Steam Turbines

Start Up Control

Chemical Power | Electrical Power

Presentation Topics-2024

engineerimran17@yahoo.com

+92-3316892791
1141
HRSG Start Up programmes
Operating P=45 bars and T=500C
Cold start Up started after 20 hours of shutdown
Warm start Up started after 8-20 hours of shut down
and HP drum Pressure >20 bars
Hot start Up started after 8-20 hours of shut down
and HP drum Pressure >20 bars
Start Up Sequence
Operating P=45 bars and T=500C

Set Sections
Ensure drain and vents status.
Set the startup levels.
Start the Auxiliary
Start Up Sequence
(continue----
Operating P=45 bars and T=500C
Startup boiler and turbine bypass operation.
HP steam line and turbine body heating.
Reset the turbine protections.
Turbine rolling and control of heating or stresses.
Start Up Sequence
Operating P=45 bars and T=500C
Set Sections
Put All SLC and vent and drain valves on auto.
Put coordination program on auto.
Ensure that all sections are as per selected fuel.
Ensure that all GCs,SGCs and SLCs are on auto.
Start Up Sequence
Operating P=45 bars and T=500C
Set Set the startup levels
During start up HP, IP and LP drum levels increase
drastically as volume of water incraese due to
heating called selling levels.
HP drum level <400mm
LP drum level <450mm
Start Up Sequence
Operating P=45 bars and T=500C
Set Set the startup levels
During start up level can be maintained through
start up blow down.
Note: Before reducing level start the boiler
circulation pump as these will get start command
only when HP drum level >600mm
Start Up Sequence
Operating P=45 bars and T=500C
Start the Auxilaiary
Note: Before reducing level start the boiler circulation pump as
these will get start command only when HP drum level >600mm.
Aux of boiler will be start up on Auto through UCP or start on
manual in order to save the time and open cycle generation
(recommended)
Start Up Sequence
Operating P=45 bars and T=500C
Startup boiler and turbine bypass operation
Before start of boiler ensure that all boiler general safeties and master
softies are reset (boiler protection are reset)
Before start of boiler ensure that power pack (diverter dampers) are in
operation and pumps are making suficient pressure (control and safety fluid
pressure are OK).
Before startup of boiler ensure that turbine bypass or boiler by pass are
Start Up Sequence
Operating P=45 bars and T=500C
Startup boiler and turbine bypass operation
Before startup of boiler ensure that turbine bypass or boiler bypass are
available.
In order to make available turbine bypass or boiler bypass ensure the
following two things.
1. Bypass hydraulic oil system in operation and bypass protections are OK.
2. Condenser vacuum system is oin operation and condenser vacuum is set.
Start Up Sequence
Operating P=45 bars and T=500C
Startup boiler and turbine bypass operation
Boiler bypass operation have following two objectives.
1. Dump the wet steam in condenser and bypass the turbine.
2. Increase the metal temperature of turbine.
1141

Imran Nawaz
Power plant Engineer

engineerimran17@yahoo.com

+92 3316892791