This document is the property of Larsen & Toubro Limited, ECC Division - EDRC and must not be passed

on to any third person or firm not authorised by us, nor be copied/made use of in full or part by such person or firm without

Revised as per Consultant comment letter no. 9235 dated on 29-10-


23.11.2022 B
2022 and resubmitted for approval
NR VP SMI
NR VP SMI
27.09.2022 A FOR APPROVAL
NR VP SMI
DATE REV. NO. DESCRIPTION Designed Checked Approved
REVISIONS

L&T Construction
Water & Effluent Treatment IC - EDRC

CLIENT : CONSULTANT :

RWSS ORGANIZATION
(GOVT. OF ODISHA.)
PROJECT :
EXECUTION OF 02 NOS. INDIVIDUAL MEGA PWS TO BOUDH & KANDHAMAL DISTRICT INCLUDING FIVE YEARS OPERATION &
MAINTENANCE UNDER ONE PACKAGE
our prior permission writing

SUPPLIER / CONTRACTOR:
L&T Construction, Water & Effluent Treatment
JOB No. LE21M985

TOTAL NO. OF PAGES TITLE :


NAME SIGN DATE
DSGN NR NR 23/09/22
DESIGN CALCULATIONS OF FILTER HOUSE
CHKD VP VP 26/09/22
AT HARBANGA
APPD SMI SMI 27/09/22
CODE REV.

DOC. No. L E 2 1 M 9 8 5 - C - W S - W T - D C - 4 0 2 7
IS B

RELEASED FOR PRELIMINARY TENDER INFORMATION P APPROVAL CONSTRUCTION

# Sensitivity: LNT Construction Internal Use


PROJECT: Barmer Lift water Supply Project SPR-1

STRUCTURE: Butterfly Valve Chamber

0.6
A
0.175
0.525 B 0.6 0.7

C 1 0.7

1.2 0.7
D
4.027
1.65 0.7
E

2.2 0.7
F
0.702

G
2.85

Height Height Pressure at Pressure at Force Force due Weight of


Points from top from top Base base due to base due to due to to masonry & Restoring Over turning
between of wall of soil width surcharge soil soil surcharge soil( KN) Moments Moments
A &B 0.7 0.525 0.6 0.525 4.027 24.162 3.33 3.15 0.827 1.748 0.145 0.459 9.891 0.300 2.967 2.575
B& C 0.7 0.7 1 1.225 4.027 24.162 3.33 7.35 4.502 4.079 1.838 2.499 20.265 0.500 13.100 8.581
C&D 0.7 0.7 1.2 1.925 4.027 24.162 3.33 11.55 11.117 6.410 7.133 6.170 22.302 0.600 26.481 17.527
D&E 0.7 0.7 1.65 2.625 4.027 24.162 3.33 15.75 20.672 8.741 18.088 11.473 32.870 0.825 53.599 29.413
E&F 0.7 0.7 2.2 3.325 4.027 24.162 3.33 19.95 33.167 11.072 36.760 18.408 43.197 1.100 101.116 44.239
F &G 0.702 0.702 2.85 4.027 4.027 24.162 3.33 24.162 48.650 13.410 65.305 27.001 55.306 1.425 179.927 62.060

Sensitivity: LNT Construction Internal Use


#
Factor of Moment (M) Compressive tmax= tmin=
safety KN m laod (P) KN (P/A) (M/Z) (P/A)+(M/Z) (P/A)-(M/Z)
1.152 0.604 9.891 0.016 0.010 0.027 0.006
1.527 4.337 30.156 0.030 0.026 0.056 0.004
1.511 13.303 52.458 0.044 0.055 0.099 -0.012
1.822 29.561 85.328 0.052 0.065 0.117 -0.013
2.286 55.168 128.525 0.058 0.068 0.127 -0.010
2.899 92.306 183.832 0.065 0.068 0.133 -0.004

Sensitivity: LNT Construction Internal Use


#
PROJECT: Barmer Lift water Supply Project SPR-1

STRUCTURE: Valve Chamber

0.125 0.6
A
0.7
0.525000000000001 B 0.6 0.7

0.7
C 1 0.7

0.675
D 1.2 0.675
E
0.1

1.2 0.1

1.527
1.2 1.527
F
0.1 G 0.1
0.4 H
P
2.85

Height Height Pressure at Pressure at Force Force due Weight of tmax=


Points from top from top Base base due to base due to due to to masonry & Distance from Restoring Over turning Moment (M) Compressive (P/A)+ tmin=
between of wall of soil width surcharge soil soil surcharge soil Point P Moments Moments KN m laod (P) KN (P/A) (M/Z) (M/Z) (P/A)-(M/Z)
A &B 0.7 0.525 0.6 3.33 3.15 0.827 1.748 9.891 0.300 2.967 0.604 0.604 9.891 0.016 0.010 0.027 0.006
B& C 0.7 0.7 1 3.33 7.35 4.502 4.079 20.265 0.500 13.100 4.337 4.337 30.156 0.030 0.026 0.056 0.004
C&D 0.675 0.675 1.2 3.33 11.4 10.830 6.327 21.596 0.600 26.057 12.870 12.870 51.752 0.043 0.054 0.097 -0.010
D&E 0.1 0.1 1.2 3.33 12 12.000 6.660 2.880 0.600 27.785 14.660 14.660 78.632 0.066 0.066 0.066
E&F 1.527 1.527 1.2 3.33 21.162 37.319 11.745 23.000 1.825 69.760 64.587 64.587 101.632 0.085 0.085 0.085
F &G 0.1 0.1 2.85 3.33 21.762 39.465 12.078 6.840 1.425 79.507 69.617 69.617 108.471 0.038 0.038 0.038
G& H 0.4 0.4 2.85 3.33 24.162 48.650 13.410 26.847 1.425 117.764 92.306 92.306 135.318 0.047 0.068 0.116 -0.021
4.202 4.027
0.125

Sensitivity: LNT Construction Internal Use


#