1-a)

The critical section at the opening

HEB280

bf= 280 mm =28 cm tf=18 mm =1.8cm tw=10.5 mm=1.05cm

Zp= 28*1.8*(45-1.8)+5.7*1.05*(45-2*1.8-5.7)= 2390.945 cm3

1-b) 28.00

Assume that flange carry call shear forces 1.80


5.70
𝜎𝜎
𝑀𝑀𝑝𝑝𝑝𝑝 = 𝑀𝑀𝑝𝑝 − 𝑀𝑀𝑤𝑤 ∗ �1 − �
𝜎𝜎𝑦𝑦
1.05
𝜎𝜎 30.00 30.00 45.00
0.99𝑀𝑀𝑝𝑝 = 𝑀𝑀𝑝𝑝 − 𝑀𝑀𝑤𝑤 ∗ �1 − �
𝜎𝜎𝑦𝑦

𝜎𝜎
−0.01𝑀𝑀𝑝𝑝 = −𝑀𝑀𝑤𝑤 ∗ �1 − �
𝜎𝜎𝑦𝑦 5.70
1.80
𝜎𝜎
−0.01 ∗ 𝑍𝑍𝑝𝑝 = −𝑍𝑍𝑤𝑤 ∗ �1 − �
𝜎𝜎𝑦𝑦
𝜎𝜎
−0.01 ∗ 2390.945 = −5.7 ∗ 1.05 ∗ (45 − 2 ∗ 1.8 − 5.7) �1 − �
2.4
𝛔𝛔 = 𝟐𝟐. 𝟏𝟏𝟏𝟏𝟏𝟏𝟏𝟏 𝐭𝐭/𝐜𝐜𝐜𝐜𝟐𝟐

�𝜎𝜎 2 + 3𝜏𝜏 2 = 𝜎𝜎𝑦𝑦

�2.13142 + 3𝜏𝜏 2 = 2.4

𝝉𝝉 = 𝟎𝟎. 𝟔𝟔𝟔𝟔𝟔𝟔𝟔𝟔𝟔𝟔 𝒕𝒕/𝒄𝒄𝒄𝒄𝟐𝟐


𝑉𝑉
𝜏𝜏 =
𝐴𝐴𝑤𝑤𝑤𝑤𝑤𝑤
𝑉𝑉
0. .63695 =
2 ∗ 5.7 ∗ 1.05
𝝉𝝉 = 𝟕𝟕. 𝟔𝟔𝟔𝟔𝟔𝟔 𝒕𝒕
2-a)
IPE 600  Zp =3512 cm3  Mp = Zp*Ϭy =3512*2.4=8428.8 cm.t =84.28 mt
P P P
Assume failure in first span
P*4𝜽𝜽 = 3* 𝜽𝜽 *Mp

P = (3/4)*Mp = (3/4)*84.28 = 63.21t P P P

Trial ?
Assume Failure in Second Span (1)
?

2?

P*4.5𝜽𝜽 = 4* 𝜽𝜽 *Mp P P P

P=(4/4.5)*84.8= 75.378 t Trial


? ?
(2)
2?

Failure will occur at first span


P=smallest =63.21 t
𝟔𝟔𝟔𝟔. 𝟐𝟐𝟐𝟐
ℷ= = 𝟏𝟏. 𝟓𝟓𝟓𝟓
𝟒𝟒𝟒𝟒

2-b)
P P P

P P P

? ?

2?

P * 4𝜽𝜽 = 4* 𝜽𝜽 *Mp

Pupper = Mp = 84.28 t
𝟖𝟖𝟖𝟖. 𝟐𝟐𝟐𝟐
ℷ𝒖𝒖𝒖𝒖𝒖𝒖𝒖𝒖𝒖𝒖 = = 𝟏𝟏. 𝟓𝟓𝟓𝟓 = 𝟐𝟐. 𝟏𝟏𝟏𝟏𝟏𝟏
𝟒𝟒𝟒𝟒
Lower Limit
𝟏𝟏. 𝟓𝟓𝟓𝟓𝟓𝟓 𝑴𝑴𝑴𝑴
=
𝑷𝑷𝒖𝒖𝒖𝒖𝒖𝒖𝒖𝒖𝒖𝒖 𝑷𝑷𝑳𝑳𝑳𝑳𝑳𝑳𝑳𝑳𝑳𝑳
𝑴𝑴𝑴𝑴 ∗ 𝑷𝑷𝒖𝒖𝒖𝒖𝒖𝒖𝒖𝒖𝒖𝒖 𝑴𝑴𝑴𝑴 ∗ (𝑴𝑴𝑴𝑴) 𝟐𝟐
𝑷𝑷𝑳𝑳𝑳𝑳𝑳𝑳𝑳𝑳𝑳𝑳 = = = 𝑴𝑴𝑴𝑴 = 𝟓𝟓𝟓𝟓. 𝟏𝟏𝟏𝟏𝟏𝟏 𝒕𝒕
𝟏𝟏. 𝟓𝟓𝟓𝟓𝟓𝟓 𝟏𝟏. 𝟓𝟓 ∗ 𝑴𝑴𝑴𝑴 𝟑𝟑
𝟓𝟓𝟓𝟓. 𝟏𝟏𝟏𝟏𝟏𝟏
ℷ𝒖𝒖𝒖𝒖𝒖𝒖𝒖𝒖𝒖𝒖 = = 𝟏𝟏. 𝟓𝟓𝟓𝟓 = 𝟏𝟏. 𝟒𝟒𝟒𝟒𝟒𝟒
𝟒𝟒𝟒𝟒