RINCIAN PEKERJAAN PENGELASAN KM.

LINTAS BAHARI 66

1. Bongkar pasang ganti baru dinding koming palka sisi kanan


1 bh plat 1020 x 3000 x 10 mm 243,4 kg Rp = 2.692.800
1 bh plat 1020 x 2100 x 10 mm 173,3 kg Rp = 1.884.300
2 bh plat 100 x 5250 x 10 mm 10,5 @125.000/m Rp = 1.312.500
4 bh plat 250 x 950 x 10 mm 76 kg Rp = 836.000
4 bh plat 100 x 950 x 10 mm 3.8 m @125.000/m Rp = 475.000
3 bh plat 400 x 950 x 10 mm 91.2 kg Rp = 1.003.200
3 bh plat 100 x 950 x 10 mm 2,85 @125.000/m Rp = 356.250
2. Dabbling dinding palka sisi kanan
2 bh plat 200 x 100 x 6 mm @10 kg / bh Rp = 220.000
3. Dabbling dinding palkaa sisi kiri
5 bh plat 800 x 1200 x 6 mm @10 kg / bh Rp = 550.000
4. Dabbling deak tempat gulungan palka
1 bh plat 800 x 1200 x 6 mm 46 kg Rp = 560.000
2 bh plat diameter 26 cm x 6 mm @ 10 kg/bh Rp = 220.000
5. Bongkar pasang ganti baru pipa border haluan
1 btg pipa 8” sch 80 x 500 4m Rp = 280.000
1 bh plat diameter 26cm x 10 mm @ 10 kg Rp = 110.000
2 btg pipa 8”sch80 x 500 8m Rp = 560.000
2 bh plat diameter 26 cm x 10 mm @ 10 kg/bh Rp = 220.000

TOTAL Rp =
11.226.050

POTONG TRAVO LAS 4 HARI Rp =


1.200.000

TOTAL SISA Rp =
10.026.050

Jakarta, 22 September 2023

Hormat Kami
KARMIN