DOC NO.

: ANG/IMS/QMS-005/R-1
Page 1 of 2
CONCRETE POUR CARD

Project Site: - URVISHA (Newtown) Pour Card No:


Contractor’s Name & W.O. No: S. M. NIRMAN (1600002736) Date of Casting:

Location of work: -

Drawing No.: - Drg. Rev. No.:

Level: -

Concrete Details:
Grade of Concrete: Average Concrete Temperature: ºC
Volume of concrete: Average Ambient Temperature: ºC
Concrete Mix Proportion: RMC W/C Ratio:

Coarse Aggregate Source: Fine Aggregate Brand/Grade of Cement: Brand of


Source: Admixture:
Water
(litre/m3)
10 mm Chips 20 mm Chips Sand Cement Admixture
(kg/m3) (kg/m3) (kg/m3) (Kg/m3) (litre/m3)

Supply of concrete by: Ambuja Neotia/Procured RMC*/Contractor


* Above table need not be filled if supplied by RMC
*In case concrete supplied by RMC, mention the name of the RMC Suppliers:
* Mix Design No.
Cement Consumption for Slurry:
Pour Details:
Date of Pour: Weather Condition:

Starting time of Pouring: Method of Pouring:

Closing time of Pouring: Method of Mixing:

No of Cube to be taken:

Avg. Slump Value:

Lowest Slump value: Highest Slump Value:


(Flow Table Value in case of SCC) (Flow Table Value in case of SCC)

Extra Reinforcement (if any):


No. of Laps: Dia/Nos of Dowels:

No’s /Dia of Chair Bar: Length of Chair:

Shape of Chair:

Cover Block: (Yes/No)


DOC NO.: ANG/IMS/QMS-005/R-1
Project: URVISHA (Newtown) Page 2 of 2

CONCRETE POUR CARD

Check list attached: (Yes/No)

Form work Reinforcement Work Concreting Work


(Yes/No) (Yes/No) (Yes/No)
Ref. Checklist: Ref. Checklist: Ref. Checklist:
ANG/IMS/QMS-006 ANG/IMS/QMS-008 ANG/IMS/QMS-007

Electrical Work

Conduit Placement (if any)

EIC (Civil) EIC (Electrical) Contractor’s representative


(As applicable)

Date: Date: Date:

Quality Control Engineer


(As applicable)

Date:

Nomenclature: EIC = Engineer-in-Charge