You are on page 1of 19

CV-PORTFOLIO

NOTE:

No portion of this document may be reproduced in any form or by any

means. It is strictly forbidden to disclose or copy this portfolio.

Some of these images in this portfolio may be subjected to copyright.


Name: Mihai CIBOTARU

Date of birth: August 1987, the 31st

Language skills English-fluent


French-beginner
German-beginner
Romania-native

Contact: tel: +40745400210


Email: cibotaru.mihai.alexandru@gmail.com

Education/qualifications

2006-2010 Bachelor’s degree – Civil Engineering,” Gheorghe Asachi” Technical University,

Faculty of Civil Engineering and Building Services, Iasi (Romania)

2010-2012 Master’s degree- Structural Engineering,” Gheorghe Asachi” Technical University,

Faculty of Civil Engineering and Building Services, Iasi (Romania)

Erasmus scholarship for one semester in Konstanz, Germany.

Specialty knowledge:

Structural design and detailing for civil and industrial buildings

Software:
• proficient with Revit-Autodesk certification
• proficient with Robot Structural Analysis- Autodesk certification
• proficient in FEM Design-StruSoft certification

EUROCODE 0: Bases of structural design;

EUROCODE 1: Actions on structures;

EUROCODE 2: Design of concrete structures;

EUROCODE 3: Design of steel structures;

EUROCODE 8: Design of structures for earthquake resistance;


Employer:

a) ADYVAS S.R.L, Roman- CIVIL ENGINEER


Period: 09.2011-12.2012

a) Multicultural Center Bishop Melchisedec.

Main activities and responsibilities:

- Rehabilitation and consolidation of historic monument, work coordination and supervising, design
reinforcement for girders, 3D ArchiCAD Survey
b) Multicultural Center Bishop Melchisedec.

Main activities and responsibilities:

- Rehabilitation and consolidation of historic monument, work coordination and supervising, design
reinforcement for girders, 3D ArchiCAD Survey
b) CONSTRUCTII UNU S.A, Iasi, CIVIL ENGINEER.
Period: 03.2013-06.2013

a) Moldovia and Bukovina Cathedral

Main activities and responsibilities:


- Restoration and consolidation of the NW WING
- Employee’s coordination on daily task and carrying out deadlines
Surveying and consolidation drawing of NW WING

Consolidation drawing of horizontal roof bracing NW WING


c) COOFOR DEVELOPMENT, Yaounde-Cameroon, CIVIL ENGINEER
Period: 06.2013-09.2013

Main activities and responsibilities:

- Design and technical assistance of Coffor Structural Formwork


- Foundation design and quantities check
- Preparing and building first floor as an example of Coffor technology
- Work coordination of employees on daily tasks
d) SYSTEMBAU SPS, Ploiesti, DESIGN ENGINEER
Period: 03.2013-12.2014

Main activities and responsibilities:


- Design structural element ,columns girders, steel sheets over the roof,
- Detailing of steel structures.

Winmark Mall, Ploiesti- restoration


Entrances steel canopy, façade mullions and transoms
WDP-Aricestii Rahtivani,Prahova
Design and detailing of structural 3d –girder
Industrial Hall-Covasna, foundation design and drawings
KHD-Satu Mare

Steel columns at stairway,


design and detailing

Alpine sage guards, concept, design and detailing


e) WSP, Bucharest, STRUCTURAL PROJECT ENGINEER.
Period: 12.2014- 05.2018

1) Academic Hospital B11 Upgrade- Parts of design ( beams, columns, slab), coordination’s with other
disciplines in Navisworks of Electrical , Ventilation-
Project period approx.1 year.

The building is located in Uppsala, the area of the Academic Hospital adjacent to the buildings B9 and
B12 to the west. It consists mostly of cast-casting walls and pillars with TT cassettes like a plaster.
Roof of light concrete on steel beams. In order to get a fast and rational construction, the new parts of
the body are, as far as possible, prefabricated irrigated concrete and steel elements.

Existing phase New Phase


2) Kv Rådhuset 1, Skara, a new construction of a two-storey residential house with a furnished loft.
Building design together with a college using Robot structural analysis (columns, foundations, roof
elements), detail drawings.
Project period approx. 3 months
3) KSS, Huss 11, model in Revit existing hospital building no 11 according to 1970’s plans
Project period approx. 1 month

4) Kv Akilles, model and design reinforcement in Revit.


Project period approx. 1 month
5) Expansion of a detention center outside Gothenburg, part Revit model and sections
Project period approx. 1 month

6) Water Reservoir Gallivare, part Revit model and drawings


Project period approx. 1 month
7) Water Reservoir Sunderby Sjukhus Kylvattenledning - Revit reinforcement modeling and detailing.
Project period approx. 1 month

8) Kv Melonen, Resedential building. Revit model and FEM design


Project period approx. 1 month
f) TRACTEBEL Bucharest, TEAM LEAD
Period: 08.2018-10.2021
Hinkey Point C Nuclear Power Station ( HPC), reinforcement modeling and drawings
using Tekla Concrete
g) PROJECT1- BIM SPECIALIST
Period: 10.2021-08.2022
Amazon IAS14 project BIM Manager, Technical department coordinator on site for fit-
out project- coordinate with all MEP installation department . Check clashes, create schedule,
measure, review and design according to site requirements.
a) PROJECT1- BIM SPECIALIST / SITE MANAGER FOR DRILLING TEAM
Period: 08.2022 -

Technical coordinator on site with As Build modifications and centralization in Revit


with Navis clash check and BIM 360
Coordinate a team of max.10 workers for daily jobs regarding openings and
reinforcement in sandwich panels and ceiling panels for all technical disciplines including
MEP and Architectural,

You might also like