Volume Dan Schedule Beton
Volume Dan Schedule Beton
No URAIAN Satuan Moro'o Idano Gali Humene Siduo Oyo Sira'a Total
1 Borepile D 80 titik 30,00 24,00 30,00 12,00 72,00 - 168,00 Vol Beton Per M' = 0,5024 M3/M'
M' 360,00 288,00 360,00 84,00 1.176,00 - 2.268,00
M3 180,86 144,69 180,86 42,20 590,82 - 1.139,44
-
TOTAL 180,86 144,69 180,86 42,20 590,82 - 1.139,44
VOLUME BETON FC 30
No URAIAN Satuan Moro'o Idano Gali Humene Siduo Oyo Sira'a Total
VOLUME BETON FC 10
No URAIAN Satuan Moro'o Idano Gali Humene Siduo Oyo Sira'a Total
VOLUME BETON FC 20
No URAIAN Satuan Moro'o Idano Gali Humene Siduo Oyo Sira'a Total
SCHEDULE BETON