CEM

National Air Compliance Training


CEMs

Continuous Emission
Monitoring Systems

NACT 221

Course Overview
CEMs

 CEM implementing
regulations
Continuous Emission Monitoring
 CEM basic theory and
operation
 CEM system components
 System certification
requirements
 Inspection and quality
assurance

Monitoring
Methods
CEMs

VEE
Manual
CEM
Extractive
In-Situ
Predictive

1
CEM

Purpose of CEMS
CEMs

Regulators View
 Determine emission compliance
 Identify periods of excess emissions
APCD
 Assess control equipment efficiency
 Monitor operating parameters
 Validate emission credits
 Public perception reports
 Haz. Waste Incinerators
 Municipal Waste Combustors

Purpose of CEMS
CEMs

Industry View
 Comply with regulations
 Demonstrate compliance PG&E

 Monitor control equipment


 Monitor process parameters
 Validate emission credits
 Complaint protection
 Plant safety

CEM Systems & NSPS


CEMs

2
CEM

CEM Systems & NSPS


CEMs

 NSPS for many categories


 NOx, SOx, PM …. PG&E

 Source Testing
 Reference Methods
 CEM Systems

CEM Implementing Regulations


CEMs

 Federal
 NSPS 40 CFR 60, App. B
 RCRA 40 CFR 264 & 266
 CAAA (1990) 40 CFR 75
(Acid Rain Program)
 Credible Evidence Rule
 Compliance Assurance
Monitoring (CAM)

CEM Implementing Regulations


CEMs

 State
 NSPS delegation
 SIP 40 CFR 51, App. P
 Operating Permits
 Discretionary programs
 Implicit programs
 CEM QA Manual
 CEM Guidance Document

3
CEM

NSPS CEM Requirements


CEMs
(Partial Listing)
 FFFSG (D) - Opacity, SO2, NOx
 Portland Cement Plants (F) - Opacity
 Kraft Pulp Mills (BB) - Opacity, TRS
 Municipal Waste Combustors (Ea) -
Opacity, SO2, NOx, CO
 Part 75 Steam/Electric Generators -
SO2, NOx, Velocity, Opacity

Parameter Monitoring : PEMS


CEMs

 Fuel sensors (consumption)


 Water/fuel ratio (NOx reduction)
 Ambient TPH sensors (heat efficiency)
 Operational & EER Reports Apply
 RATA & PS

 NOx
 SOx
 CO

PEMS
Unit

Graphic Courtesy of
Solar Turbines

4
CEM

CEMs as Compliance Instruments


CEMs

 Some NSPS Subparts : CEMs are designated as


direct compliance instruments.

 California considers all CEMs at delegated NSPS


sources to be direct compliance instruments.

CEM: Compliance Instruments

Federal Guidance
CEMs

 Standards Setting
 Test Methods
Feds Always Write Simple Rules !!
 Performance Specifications
 40 CFR 60, Appendix B
 40 CFR 75, Appendix A
 Quality Assurance Criteria
 40 CFR 60, Appendix F
 Enforcement Guidance

5
CEM

Performance Specs : Gauge


CEMs
 PS 1 - Opacity Monitors
 PS 2 - SO2, NOx CEMS
 PS 3 - CO2, O2, CEMS
 PS 4 - CO CEMS
 PS 5 - Total Reduced Sulfur (TRS) CEMS
 PS 6 - Rate (Velocity) Monitors
 PS 7 - Hydrogen Sulfide (H2S) CEMS
 PS 8 - VOC CEMS
 PS 9 - Gas Chromatograph CEMS
 PS 11 - PM CEMS
NSPS
 PS 12 - Hg CEMS 40 CFR 60 B
 PS 16 - PEMS (Predictive)

Typical CEM
CEMs
Sources

B&W
Utility
Boiler

6
CEM

Utility Boiler with


Steam Turbine

Cement Kiln
CEMs

Utility Boiler w/SCR

7
CEM

Bio Mass Utility Boiler

CEMs

Municipal Solid Waste Boiler

CEMs

Rotary Kiln

8
CEM

Gas Turbine
Power Plant

CEMs

Kraft Pulp Paper Mill

“FFFSG” CEM Units

9
CEM

CEMS Monitors
CEMs

 Opacity  VOC
 Sulfur Dioxide  Hydrogen Chloride
 Nitrogen Oxides  Ammonia
 Carbon Dioxide  Total Reduced Sulfur
 Carbon Monoxide  Hydrogen Sulfide
 Oxygen  Gas Velocity
 Mercury

Systems Classifications

Source Monitoring Systems

Extractive Systems In-Situ Systems Predictive Systems

Dilution Non-dilution Point Path


(source level)

In-Stack Out-of-Stack Dry Wet Single Pass Double Pass

CEMs

Extractive & In-Situ


Systems

10
CEM

Extractive & In-Situ Systems


CEMs

 Extractive Systems
 Gasextracted
 Transported to analyzer
 Concentration of pollutant is measured

 In-Situ Systems
 Point systems
 Path systems

CEMs

Let’s Discuss CEM Opacity Monitors

Opacity
Transmissometer

CEM System -
Opacity Monitoring

11
CEM

Plume Opacity
CEMs

 OPACITY  The fraction of light that is


attenuated by an optical medium (Op)

 TRANSMITTANCE  The fraction of light


that is transmitted through an optical
medium (Tr)

 Op = 1 - Tr

Plume
Opacity

0 10 20 30 40 50 60 70 80 90 100

Percent Transmission

100 90 80 70 60 50 40 30 20 10 0

Percent Opacity

5 4 3 2 1 0

Ringelmann

12
CEM

Transmissometer

CEMs

Opacity Transmissometer

CEMs

Opacity
Monitor

13
CEM

CEMs

Opacity Retro-reflector

Double Pass Transmissometer

CEMs

Purge Air
System

14
CEM

Dirty
Air
Blower
System

Double Pass
Transmissometer

CEMs

Opacity Monitor Panel

15
CEM

Performance Specifications (PS1)


CEMs

 Peak & Mean Spectral Responses


 Angle of View
 Angle of Projection
 Optical Alignment Sight
 Simulated Zero & Upscale Calibration
System

Design Specification Verification


CEMs

 Test Each Analyzer

OR

 Obtain
Certificate of Conformance
from Manufacturer

Measurement Locations
CEMs

 Representative Emissions
 Accessible
 Routine Maintenance
 Performance of Calibration Audits & Checks
 Downstream from Control Equipment
 No Condensation near Monitor
 No Presence of Ambient Light

16
CEM

CEMs Representative
Sample and
Accessibility

Particle Stratification
&
Plane of the Bend

CEMs

Downstream
from CE

17
CEM

CEMs

Access

Transmissometer Calibration

40 CFR 60
Appendix B

Opacity Performance Specs


CEMs

 Lab Tests
 Cal error < 3% opacity
 Response time < 10 s (0 - 95%)
 Field Tests
 Conditioning period 168 h
 Operational test period 168 h
 24 h zero drift < 2% opacity
 24 h calibration drift < 2% opacity
 Data recorder resolution < 0.5% opacity

18
CEM

Transmissometer Audit

CEMs
Audit
Filters

Self Calibration
CEMs
Error Check

19
CEM

CEMs

Let’s Discuss CEM


Flow Monitors

Emission Rate Monitoring


CEMs

 CAAA Sec. 412 : Velocity Monitors  CEMs

 PMR = CS AS VS

 PMR = Pollutant Mass Rate


 CS = Concentration
 AS = Stack Area
Allowance
 VS = Stack Gas Velocity Program
 lbs/hr = (lb/ft3) (ft2) (ft/hr)

Differential Pressure Measuring

20
CEM

Differential
Pressure
Measuring

Standard
Pitot Tube

Type S
Pitot Tube

Stack Velocity Stratification

21
CEM

Annubar Used to Determine Flow Rate

Thermal Flow Sensor

Acoustic
Velocity
Measurement

22
CEM

Flow Monitor
CEMs

CEMs

Let’s Discuss CEM Extractive Systems

CEM Extractive
System

23
CEM

Extractive Systems
CEMs

 Case by Case : No Best System


 Source Level - Direct Systems
 Cool - Dry
 Hot Wet

 Dilution Systems
 In - Stack
 Out - of - Stack

Extractive Systems
CEMs

 Advantages
 Versatile & Flexibility in Location
 Ease of Maintenance

 Disadvantages
 May Alter Sample
 Response Time May be Slow
 Maintenance Cost & Frequency

CEM Stack Gas Probe Area


CEMs

24
CEM

Extractive System Components


CEMs

 Probe
 ParticulateFilter
 Moisture Conditioning System
 Pump & Sample Line
 Controller
 Analyzer
 Data Analysis

CEM Gas Sampling Probe

External
Probe
Filters

25
CEM

Filter Blow Back

Internal Coarse Filter

Inertial Filter

26
CEM

Let’s Discuss
CEM
Sample Lines

Sample Line : Umbilical


Assembly

CEM
Umbilical
Cord

27
CEM

Refrigerated
Condensers

Moisture Removal

Jet
Stream
Condenser

Permeation Dryer

28
CEM

Sampling
Pumps :

Ejector
Pump

Diaphragm Pump

Let’s
Discuss
Dilution
Systems

29
CEM

CEMs Dilution
Systems

Dilution Systems

Dilution
Probe

Dilution
Probe

30
CEM

Dilution Probe

Q1 = Dilution Air Rate (Lit/min)


Q2 = Sample Gas Flow Rate (Lit/min)

Dilution
Air
Cleaning
System

CEMs

Let’s Discuss CEM Gas Analysis

31
CEM

CEM Analytical Techniques


CEMs

 Infrared Methods
 DifferentialAbsorption
 Gas Filter Correlation
 Fourier Transform Infrared

 Ultraviolet Methods
 DifferentialAbsorption
 Second Derivative Spectroscopy
 Visible Light - Opacity Measurement
 Scattering & Absorption

CEM Analytical Techniques


CEMs

 Luminescence Methods
 Fluorescence & CVAFS
 Chemiluminescence
 Flame Photometry
 Electroanalytical Methods
 Polarography
 Electrocatalytic
 Paramagnetism
 Conductivity

Normal Vibration of SO2 Molecules

32
CEM

Beer-Lambert Law
CEMs

 Absorption of light related to:


 Absorption coefficient dependencies
 Wavelength of light
 Properties of the pollutant molecule

 Number of molecules in light path


 Concentration

 Path length

Simplified Stack Sample System

IO I

Calibration Plot

Calibration Gas #1

Unknown Calibration Gas #2

ln 1/Tr
Concentration
of unknown
Calibration
Gas #3

Gas Concentration (c)

33
CEM

Non-Dispersive UV Analyzer
I = 285 nm

IO = 578 nm

Fluorescence SO2 Analyzer

Non-Dispersive IR Analyzer

IO

34
CEM

Let’s Discuss
GFC CO
Analyzer

Gas Filter
Correlation
Analyzer

IO

35
CEM

Looking Inside
a GFC CO
Analyzer

CEMs

NOx
& CO
Analyzer

Chemiluminescence NOx Analyzer

36
CEM

CEMs Thermo Environmental


Chemiluminescence NOx Analyzer

Electrocatalytic O2 Analyzer
O2 = 3% O2 = 20.9%

O2 & CO
Analyzer

37
CEM

CEMs

Sample
Lines

Key New Rules w/PM CEMS


CEMsMeasurement Options or Requirements
• Mercury Air Toxics Standards
(MATS) for Utility Boilers
(Subpart UUUUU)
– Compliance date 4/16/2015
• Portland Cement MACT
– Compliance date 9/9/2015
• Commercial/Industrial
Incinerator MACT (CISWI)
– Compliance date 8/7/2013
• Boiler MACT
– Compliance date 1/31/2016
• Sewage Sludge Incinerator
MACT (SSI)
– Earliest compliance date 3/21/2016

PM CEMS
CEMs • Analytical Techniques
– Beta Attenuation
– Light Scattering
– Hybrid with TEOM

• In Situ or Extractive

• Venders
– Sick Maihak
– ThermoFisher
– M & C Particle Tracker
– PCME
– MSI
– Teledyne-ML
– Altech Beta

38
CEM

PS11 for PM CEMS


CEMs

Certification Testing
Requirements

– 7-day calibration drift test

– Measurement responses
correlated to RM concentrations

– Correlation source-specific

Key New Rules w/Hg


CEMs Measurement Requirements
• Mercury Air Toxics Standards
(MATS) for Utility Boilers
(Subpart UUUUU)
– Compliance date 4/16/2015
• Portland Cement MACT
– Compliance date 9/9/2015
• Commercial/Industrial
Incinerator MACT (CISWI)
– Compliance date 8/7/2013
• Boiler MACT
– Compliance date 1/31/2016
• Sewage Sludge Incinerator
MACT (SSI)
– Earliest compliance date 3/21/2016

Hg CEMS
CEMs
• Measure gaseous Hg
– Elemental (Hg0)
– Oxidized (Hg2+)

• Almost all convert


oxidized Hg to
elemental Hg for
measurement of total
gaseous Hg

• Calibrate using NIST-traceable


mercury gas
generators or cylinders

39
CEM

PS12A for Hg CEMS


CEMs

Certification Testing
Requirements

– 7-day calibration drift test --


with Hg0 or Hg2+

– Measurement error test --


3 levels with Hg0 and Hg2+

– Relative accuracy against a


RM

Sorbent Trap Monitoring System Background


CEMs

• Integrated sample
measures total
gaseous Hg

• For post-PM control


locations

• Paired traps, in-stack


w/3 sections

• Proportional sampling

PS12B for Sorbent Trap


CEMs Monitoring Systems
• Sampling/analytical
requirements
– Sampling train and
operations
– Sampling/sample QA
• Certification testing
requirements
– Spike recovery study
• Sorbent capture capability
• Analytical capability
– Relative accuracy against a
RM

40
CEM

Appendix F, Procedure 5
CEMs

• For Hg CEMS
– Daily calibrations -- with Hg0 or Hg2+
– Weekly system integrity check with Hg2+
– Quarterly RAA or 3-level gas audit with Hg0 and Hg2+
– Annual relative accuracy test audit (RATA)

• For sorbent trap monitoring systems


– Annual RATA
– PS12B, not Procedure 5, specifies routine QA/QC
(leak checks, calibrations, paired train agreement,
spike recovery, breakthrough)

Control Panel

CEMs

Let’s Discuss CEM Data Acquisition

41
CEM

CEM Data Acquisition System

CEMs

CEM
DAS

CEMs

CEM
System
Interface

42
CEM

ROLLING
CEMs
AVERAGES

3 Hour Block and Rolling Averages

3-HOUR ROLLING AVERAGE


HOUR 1 NO AVERAGE
HOUR 2 NO AVERAGE
HOUR 3 AVERAGE OF HOURS 1, 2 & 3
HOUR 4 AVERAGE OF HOURS 2, 3 & 4
HOUR 5 AVERAGE OF HOURS 3, 4 & 5

HOUR n AVERAGE OF HOURS


n-2, n-1 & n

43
CEM

Subpart Da
30 Day
Rolling
Average

US EPA ARB

Emissions Air Districts


Reporting

Emission Data Summary


CEMs

 Duration of excess emission reporting period


due to:
 Startup& shutdown
 Control equipment problems
 Process problems
 Other known causes
 Unknown causes

 Total duration of excessive emissions divided


by the source operating time x 100 = __%

44
CEM

Monitoring System Performance Report


CEMs

 CEM performance summary


 Monitor equipment malfunctions
 Non-monitor equipment malfunctions
 QA calibrations
 Other known causes
 Unknown causes

 Total CEM downtime divided by the the total


source operating time X 100 = % downtime

CEMs

Let’s Discuss CEM Gas Calibration

CEM
Dilution
System
Calibration

45
CEM

Probe Calibration Gas Points


Extractive Systems

Calibration Drift (Error) Test


CEMs

 The tests examine the CEM system’s ability


to hold its calibration over a period of time.

 40 CFR 60 Appendix B : Calibration Drift


Test

 40 CFR 75 Appendix A : Calibration Error


Test (NIST Ref. Material gases)

PST Calibration Drift Test


CEMs

 Zero and high level drift


tests examine a
CEM’s ability to hold
calibration over a
period of 168 hours with
more than 50% of normal
plant load

 Evaluated @ 24-hr intervals


for 7 consecutive days

46
CEM

Calibration Drift Criteria


CEMs

Cylinder gas reference value - Monitor value


CD = Span value X 100

 Calibration drift is calculated as a %


 CEM system may not exceed the drift
specifications for any one of the
7 days of the test
 Zero (low-level) drift
 Span (high-level) drift

Performance Drift Specs


CEMs

PS GASES CAL DRIFT

2 SO2, NOX 2.5% of span value


3 O2, CO2 0.5% of gas reference value
4 CO 5% of span for 6 of 7 test days
5 TRS 5% of span for 6 of 7 test days
7 H2S 5% of span for 6 of 7 test days
8 VOC 2.5% of span value

Out-of-Control Conditions
CEMs

 40 CFR 60 Appendix F
 Eitherthe low or high level calibration
check result is greater than 2 times the
PS drift for 5 consecutive days or 4 times
the drift for any one day

 40 CFR 75
 System is out of control if the drift exceeds 2
times the PS drift

47
CEM

Calibration Gas Hierarchy

Calibration
Gases

Cal Gas Certificate Points


CEMs

 Cylinder ID number  Reference standard data


 Certified  Statement of procedures
concentration  Lab and analyst ID
 Balance gas  Gas analyzer ID and cal date
 Cylinder pressure  Analyzer readings & calc
 Certification date used
 Expiration date  Chronological cert record

48
CEM

Cal. Gas
Certification

Expired Calibration Gas

Calibration Gases

49
CEM

Bird
Nest ??

Let’s Discuss CEM Quality Assurance

CEM QA Program

A Total CEM System


Quality Assurance Program

Procurement Installation & Continuing Record


Quality Control Certification Operation Keeping

Preventive Corrective Audits


Maintenance Maintenance

System Agency Performance


Audits Audits Audits

50
CEM

40 CFR 60.8 & 60.13


Test Time Frame

PST Pretest Meeting


CEMs

 Plant operation at test time


 Control equipment status
 CEM operational status
 Test schedule
 Test procedures & cal gas used
 Exceptions
 Test report requirements
 Plant tour

QA Program :
40 CFR 60 App. F & 40 CFR 75 App. B
CEMs

 CEM system calibration and QC checks


 Calibration drift determination and system
adjustment
 Preventative maintenance of system including
spares
 Data recording, calculations, and reporting
 Accuracy audit procedures including sampling
and analysis methods
 System malfunction corrective actions.

51
CEM

CEMs

CEM AUDITS
CEMs

 Systems Audit
 Qualitative Evaluation

 Performance Audit
 Quantitative Evaluation

 Relative Accuracy Test Audit (RATA)


 Cylinder Gas Audit (CGA)
 Relative Accuracy Audit (RAA)

Cylinder Gas Audit (CGA)


CEMs

 Required once per quarter


 One audit gas (NIST traceable) 20 - 30% of span
 The other gas (NIST traceable) 50 - 60% of span
 Challenge the CEM system 3 times with each
gas

 CEM relative accuracy  15% (40 CFR 60)


 CEM relative accuracy  5% (40 CFR 75)

52
CEM

Relative Accuracy Test Audit

Relative Accuracy Test


CEMs

 Most important part of Performance Specs.


 Most expensive to perform
 Coordination is important

 RATA conducted to determine :


 if CEM system will give data
 that can be compared with data obtained
using EPA Reference Methods

Relative Accuracy Test


Audit (RATA) vs. CEM

53
CEM

Typical
Source
Test

CEM RATA Test

CEM
Shelter

54
CEM

Relative Accuracy
CEMs

RA = | d | + | CC |
x 100
RM *

*Or applicable subpart standard

RATA Procedure
CEMs

 Min. of 9 data sets obtained


 Each set of data : 30 - 60 min.
 12 data sets might be taken
 Tester may reject 3 data sets
 Rejected data must be reported

 See Handout for RATA Calculations

Part 60 RATA Specs


CEMs
PS GASES RELATIVE ACCURACY

2 SO2, NOX 20% of RM value in units of the standard


10% of applicable standard ( >130 ng/J)
15% of applicable standard ( >86 <130 ng/J)
20% of applicable standard (<86 ng/J)

3 O2, CO2 20% of RM value or 1.0% (whichever is greater)

4 CO 10% of RM mean value in units of the standard


5% of app. emission standard (whichever is greater)

5 TRS 20% of RM mean value in units of the standard


10% of app. emission standard (whichever is greater)

7 H 2S 20% of RM mean value in units of the standard


10% of app. emission standard (whichever is greater)

55
CEM

CEM  Probe
Inspection  Umbilical
 Conditioning
 Dilution Air
 Calibration Gas
 Analyzers
 DAS & Audits
 Data & Records

Enforcement Using CEMs


CEMs

 Emission violations
 Percentage reduction
violations
 Data capture violations
 Operation and maintenance
violations
 Procedural and reporting
violations

CEMs

Thank
You

56