Y25 4 3 #REF! #REF! 3.851 #REF! kg


Curtail Top 2: Y12 4 2 #REF! #REF! 0.887 #REF! kg
Bottom 1: Y25 4 3 #REF! #REF! 3.851 #REF! kg
Bottom 2: Y12 4 2 #REF! #REF! 0.887 #REF! kg

Normal Ties #REF! 4 #REF! #REF! #REF! #REF! #REF! kg

# 000000Sensitivity: LNT Construction Internal Use


51

LARSEN & TOUBRO LIMITED


ECC Division – EDRC BILL OF QUANTITIES
JOB NO SHEET
PROJECT. #REF!
REV. NO. DATE
DOC NO #REF!
09-05-2024
CALCULATED CHECKED
PARTICULARS #REF!
#REF! #REF!

Dia of bar Nos. per Cut length Weight /


Sl No. Description of Work Bar nos. Nos. Net length in m Total Weight (kg) Total
in mm Member in m Metre

Base Slab Beam Top 1: #REF! 1 #REF! #REF! #REF! #REF! #REF! kg
Curtail Top 2: #REF! 1 #REF! #REF! #REF! #REF! #REF! kg
Bottom 1: #REF! 1 #REF! #REF! #REF! #REF! #REF! kg
Bottom 2: #REF! 1 #REF! #REF! #REF! #REF! #REF! kg
Ties #REF! 1 #REF! #REF! #REF! #REF! #REF! kg
Side face bar Y12 1 0 #REF! #REF! 0.887 #REF! kg
Base Slab Top-X #REF! 1 1040.91 #REF! #REF! kg
Top-Y #REF! 1 1040.91 #REF! #REF! kg
Bottom-X #REF! 1 1427.21 #REF! #REF! kg
Bottom-Y #REF! 1 1427.21 #REF! #REF! kg

Ring Beam Top 1: #REF! 1 #REF! #REF! #REF! #REF! #REF! kg


Top 2: #REF! 1 #REF! #REF! #REF! #REF! #REF! kg
Bottom 1: #REF! 1 #REF! #REF! #REF! #REF! #REF! kg
Bottom 2: #REF! 1 #REF! #REF! #REF! #REF! #REF! kg
Ties #REF! 1 #REF! #REF! #REF! #REF! #REF! kg
Side face bar Y12 1 0 #REF! #REF! 0.887 #REF! kg
Balcony Projection Main Bar #REF! 1 #REF! #REF! #REF! #REF! #REF! kg
Dist. Bar #REF! 1 #REF! #REF! #REF! #REF! #REF! kg
Tank Wall : Vertical: - Full #REF! 1 #REF! #REF! #REF! #REF! #REF! kg
Alternate Curtail #REF! #REF! 1 #REF! #REF! #REF! #REF! #REF! kg
Vertical free face #REF! 1 #REF! #REF! #REF! #REF! #REF! kg
Horizontal Zone 1: #REF! #REF! 2 #REF! #REF! #REF! #REF! #REF! kg
Zone 2: #REF! #REF! 2 #REF! #REF! #REF! #REF! #REF! kg
Zone 3: #REF! #REF! 2 #REF! #REF! #REF! #REF! #REF! kg
Zone 4: 0 2 0 #REF! #REF! 0.000 #REF! kg
Total = #REF!
Submerged Column Bar 1: #REF! ### #REF! #REF! #REF! #REF! #REF! kg
Bar 2: #REF! ### #REF! #REF! #REF! #REF! #REF! kg
Ties #REF! ### #REF! #REF! #REF! #REF! #REF! kg
Cover Slab Beam Top 1: #REF! 1 #REF! #REF! #REF! #REF! #REF! kg
Curtail Top 2: #REF! 1 #REF! #REF! #REF! #REF! #REF! kg
Bottom 1: #REF! 1 #REF! #REF! #REF! #REF! #REF! kg
Bottom 2: #REF! 1 #REF! #REF! #REF! #REF! #REF! kg
Stirrups #REF! 1 #REF! #REF! #REF! #REF! #REF! kg
Cover Slab Top-X #REF! 1 1203.62 #REF! #REF! kg
Top-Y #REF! 1 1203.62 #REF! #REF! kg
Bottom-X #REF! 1 1017.66 #REF! #REF! kg
Bottom-Y #REF! 1 1017.66 #REF! #REF! kg
Valve Chamber Cover Slab Bottom Y0 ### 3 #REF! #REF! 0.000 #REF! kg
Base slab Bottom Long Y0 1 #REF! #REF! #REF! 0.000 #REF! kg
Bottom Short Y0 1 #REF! #REF! #REF! 0.000 #REF! kg
Top Long Y0 1 #REF! #REF! #REF! 0.000 #REF! kg
Top Short Y0 1 #REF! #REF! #REF! 0.000 #REF! kg
Bottom Long Y0 1 #REF! #REF! #REF! 0.000 #REF! kg
Bottom Short Y0 1 #REF! #REF! #REF! 0.000 #REF! kg
Top Long Y0 1 #REF! #REF! #REF! 0.000 #REF! kg
Top Short Y0 1 #REF! #REF! #REF! 0.000 #REF! kg
Bottom Long Y0 1 #REF! #REF! #REF! 0.000 #REF! kg
Bottom Short Y0 1 #REF! #REF! #REF! 0.000 #REF! kg
Top Long Y0 1 #REF! #REF! #REF! 0.000 #REF! kg
Top Short Y0 1 #REF! #REF! #REF! 0.000 #REF! kg
Wall Vertical Y0 2 #REF! #REF! #REF! 0.000 #REF! kg
Horizontal Y0 1 #REF! #REF! #REF! 0.000 #REF! kg
Y0 2 #REF! #REF! #REF! 0.000 #REF! kg
Y0 1 #REF! #REF! #REF! 0.000 #REF! kg
Y0 2 #REF! #REF! #REF! 0.000 #REF! kg
Y0 1 #REF! #REF! #REF! 0.000 #REF! kg
Stair case
Stair case column Y25 ### 8 #REF! #REF! 3.851 #REF! kg
Y12 ### 4 #REF! #REF! 0.887 #REF! kg
Y8 ### #REF! #REF! #REF! 0.394 #REF! kg
Stair case Footing Dir 1 16 2 25 5.25 262.50 1.578 39.4 kg
Dir 2 12 2 20 5.25 210.00 0.887 17.7 kg
Dir 1 12 2 26 3 156.00 0.887 23.1 kg
Dir 2 12 2 26 3 156.00 0.887 23.1 kg

# 000000Sensitivity: LNT Construction Internal Use


52

LARSEN & TOUBRO LIMITED


ECC Division – EDRC BILL OF QUANTITIES
JOB NO SHEET
PROJECT. #REF!
REV. NO. DATE
DOC NO #REF!
09-05-2024
CALCULATED CHECKED
PARTICULARS #REF!
#REF! #REF!

Dia of bar Nos. per Cut length Weight /


Sl No. Description of Work Bar nos. Nos. Net length in m Total Weight (kg) Total
in mm Member in m Metre

Stair case Beam ( short) Y25 ### 3 2.450 #REF! 3.851 #REF! kg
Y12 ### 2 2.450 #REF! 0.887 #REF! kg
Y16 ### 2 2.450 #REF! 1.578 #REF! kg
Y12 ### 1 2.450 #REF! 0.887 #REF! kg
Y8 ### 18 #REF! #REF! 0.394 #REF! kg
Stair case Beam (long) Y16 ### 3 4.500 #REF! 1.578 #REF! kg
Y0 ### 1 4.500 #REF! 0.000 #REF! kg
Y16 ### 2 4.500 #REF! 1.578 #REF! kg
Y12 ### 1 4.500 #REF! 0.887 #REF! kg
Y8 ### 41 #REF! #REF! 0.394 #REF! kg
Landing slab Y12 ### #REF! #REF! #REF! 0.887 #REF! kg
Y8 ### #REF! #REF! #REF! 0.394 #REF! kg
Waist slab Y12 ### #REF! #REF! #REF! 0.887 #REF! kg
Y8 ### #REF! #REF! #REF! 0.394 #REF! kg
#REF! kg
TOTAL = #REF! MT
TENDER = 70 MT

# 000000Sensitivity: LNT Construction Internal Use


L&T Construction
Water & Effluent Treatment IC

Project #REF! #REF!


5/9/2024
Designed Checked
Structure #REF!
#REF! #REF!

Capacity of Tank = #REF! m3


Height of staging = #REF! m
Internal Diameter = #REF! m
Height of tank ( liquid depth ) = #REF! m
Free board = #REF! m
Depth of foundation = 3 m
vertical spacing of column = 4.4 m
No. of Bracing levels = 4 Nos.
Numeration and RC INPUT

1 Cover slab Thickness = #REF! mm


Top reinforcement #REF! dia @ #REF! mm c/c
Bottom reinforcement #REF! dia @ #REF! mm c/c

2 Cover slab beam #REF! x #REF!


Top reinforcement #REF! Nos #REF! dia
#REF! Nos #REF! dia
Bottom reinforcement #REF! Nos #REF! dia
#REF! Nos #REF! dia
Stirrups #REF!

3 Internal column Circular of Diameter = #REF! mm


#REF! Nos #REF! dia
#REF! Nos #REF! dia
#REF!

4 Tank wall Thickness = #REF! mm Bottom


Vertical reinforcement Water face: #REF! mm Top

#REF!

Vertical reinforcement Free face:

#REF!
Horizontal reinforcement :
TOP Zone 1: #REF! m #REF! @ #REF! c/c
Zone 2: #REF! m #REF! @ #REF! c/c
Zone 3: #REF! m #REF! @ #REF! c/c
BOTTOM Zone 4: 0 m 0 @ 0 c/c

000000Sensitivity: LNT Construction Internal Use


#
5 Base slab Thickness = #REF! mm
Top reinforcement #REF! @ #REF! mm c/c
Bottom reinforcement #REF! @ #REF! mm c/c

6 Base slab beam #REF! x #REF!


Top reinforcement #REF! Nos #REF! dia
#REF! Nos #REF! dia
Bottom reinforcement #REF! Nos #REF! dia
#REF! Nos #REF! dia
Stirrups #REF!

7 Ring beam
Size: #REF! X #REF!
Top reinforcement: #REF!
Bottom reinforcement: #REF!
#REF!

8 Balcony Thickness = #REF! mm


#REF! mm wide
Top reinforcement #REF! @ #REF! c/c
Distribution steel #REF! @ #REF! c/c

9 Columns
A Outer columns : Diameter = #REF! mm
Reinforcement #REF! Nos #REF! dia
#REF! Nos #REF! dia
Stirrups #REF!
#REF!
Special confined zone length = #REF! mm

B Inner columns : Diameter = #REF! mm


Reinforcement #REF! Nos #REF! dia
#REF! Nos #REF! dia
Stirrups #REF!
#REF!
Special confined zone length = #REF! mm

10 Tie beams and Plinth beams stirrups

#REF! #REF! #REF! Top reinforcement #REF! #REF!


Bottom reinforcement #REF!

#REF! #REF! Top reinforcement #REF! #REF!


Bottom reinforcement #REF!

#REF! #REF! #REF! Top reinforcement #REF! #REF!

000000Sensitivity: LNT Construction Internal Use


#
Bottom reinforcement #REF!

000000Sensitivity: LNT Construction Internal Use


#
#REF! #REF! Top reinforcement #REF! #REF!
Bottom reinforcement #REF!

#REF! #REF! #REF! Top reinforcement #REF! #REF!


Bottom reinforcement #REF!

#REF! #REF! Top reinforcement #REF! #REF!


Bottom reinforcement #REF!
#REF! #REF! #REF! Top reinforcement #REF! #REF!
Bottom reinforcement #REF!

#REF! #REF! Top reinforcement #REF! #REF!


Bottom reinforcement #REF!

#REF! #REF! #REF! Top reinforcement #REF! #REF!


Bottom reinforcement #REF!

#REF! #REF! Top reinforcement #REF! #REF!


Bottom reinforcement #REF!
Ductile details = Length of zone from face of column = 670 mm
Spacing of stirrup = Y8 @ 80 mm c/c

Note : TB1 & PB1 are the peripheral beams at respective brace levels
TB2 & PB2 are orthogonal beams at respective brace levels

11 Footing L B D
Size: #REF! #REF! #REF!
Bottom Top
Reinf. Dia #REF! mm #REF! mm
Spacing = #REF! mm c/c #REF! mm c/c
12 Staircase
Landing Width = 1000 mm thk = 225 mm
Slab reinf. Y12 @ 175 Dis. Y8 @ 175
Beam size = 250 x 350
column size = 350 x 350
Beam reinf Long Beam Top 3-Y20 Stirrup Y8 @ 120mmc/c
Bottom 3-Y20
Short Beam Top 2-Y25 & 1-Y20 Stirrup Y8 @ 120mmc/c
Bottom 2-Y25 & 1-Y12
Column Reinf. Dia 16 Ties Y8 @ 190mmc/c
No. of bars 8
Footing L B D Y16 @ 120mmc/c X-direction
#REF! #REF! #REF! Y16 @ 150mmc/c Z-direction
13 Combined footing: CF-1
Top- in long Bot- in Top- in Bot- in
Size L B D dire long dire short dire short dire

000000Sensitivity: LNT Construction Internal Use


#
#REF! #REF! #REF! Y12@150 Y20@130 Y12@150 Y20@130

000000Sensitivity: LNT Construction Internal Use


#

You might also like