Annexure 3

New Construction Work( make separate sheet if required)

Name of Institute Date:_________


Name of Activity 1 Activity 2 Activity 3 Activity 4 Activity 5 Total
Activity

Detail
2 Class Constructio Two Class
Room on n Room
First Flor Toilets,Math With
With Lab & Class Varanda
Varanda room with
varanda
Amount 2175000 3075000 1750000
allocated
Amount Utilized
as on----
1.Work order
given by college
to the
construction
agency (Date)
2.Release of
Funds from
college to
Construction
agency(Date)
3.NIT Issued
(Date)
4.NIT
Opened(Date)
5.Work Order 28.07.16 06.10.17
given by
Construction
Agency to
Contractor(Date
)

6.Work Start 07.08.16 16.10.17 Not Start


Date
7.Proposed 06.02.17 05.02.18
Deadline to
Finish Work
8.Present Status Complete Not Start