The site is near the gate to the College at the corner The Site
of Western Road and Donovan's Road and is defined by
De Leuw, Chadwick, 0 hEocha drawing "Location of Extra
Site works began on 14th June; 1972, and were completed Operation
on 20th June, 1972.
compacted.
The drilling is carried out with a compressed air operated rock drilling
machine. The drill rods are generally composed of 8 ft. lengths capable
of being joined together, and fitted to a 2" or 2? rock drill bit.
Compressed air or pressurized water is used for flushing the borehole.
For the purpose of being able to obtain a relative comparison between
the results of the various boreholes, the air pressure supply to rock
drill, motor feed and flushing is kept constant during drilling operations
and checked by means of pressure gauges. The time required for the drill
to penetrate 12" of soil or rock is recorded to form the basis for a
diagram.
cases the crushed rock material from the borehole can be collected and
the type of rock roughly determined by examination.
0 ?Core-boring to at least
posed rock surface
3 metres below sup- that a chemical investigation of the soil water has
been performed with or without bacteriological anal-
ysis, or that other special investigations have been
performed, e.g. corrosion analysis.
Hydrologic Determinations
Boring method and shallow or deep sampling of spe-
0 6
Water-table (datum level) determined in, e.g.
a hole of a post-hole auger
cial interest shall be indicated to the left of the bore
hole sign with abbreviation according to Sheet re. 3
(e. g. zFo).
Ground-water table determined at short and Sequence of strata encountered shall be recorded to
long term observations, respectively (gener- the right. of the bore hole sign with indication of the
ally in open systems) position of the bottom level of the respective inner,
either as depth from the ground surface (as in ey.im-
ple) or other reference level, or by indication of al-
titude.
Test-pumping or infiltration tests
Depth drilled in rock is indicated to parentheses after
the letter it. In the example Oven, the rock surface
t Pore-Pressure measurements (generally
closed system)
Other Determinations
in Is thus at depth of G.8 m, and the drilling has bye .;I
performed .<in into the rock, i.e. to a C.0/...th 0; 10,8 in.
In simele...re.ee,rdiaz only the number of the bore hole
ii
is sic e
Deformation measurements in the field, e.g. by
9 bench-mark observations If, for lack of space or other reasons, complete bore
bole signs are not given., the omitted data 'shall be
ElTest pit (fairly large) or other point of ge0- specially indicated in the form of note.
technical investigations (e.g. teat loading) The manner of recording the boring re.nilt ir, cross-
section shall, in addition to .hat is n.ven 00 5j... t
*) Type of piston sampler used shall be indicat- No. 2, be indium,: on either the boring drawing or
ed on drawings - on a special notation Frie(t.
A4.4,
Io
ri 4>)
Peat, in general Hill Clay
Boulders
0
Fibrous peat Silt, fine and medium Boulder, penetrated
("Mjii la", 0.002 - 0.02 mm)
. .
. .
In composite soils the symbols shall be combined. In filling the constituent soils shall be marked at the side of
the bore hole, if possible with abbreviations according to Sheet No, 3.
Probably rock
i Boring interrupted - the boring rod can
be driven further without hammering
( A) (Corresponds to for indication in plan view) T--- (Corresponds to 0 in plan view)
21 @As..
for
CO. ANIRENf.
1d. 21A3/4.
DEVELOPMENT PLAN FOR UPIVIMITY COLLEGE CORK
SOIL INVESTIGATION
AUTHORITY:
SCOPE:
taking of soil, rock and ground water samples, the carrying out of
factual report showing on the borehole logs the strata encountered and
FIELD WORK:
Twenty one boreholes were sunk at the positions ,clown on the plan.
The boroholes were started using 204 um. casing and tools by shell and
auger type soils boring rigs. The boreholes were taken by this method
further penetration was not practical. The boreholes were then continued
Mere ground water was struck. its level was noted as were any
changers in its level during the boring o:2eratiolls. Samples of ground water
wore obtained.
-
The borehole logs show the strata encountered, the samples taken,
LABORATORY WOW:
undisturbed samples. The cell pressures used were 5, 15 and 30 lbs per
square inch. Consolidation tests were also carried out on samples cut
1, 2 and 4 tons per square foot. The data obtained from the triaxial
1 4.0 6.75 15
2 3.0 6.50 21
3 3.8 6.75 12
4 2.45 7.0 14
16 2.9 6.75 19
18 2.6 6.5 18
19 3.0 6.5 24
20 3.0 6.75 15
21 2.45 7.0 10
Crushing tents were carried out on core sales of rock with the
2 10.6 8,550
3 5.7 10,750
4 5.0 9,700
5 4.5 11,100
6 aa 12,350
,
B.H. No. Depth of sample Ultimate bearing capacity
(metres) (lbs per sq.inch)
8 2.9 7,000
.
9 4.2 9/450
10 4.1 142 300
11 3.0 10,200
12 6.0 15,600
14 6.5 9,000
15 4.6 12,600
17 ..- 1.8 10,550
DISCUSSION:
of 15/0.
The rock was generally overlain by compact sandy well graded gravel
containing cobbles and boulders. Uhere the gravel was absent, the
rock was overlain by silty fine sand containing a little gravel.. This
silty fine sand also overlay the gravel where it overlay the rock.
was encountered.
The gravel is compact and with a high water table would have an
allowable bearing capacity of 1.0 tons per sruare foot, using the criteria
The silty fine sand also would have an allowable bearing capacity
of the order of 1.0 tons por square foot but with some settlement which
("N
."`
Respectfully submitted
for and on behalf of
A
H. R. CAMERON
B.Sc.,P.Eng.,M.I.C.E.,M.Inst.H.E.
)MMARY OF TESTS RESUE)
'rob'
-
2 2.75 Soft/firm friable grey/brown sandy SILT with 5 8.5 0.25 197 0.0213
some fine /medium gravel .5
$.25 - 0.5 215 0.164
- 1.0
15 12.1 121 21 450 8 11.5 232 0.00131
.0 - 2.0
.
219 0.0082
i
221
0(000
30 18.0
D -
10 1.53 Firm friable brown very sandy SILT with some 5 9.7 0.25 352 0.0153
fine/medium gravel .25 - 0.5 376 0.01-22
15 22.3 126 12 200 22 .5 - 1.0 314 0.0103
.0 - 2.0
291 0.0074
30 .0 -
41,2 4.0 305 0.0052
L
1 1.05 Soft firm brown sandy SILT with some fine medium 5 9.7
gravel
15 12.9 120 17 550 6
30 16.1 ,
!
30 16.2
___
1UMMARY OF TESTS RESUAS
2.
Job: UNIVERSITY COLLEGE, CORK
Site: Sheet No.
TRIAXIAL COMPRESSIOT: TEST CONSOLIDATION TEST
Bore
r DEP7'M DESCRIPTOM Corn. e
No. Lateral prestion /0 In of
Angie Coefficinn of colmicient of
lN531.1,4
Pressure strength Density Moisture Cohesion Friction Pressure Range Consoiiistion CoroFressitItity
(p. s. 14 (p. s, I.) (lbs.ift. 3) Content (p.s. tt) (degrees) eons(7t 2) (ft 2(gr.) (ft. 2)tor.)
I
13 1.37 Loose brown silty SAND 5 15.4
- -
15 45.4 117 31
1
1 30 97.2
15 1.22 5 13.2 0 -
0.25 176 0.0199
1
Soft/firm mottled grey/brown sandy SILT with
some well graded gravel 0.25 - 0.5 165 0.0171
-
0
0
0
0 -
21 1.40 Soft brown very sandy SILT with fibrous organics 5 6.5 0.25 324 0.0314
-
0.25 0.5 357 0.0187
ro
-,000'00
___
XXXX.Y.XXXXX XXX
Foundation Conditions
been proved positively with a core drill but we are satisfied that %Lev
either on rock or very close to it, as the depths agree closely with t,
positions and levels of the rock outcrops which can be seen in the pat:-
surrounding the north end of the site.
Box No. 13
columns will be taken to solid rock in the form of piers. These piers vi.
be little deeper if alternative (a) is adopted but will still: be quite shalt,
except for a small area in the north-west corner.
The extent of rock trimming which will be necessary is
impossible to predict but in the opinion of the writer it will be considerabl
In our opinion the question of a separate contract for
excavation and rock trimming should be given serious consideration. V, e
are not aware of the precise programme of the building at this stage but if
is hoped to begin building operations towards the end of this year or early
in 1965, the preliminary stages of the work would be greatly speeded up
if the excavation were done during this Summer. There is no doubt that
large scale excavation work is much more readily handled in dry weather
and while theoretically letting works in separate contracts generally leads
to some increase in cost, we feel in this case that more favourable rates
might be obtained if the excavation is undertaken during dry weather.
If this course is adopted it would probably be necessary to
construct either portion of the permanent surface water drtinc.1,;e system c
sample liken.
Cla "UnclIsterbee
taken.
(Dis Bulk sample
sample takes,
0 . Fragmentary
taken.
Ab Water maple
mosclus.
Groundwater Condi
Depth of
Cuing wizen
Seated
a 0. Bulk
nbultoturbed" sample otos
sample tk*D.
0 es
Fragmentary israVo tikwa
A wAter onio talon
- Ar Drawing No.
944/1.,
:
.r.7.".r.0"--11*
& Sons Limited
P.J.Hegarty& 1 .
Dear Sirs,
Site Invdstip:ation -
vo-Irs faithfully,
791r,"
Water
Date Encountered I %too tr,,0,4
p.
4,
2
FILE COPY . (Passed by (`At- Corbett before bE
out BY HAND ).
c. to Mr.D.Ryan at Pfizers.
/3T .
ma
2nd . :-IrY 1970.
Yours tali t
H M C CONSTRU`:; . LTD.,
Dictated by
and signed in his absence.
D. RYA . ; B.Sc.,
9.9144
( IS )
- 0)47 Lt CfS Q2-1)
--4i-l-e-- -aisp y -
c. c.to Mr. D. Ryan plus cbpy of Mr. M.Walshs' letter (Mr.Ryan at Pfizer,,
ECC./BT.
ail.
.10.0. MAO WON ONO
23rd. 1970.
Yours faithful,:,
H M C CONSTRUC., . LTD.,
E. C. CORBETT - tcr.
1.
. I
`4,
7
'
4 ,0
'I ,
t
; I
'
#*.
: '
P.
7 oy, 1970
o
9Me. Matachy
V
abh,B.E.', ,
I
!'1. ,
Lzonsultingingivi*er.' 1 .
N.
Patrick's Place, ,A
.1\4.l.Stiut.E.,
A
A ' 1 .
4.
9.II '
r.
Re: 9,
-4. AlAWAAAVAAAA.A AAA.
Now oreholor,
e. ot
.,
? Dear
. .., 0.1100,AVA......W.e A. 1,,Jniv,:rtY
.4.1
AAA AAA
*own. C w.
,Sir,
reflowo
:,..
.: 4 -me.*
t ;) "de 1
.
in ,:itsotfng ^
; = as folliims:telephonieon,..
4.. Transport
'
"Lem
.
*AMP
' ..,i
;...1;-`4,. ...
:3,.:,..a.: cind
between
e borcholoT, frtirtt
3. Drilling 04 :ugh soil .;.. c:25.0.0
'
.: ...: fa:
Ground It vtl 160/-
to.
..
.
.
, - 304 ,. .
:,-.,.1lowiilg d3pths
.,
'20*
4'0 --40'
' .
- :;.
.
I . -
:
.1 -
50' -60'..
50' .
-
ay.-
::;2.,/-
I.
,..,.,,,
-., 6.
I 60' - 70'! .
L....! .,-;-
35/.
' 70'......
. : 00" ' f t.ii.. ..rr .
' E;0' .. 4-V-
90% ..1'' .1 .
90' - 100' .. ....
Li: 40/"'
E. 0.
.
. :
'..7...
Lm 3 for . . 5W-
sands or *Wing through L i!
travels or stiff compact 65/-
S. older clay.
Breaking earodgh
, using obstrtic r.
. . rock
chisel.
.)s and bold
6. Undisturl
:d samples
1 ; Y.: Standard t 50/-
Penetration tos3 : .)CV-
. '
42/-
I
r2 -
Item gate
00111.7. *Mo.& OMB
Amo
ONO
t
Ow. Owe .0.1.000111 Mom
into the rock using the rock chisel, to enable the lent to pass
through. This extra work would,be charged at ; as item no. 5.
Yours faithfully,
1-1 M C CONSTRUCTIO:
D. RYAN - 6.1%,
Encl.
Tam:
A
FILE COPY.
Els.!CLS.
Report No. / 24 3
Box No. t'S
Investigation ID. 6;632- - (.6333
(13 )
D.R/BTz 2 3rd. February 1970.
THE SITE:
SITE WORK:
Two boreholes were put down to depths 36'-6" and 52'-0", using shell and auger
equipment. Disturbed samples were taken at each change of stratum in order to obtain a
continuous record of the strata encountered. In the granular strata standard penetration tests
were carried out to obtain an indication of the relative density of the material.
0 The logs of the borings giving detailed descriptions of the strata encountered are given
at the end of this report.
The borings indicate the site to be covered by a layer of back-fill, underlain by a
brown silt and a layer of sand and gravel.
Groundwater was observed in both boreholes, in both cases at 10' depth.
Standard in-situ penetration tests were made whilst boring the predominantly granular
materials. The number of blows "N" required to drive the penetration tool a distance of one
foot varied within the range 29 blows per foot to 73 blows per foot indicating that where such
soils are encountered they may be considered to be in a medium dense to very dense state of
compaction.
DISCUSSION:
The logs of the boreholes, given at the end of this report, show that immediately
underlying the made-ground on the South side of the entrance roadway is a thick stratum of silt.
Foundations for the retaining wall should not be placed in this material. Therefore any retaining
wall should be stabilised either by deep penetration into the lo. errand/ stratum or by tying
bock to an anchor wall.
over /-
- 2
a flexible type retaining wall penetrating the sand/gravel strata or a gravity type
retaining wall is appropriate.
It difficult to estimate the physical characteristics of the made
is
ground as these vary with degree ofcompaction etc., but it would be inadvisable
to place any foundations in this material.
0
111VfC CONSTRUCTION CO. LTD.
SITE INVESTIGATION DEPT.
LEITRIM STREET, CORK. Telephones 52371/7 DATE
gre
RECORD OF BORING
0
-Made-Ground-. _G.,_L.____ 9s 0" -9.1,4V-___D______1,14).' on _Groundwater _
_11 ..II II 0
il fi , -2- 1 encountered at
Dense__tr --20' II _521_0 h
---10`.4y, .
.
.
Rionaturp
4IM'C CO:\ STRUCTION CO. LTD.
SITE INVESTIGATION DEPT.
Telephones 52371/7 DATE
LEITRIM STREET, CORK.
RECORD OF BORING
BORED FO R
Mr.Malachy Waish,B .E.,C. Eng., F.I.C. E.lLIoN
AT1
U. C.C.
GROUND SURFACE LEVEL
MICE.,MI.Stnict E.,
BORING NO. 2. North side of
Main Entrance.
TYPE OF BORING LINING TUBES
Shell & Auger.
DIAMETER OF BORING
on
INCLINATION DATE STARTED
4/2/70.
BEARING DATE COMPLETED 10/2/g0
Depth Level of Samples
Description of Strata Below Thick- Lower O.D. of Ground-Water Observations
Surface ness Contact Type No. Sample.
1
__bould- - . . . :. _encountered
-dense_sand..with gravel .
- _
- 12 --.-.A6nckgre
APPENDIX 3
/ .1
/ '1
/ s, . / A
'
I
;/ / A 1
/ '2.
ROAD .
160 16A
I
DE LELAV
CHADWICK OhE0
SITE ITEM SI VCIRON FOR UN !VEAL S11 Y
DON OVA COLL EGE
F:OA 0, CORK
BOREHOLE. PL AN
. .
E.
:
i
i
t
'........,...-.........s.
s. IA, .; ,l1 kV
....
.
y 4"..,R.
V441.1
DA,
100. r4
1 .,9t
., , 7
.' tO 0'J
,,n, 7 ,
___
(':
_
- - -
1
.1;641
1 tram Gravelly r Inyey SILT
CS
"C7
:I rar2Z:
:IN,28 brown sandy GRAVEL
- 11j; - -
:iiis.i.Nit 25 brown
-4
3'
..T
Ns26 clayey sandy GRAVEL
CT
-2
COARSE SANE
Ej
t
t
-7 Z,ii N4 47 brawls sandy GRAVEL
-12
' 7_. .4
71:1:11.45 trawl sand). GRAVEL _
-10
-16
-18
222
7
-7)
20 SEC./ 20 CM.
-22
ORRJE & CO
CONSULTING ENGINEERS
D ARCHITECTS
2
1
2romo.
WAIL
-
MB, now*.
-
%V MO. Cr WI..
.4441,14 . 44, Al
- Fly -"--Cit-- - 314
PItAk
. . ..- AA .m v -
4:67,. it 4v1,.
Ltioot. I9..9 4. /Alt
i
'Ati(04 MI.
i
14:,,i
- -
191-
--
9%
- t
:
4.
.L'
-1 4'1444:-
401+N, 9!
(49,09(91.196Llt Pitkil. felt COM61(1 r.
ox_
a
4. Optio
IL 99 a ,s/rea:
a."
i s'
at. twists.)
cL; _ .
'r. '
tinjad._ -Lk AA, da
glIVA1101 A 6 iSkr:04 .6
V
ft"
30' y1
I % It4.410,e t.
/
--tat 691 'L4,4
- .64, AIM_ . .
11442IttleUtflOU 0; &MC
dad,
hFgLL iL lo
IMMIX* WALL Al 111.141C4rY
COU,Se; , COLL.
tostaa. aw.eata, :
se
v repoca
utw.4.1 MALA:144
fast up& :t 4 4.) .
fit 4r...*;4ot
CI.14111.114 L1344111L3
C Q L L
.3otiraup,
4141106 C C.
4$44-1 6 6 .6114
....TIIII1i.".. 11
!l
\ 1
1
i
-1-_
!!, (--
==
______ --
IN e ' s t e r n R o
0 ca,.%
--, a d ,
-'=.6
fr
l r_l
1 _, ._,
---, -1 .- V . ----
1
LH
:
\ !
- \
1
i 1
r
r- rti Hl__in -F
- 1
E
- -----
V-
.
---,.--
-..
--------- .
1 1
1
''-
_---
ik
;
I
it9
-'-'1
e \----- ,
- //
!
I
.
;
!
1
1
I
,
I -
,,
, , ..,.- ;
'
i
ma. ,
1
1
1
;
,
;
;
R
;
1
I
__
1
, ; ;
;
'
. ,
-
,
-_:!---..--
-, 7 - - --
,- -
1
_
- _ - -- eKS
-.,-, I 1
-_,.-
-----
r
.... sc,ile 7,0,
..
1-71 ".- ..
_-- -- - -
' \
__----
_ , _
'.. , a_
'Il
11
i i
1
--'
1c7c--r1
,
-
'11
' \
1
''' \
\
_-_ _J
\
,--
__ -.!'"',/
I \
\ .... \ ---7, ,
', 0\, \ -
l',
1',
\
'!,
\.
_--
__- -
1 T _ 4- -
- - - __--
'T"-
___ ,-------,__
..;
--------<----_,----------_______
--__._
' ' 4.,
'. -- - -. li ._
'
---_
__--
_L-
______
- / / CONNAUGHT AVENUE
I
- / ii ..C. /1
\\
I
\ I
.
- 6.-----
11
\ / / /
\ ,
\
I
. ... t
77-- --- ------- ------ -
).
Ci
,
46 .1
I
L /
... r-ss
\ /
ss Arsi ,-
7
/
- //. 4., /
I
T.-110
1
\
I
/
It
//
,../.-
1
,
1
lb i ii
' J la J
, /
COLAISTE na . hOLLSCO1LE
11,
// CORCAI
__.--
i
= : _ ________ - _____
- - ___ --- ___-__
,,
/ II/ i\
__-- _
14
1,1
i, -, UNIVERSITY COLLEGE CORK
e -__ _ ,_ r- -- rt-
,,
i
.; CI
---, _
,,,, /
---_ _ e _,
R
111 :11
0
- -
_
- "
a --' "
OVERALL SURVEY
.
PLAN
-----___
__ --,
r
--
its -17
I a
Ilepon No
Box No &8
ZAS
_13)
qIIII
.
S .,...
tf ,
scale:- 1 to 500 t
date:- MAY '77
drawing no.:- ,4
drawn by:- bw.
-SS
a., 7
[oo-52,5-1
0 0
0
Ivied! 1,auli
.b/1
A A
oStt 2-
"N
I 11-1
?5
Si/ 3
X121
-10 2611..,s
- 0 J
4 1
2/75 1/75 1/ 75 2/ 2/ 75 2175__ '2/ 75 Li/ j
1
1.5. ;
7 :rhwAse%
go.14114. 1.4
4. 4- 1347 - to o -1') -2 T -
- Sl-co .1
,2G 15 2; 21 I2'
2 . , ,
14'0 00 * - - 4.4.
41- $ 10).6 -21..
Card G 244, t .
3 10 75
+4- 0 tt ft.,.
2/75
8s. '8
.10 75
-S.*
242c
- -
-
a+ t
&mica+
[2°
222
3 ICRE.O.S a
4S1.7*757 '5
38" 33" 13445 39 52.4 l'ous ..A3 .45 22 3;,-;724-5
'i411 4-
f 4. 20 75 2.75 2/75 2/75 'I, 19 15 I-1/15
4
,c 3
411)
f t; 141. - Xi** 1 - v Iv? .4 0/ /oles- aenakt
:eve,
= 6:CS 7.
:*5
":> 257 45 2107 2,y7 1u6 29" '244i 29^ ^-:,,5 .29" "rrAti
C 44.9 5
75 1/ '5 ..tvo 17/7.1 1/75 1/75-' -16.0
- wetv/377
2, 1-
1/
*4s* 140 1-1 "1.
4 IV 3 - 3oco
Cowl. aqet Acx Lirft.I p(
/Yr 62162 two.
5014-NratAver /.1)
flA
.gas-
-
.
.15
:17 - 7 5 ,7.511g4",
I :VC.; ,
GLOVER SITE 1 i's,S'FIGATIONS LIMITED
CONTRACT NAME UNIVERSITY COLLEGE, CORK REPORT NO.
/-74(...1(
CLIENT ADDRESS
(111ADE GROUND)
J9.70
4.5
-Y"
Broken CARBONIFEROUS LLIEST011E CORE RECOVERY
50%
END OF B.H. 17.6 D0'l:71i
2--B. indicates Bulk Sample 6-N. indicates Number of Hay" per f:.
penerf 36011 ill the Standard pcLc-
3---W. ihdicm,s Want- S.unple I Test
.1
CORE RECOVEN:
Broken and Weathered CARBONIFEROUS
LIMESTONE
25
4.1
CARBONIFEROUS LIIESTONE
95%
END OF B.H. 7.2m DOWN.
.....
2-B. indic:u...'s Bulk Sample 6-N. indicates Number of bi.ws per it.
penctrzai;-) in the Slant o rAle-
3
95%
P..,
2----B. indicah.s Bulk Sample 6--N. inJicat.s Number f blows per fr.
pc.o.f.w.t.'ion in rho Stan,Lird ivne-
3-W. \VAL r S.11iIrk rrazion 'rest
TARMAC 0,07
15%
3.95
CARBONIFEROUS LIMESTONE
80%
r--
BOREHOLE DIA.
204mm. and N X . None
WATER STRUCK
METHOD OF BORING Shell & Auger, Diamond
Drill. STANDING WATER LEVEL
GROUND LEVEL ...... ............ ..... .
ORE RECOVERY
Broken and Weathered LIMESTONE'
10%
5.8
NOTE: 1-J. indicates Jar Sample 3 --- -V. indicates Vane Test
TOPSOIL
0.3
I Loose brown silty with some well
:T:ji:ID
J0.3
e'raled gravel, some boulders U(1.37) .
2.0 .
. ,
2-13. ithlic:11 Bull: Sample 6---N. l5--Sled R.,, Nuiltlx,r of blows p..:t fr.
p;E"Ootr".61/1 :11 il Stamlaril pone-
3-1.V. indicates Warkl Sample trati,m. Te.t
CLIENT ADDRESS
1 q r
lOREHOLEMD. 14 LOCATION As Plan.
Samples V W.I..
*
Newess and S.P.T. Tema
TOPSOIL 0.3
CARBONIFEROUS LIMESTONE
70%
ED OF B.H. 9.5n. DOWN.
.....
T
.
2-11. indic.:tes Bulk Sample 6.--N. tt!iclies Nui7,1)..r.r of Flows p,i fr.
rn:.trat;on. in the StaiLL!..!vi penv-
3---W. indicates \Vat,s Somph., tr.Ition Tot
TidirifiC
0.05 1....
GRAVEL FILL
005
J0.5
t/firm mottled groyror min sandy 0.(1.22)
SILT with some well orr.cled gravel .3.1 .7 .
J2.45
3.8
Weathered and broken B3.8
CORE RECOVTRY
CARBONIFEROUS LE-IESTOLIL1
15%
4.6
CARBONIFEROUS L110-11!013
95%
2-13. itc-itc Pull; Sattirk. C-N. indicates Number of Hows per fi.
penetration in d.c Stwh.J 11=N1C...
3---W, intlicati.:i i41:101) Test
47-U. indlc..v.es
4
.4
GLOVER SITE 1:',Ni'VtiST'l G ATION S LIMITED
CONTRACT NAME UNIVERSITY COLLEGE, CORK REPORT NO.
CLIENT ADDRESS el -7 Li
.........:
Progress
U Core, Vans
and S.P.T.Tests
TOPSOIL
0.3
Soft/firm brown sandy SILT wit7). some
J0.6
well graced gravel .
....,
1.07
Compact -,)urple/grey silty -
11.16(1.5
31.9
sandy GRAVEL
W2.9 .
N'.16(3.05)
3.5 _
J3.5
Compact purple/grey sandy fins /Medium H=19 {4.55)
GRAVEL with cobbles and some B4.9 .
boulders N.22(6.1)
B6.4
J6.5
.
E---.25(7.6)
II.23(9.2)
J9.45
If.16(10.7)
...-4,.
B11.0
B=18(12.2)
J12.5
.25(13.7)
B14.0
, .._
15.1 .
15.8
C1.RBONIITI2OUS .LIMESTONE
CORE RECOVERY
J15.9 KO 0.1wore
80';)
2--13. indicates Bulk Sample 6- Indic a.-5 Nttink.r of Hows per ft.
pc.,,ctr.ltiort in tho Standard pene-
3-- W. intlicato Water Sampt, tration 'rust
ADDRESS
5-14 401.
CLIENT
_._
TOPSOIL
O.3
31.0
Soft/firm brown fine sandy SILT
with traces of fino/nedium gravel, -
some boulders
1.65
--...-..----.-..-
CODE PECOI1ERY
C.E.R.D01=ROUS LIIESTODE
wy. ..
(..." ..
.
.
2-- B. indicates Balk Sample 6-N. indicates Number of Wows per fr.
penetration in the Standard pcne7
3_ kv. cI.:es Vais s
t ration Test
BOREHOLE 204mm.
DIA.
WATER STRUCK 3.0m. down.
METHOD OF BORING 51-1c11 & Auger, Diamond
Drill. -
STANDING WATER LEVEL 1 5m.
GROUND LEVEL .
down.
(LADE GROUND)
Grey sandy GRAVEL with bricks, J1.0
broken concrete, cinders etc. N.20(1.5) -'
2.45 .
.....,
Compact grey/brown sandy GRAVEL J2.45
with boulders W3.0
N31(3.05)
J3.66
N.30(4.65)
B4.55
N.30(6.10)
J6.4
N.28(7.6)
B7.6 .
8.1
Compact grey sandy fine GRAVEL J8.2
9.0
Compact grey well graded GRAVEL N.26(9.2)
with cobbles and boulders J9.5
N=70 for 3"
(10.7)
o-
,
J11.3
N=114 for 6"
(12.2)
1 2.5
50%
2-B. inetc.:te; &!k Sample 6--N. in2icates Number of blows per ft.
ivoctration in the Standard pone-
3--W. intlicatet Sainple !ratio Test
CLIENT
BOREHOLE NO..
21 -
---- LOCATION
ADDRESS
Ls Plan
(410
0.-.,
r.k , etc.
. . "
414
GLO ER SITE IN VLSTIGAT IONS LIMITED
CONTRACT NAME UaIVERSITY COLLEGE CORK REPORT NO.
TOPSOIL 0.3
20%
2.75
CARBONIFEROUS LIMESTONE
85%
END OF B.H. 5.8m. DOWN.
....
eir?oulders etc.
2.45
J7.9 N=17(9.2)
J9.5
N=20(10.6)
J10.9
r's 11.3
RECORD OF BORING
LOCATION
- L';'). O'COtinoi.i. 1., *if url «oy t7. C . . il;XteJat:11',11 Site
,CE LEVEL - BORING NO.
I.' __5
,
,ORING LINING TUBES
Shell and Auger tt
itTER OF BORING
6"
,$CLINATION DATE STARTED
1st t , )(.,2i
from
to
0' 0" - - '.'ri s Curbed
_ _ _____
- - - . - __.
.. _
._
) _ .
.... - ._. _ .
- _ . . . _ . _
61"c\6411 Signature
-1.1( a
,
SONS LTD..- Contra- u5 ..
.
5TIGA1iON DEPT. '-.
Telephones 24371/2/3 DATE
,igT, CORK . .
..
7,-,., -:.
i .
LOCATION
rrOR
.tne
,..
6 srs . 0 'C 0011, tt nariey 1.7.C.C. 13xten:;4on 3ito,
,,..AND SURFACE LEVEL . ..,-.:.".., . BORING NO.
... .. . .4" . ._
1
TYPE OF BORING", 0`' - LINING TUBES
Shall and Auzer 6"
DIAMETER OF BORING
V 6"
-
INCLINATION DATE STARTED
i'1 th ";. 1 , 19614.
BEARING
"
COMPLETED
17 Ll Aii 1, 1964.
113. Samples
Depth
Description of Strata Below Thick- Level of .Ground-Water Observatio,
ness Lower O.D. of
Surface Contact Type No. Sample
rota
.
to 1; - isturl)ed
...._
oil-
Ii or 1, clay & stones 2'0" 2'0"
toft
mind
-......--
v k!ry herd. Rock chi s , 1 roqui red t open ..1 I.r.k. ..t e hc',..e, 3 i
.------- . - --
1
1.0Ccl i. 4 0'1 0 r little. was form I t( JS_ on___01. L_ r,.,u 'tilt t,.11 and az--:, . io,'Qii. :::i_'_ .t.o :7..
.
. .
_ . .
C Signature
iY & SONS LTD., Contractors
/IGATION DEPT.
. -
RECORD OF BORING
) OR
'±i,j4144,4a. COni141.1 A ItLiriezty
LOCATION
U.c c. 11X I, l? I i1 L-
---__
1.:11,)rt
ND SURFACE LEVEL BORING NO.
/- --`,PC" -
4,..k f
Ca:63 2-2-
/YPE OF'130RING LINING TUBES
Shell and riu6or 6"
DIAMETER OF BORING
6"
INCLINATION
BEARING
DATE STARTED
COMPLETED
1.1-1 ' i 1, 1.'164.
tt
xtet.._. _
_ . . 2 '0" 1' 0"
D ).1 I On 332 9 1,,,. (-1.T-
Jaen--CaAL-Yd.ilil Ilr Liken D 1).
.11_hi_s_o 1 "-equi rod to nonot rate 1 a-er of br:1 ioiC 3 t 0 r10 .1.-"....1: .
.
.. _.
..
-- - - -- ._
Signature
SITE INVESTIGAtIONS LTD.
SOIL INVESTIGATION 77 cf2g
BORING RECORD
TRACT a. BOREHOLE No.
i ,
45
rt No. Order No.
I for On L91.1W, Uhadwick or.t14.
address
g Commenced ?r) .1.197.6 Boring Completed 1 ) ? r!
ad level O.D.
;Struck (1) - (2) (3)
iog Water Level
iks
otor rn Lorn JcIL nt 3m. U.t;.L. Ail 1. rash ! orn Intnd to
1round Invol.
Depth Samples
Description of Strata I Thickness
- Front To Ref No. I Type Depth
LI
ill lin] nr L.1 ay', stones,
;tc 3 ''1
`).30
tk.
I.
j6AT10 N DEPT.
Telephones 24371/2/3 DATE
.; CORK
RECORD OF BORING
LOCATION
IrS . Connell . Harley
mr.
Depth
GED. Samples
Description of Strata Below Thick- Level of Ground-Water-Obsen at:,
ness Lower O.D. of
Surface Contact Type No. Sample
f rota
to !: z:- Distrul,r6
) ' 0"
.1 of rublole and o t,one7,, 2' 0" 2' (i"
vom 3,0
..ni.
7,6
3d rock 8'6" l'(," 8,r,"
,soil _proved too soli d for !- ring- ri (;., ;u!)0,-, were w 1,1,(1r, wu .;".1 oxcay.: '7 '
by
ri od out; Land r
I
kick surface was (Ix: ()sod.
)
.._
-- . -
(tar Signature
GLOVER Siff INVE;::TTIGATIGNS LIMITED
CONTRACT NAME UNIV3RSITY COLLEGE, CORK REPORT NO.
2-B. intliz.:4,:s Bulk Sample 6-N, indicates Nt!itthcr of blows per ft.
penetration in the Standard pent.-
3--W. it docaws Wates Sainpie Ellen IOU TI.,A
RECORD OF BORING
LOCATION
4 1.0 C) C OrtfilU 11 11. 'Burt oy 1. .C ;:xt.....1; t,4 1 (lit Situ
tiFACE LEVEL BORING NO.
6 6:06S2.4.,
dr' BORING 'V LINING TUBES
_ Shell and Auer 6"
i/ANXTER OF BORING 6 to
INCLINATION DATE STARTED
' , ..
`6'
BEARING COMPLETED
_5 th 1964 .
Depth
0.B. Samples
Description of Strata Below Thick- Level of ,Ground-AVaterObservati.
O.D. of
,
Lower
£1' 01.1
Surface new
--.
Contact Type No. Sample
to ,-,
.,/ - --d. st-.1r1)e.;
0' 0"
'1. 11 Of clay and stones .2'0" 2' 0"
2 r0"
1r Own clay and stones _.... - 0" 21' O'
21' EL e3i 0 -
_ kiLL.:- i) -1-,
.._
)
_
._ ... _..
. _
- --
a-VA-14( Signature
NOt '
RECORD OF BORING
;et
LOCATION
,oamra. Hurley
WCAWnto11-01,we-v*14g? .
11.0.0. 1::Xtrt!1:i I call. Site
.-/ACE LEVEL BORING NO.
1, 4,
7 6.5sz--7
/BORING LINING TUBES
Trial'(Trbncllas
4,LETER OF BORING
vial Trenches - tak,n out ' 9 ascii, or, co.-1)lete(1 Ily hand a!-1,1, in the ca.'y
1 - 2' of bull: -fill, fol owed 1»- 4 ?"1-,' of clay kind s Lou ...; roll. owed by
2' of broken rock tli.th soild iock at .),' tl" 'If, 1.:),,. 2 1.. _
). 2 - 3 6" of back-fill, followed hy :e 6" - clay and Si. ,a,- :-. , followed -
.
r.t..,H3 2 ' to 5' br.s.low 71. L.,. - --
. i
.1 - 1' rubble
or...__ hack-rill _ __,__1
On!: , a s. l id- t-,Loni, - sl-.th 2" t.1.'
.. .
-7, , Collow,':
by 4' or clay and st ones, fo lowec 11:, , cal _
i
..
ro-
. .
,; ;It 1-; - ' --a 1. I. .
.
3 5 -. ..5' 6" of brown clay and .5 t>; s,r, 11 ow,!(1..., 1,./.. n?_ v (7 _c
'_!..'
11/....t..-ri. lc!: ..
. 6 - 31 of ,40k -fill, fol I owed b 19' or !-L own ^ I a,-1,1 .-, t ., , foll.p-,,,:,
.. .._....___
7 - 6' of Twovvn __0 lay i3nri :it. unk,',,s- _r91t ,,1,111 ' -lid 1.:)01, ;ii 2,,:, 1
C; . . ,
Signature
-N 1,!
P- J. fiEGARTY & SONS LTD., Site Investigation Dept, Leitrim Street, Cork
S.P.T.
Soil Reduced Daily ?slue
Strata Description Depth
5arnple Level Progress . N
4'-0"
I
r . . ',`'
. Ps.
9' - 9" Brown silty cloy with sand,.: ,-----x:
-(7- -
_ -0 -
gravel and cobbles.
;
: _
.
I"
I
.
,
.
-
-a:_--..i.--:-.
..-
,
.
. -.....f---
.
25/1/68.
. ---;----":
' 4, jr .
ZI
.. IPA.-- ...--
,
..
4.--;42, -0-' 'Il 3-1-9" .
R,
5" Limestone rock, penetrated 5" 26/1/66-
using rock chisel for 5i hours.; .1417217 . . .
: .,,
.,
,.
.
.
. ,
.... ,
.
.
.
-
' ' .
.
, ,
,
, .
.
.
.
. .
.
.
.
. .
.
. ,
-
.
.
.
.
hives igation .
(57t - ,5,333
(13) .
' .
. . .
.
.
. .
-
Water Standing
Date Encountered Water Level Sealed .
'
Bulk sample taken.
(Dwo
- ..
0 us Fragmentary sample taken.
.
A Water sample taken.
.
_ ' .
Drawing No.
844/1.
.' J. , E.:'7!:.aN,f; LTD., aitz , ;:;;, s, 1I Stce0, cock
.,-ivers;tv Cork.
.f,
Co;
Total Casing
6 311
!. e. 42/
Total Depth of Hole
ci A;,ge.r,/" Date Starting
Li. .,...(ter of Fro le: 6" Date Finishing d.
1 2...
Deccriptiuti
Sv: I diced Daily s.
Sty. Dept!, I. va.,.:
Lcvci Progress *r.;
1
1
1
I ; !
- -
21,
bcd,-ack, I
al ' rti
RC.k ch'i<Jcl for L.
t.
' e
1 4;1 i r
li
: ...'. . 1 .. 1
ii . C tft!..1-!,
i 1
I
tet7e-ere.
:t
r 11
takou.
S44,/2.
,,... 40'
J.
'
IILGAKT% & SONS LTD, Site
ONOVAIIIIM NOY
' atioo Dept., Leitrim Street,
e
"==:-....A=sistilMONICO1=101
. P rilrfeirir* . T44e: C
S..P.T.
Strata Description Dards
Sod Reduced o.,, value
Sample Level Pn,grees '
. 4'-O"
21/1/6
- 9'-O" Brown silty cloy with sand, -
3
...7-",-.:_.
-c_-,77-
}! -- 30/1/6E
irel:
3" Limestone, bedrock penetrated C=C- 43' -0"
3" using rock chisel for 2 hours.. 13'.:3"
f t'
4 t
Ji
Groundwater Conditions Depth of "Undisturbed" sample taken.
Casing when
Water Standing
Date. Encountered Water Level Sealed
G. Bulk sample taken.
/P.
0 " Fragmentary sample taken.
- -
Collabe, Cork.
flAcc: Total Cas.,..
6633)
4 3
Total Depth of Hole 1,
- 2"
4,4(1 A .411)- Date Starting
.1)
151-0"
I : .... :: I
'''t , '
-
',..bt: '....tersity College, Cork.
C
:;.3,11..-.1.3 11( L:rt,Ilee: Total Casing
..
' -0"
I -
/
I
Mode ground with large boulder .
/
I ,
obstruction at 6'-0" i
,._...
I
31/1/68.1
1
t
t
9'-0"
1-(:)" Brown slily clay with sand, 1/2/68.
i
10,-0"
avl arid c.,./Q
t..1 .
I
I
I 1
.4111117.11Vt4trr (1,10411.4i%
ss ssi.ss,d1n. tak,t,
Vi.;,tvr
Dat, ,;!;;, ,
.
tt;!0 ttat,ett
taktm.
47
CLIENT ADDRESS
LOCATION As Plan.
BOREHOLE NO. 1
..,
Loose mottled grey/brown silty fine
SAND with traces of gravel and
fibrous organics
J1.5
J2.75
B3.0
N=8(1.2)
N=14(2.45)
3.95
Purple/grey compact sandy well graded W4.0
sandy GRAVEL with cobbles and some
J4.3
boulders N=16(4.9)
B5.2
N=20(6.4)
J6.7
N=26(8 2) 1
J8.5
9.a
RECORD OF BORING
LOCATION
''oi144143.3 .lay . I: , &
BORING NO.
1 6=6 32-6_
t.
LINING TUBES
She and Auger 6"
ri of BORING
.
6"
%,ATION DATE STARTED
2 c.d. .1;- 11, 1.264.
'TEARING COMPLETED
2,,t1' 11 st
1
aost One
,
V;k0"15'6"
t76"'
' -
- D c..,33 12' I c1,),,,' '1.1,..
.
....1
.
.
. .. _ -- .
-----
. .
.
.
- - -
. .
__ ------------
.
.
..___
. .
..... _____ .
__. _.........
.
Signature
ti
. J. ,3 sONS La0%, . n
1/2/68.1
n II 71-0"
i.vow. silty clay with sand,
gavel and cobbles.
2/2/68.
I4'-0"
:4" Limestone bedrock: pan,:
3" usLj rock For chil 2 boors.
. ...a...um...
Cf ilWINVittqf
1
03:1(1411.. !I
.- -.d" arollie t.
11%.01" tit
l)ate E:tt.'4111;1.t.t V I A ; 'N. 1
_ -
.
. ...t4.4.le taken,
Zi
, r i4topie taken.
11
14/6.
GLOVER SITE INVESTIGATIONS LIMITED
CONTRACT NAME UNIVERSITY COLLEGE, CORK REPORT NO.
204mm. and NX
BOREHOLE DIA.204mm.
WATER STRUCK None.
MfiTHOD OF BORING Shell & Auger, Diamond
Drill. STANDING WATER LEVEL
GROUND LEVEL .
TARMAC 0.07
N=11(0.75)
J1.1
N=14(2:0)
J2.6
2.75
CARBONIFEROUS
. -
LIMESTONE
7.9
- - .
10%.
W.
END OF B.H 11.0m DOWN.
2-B. indicates Bulk Sample 6--N. indicates Number of blows per ft.
penetration in the Standard pcne-
3--W. indicates \Vt,..r Sample tration Test
BOREHOLE DIA.
204mm. and NX.
WATER STRUCK
METHOD OF BORING Shell & Auger, Diamond
Drill, STANDING WATER LEVEL
GROUND LEVEL
Description of Strata TX pi h
m,
Disturbed
Samples
mic
(% ) Wn*
W.L.
.L.
Daily
Progress
U Cores, Vanes
d S.P.T. Tests
TARMAC 0.07
CORE RECOVERY
Broken and WEATHERED -
CARBONIFEROUS
LIMESTONE
15%
4.1
CARBONIFEROUS LIMESTONE
80%
.
END OF B.H. 7.1m. DOWN.
2-B. indicates Bulk Sample 6-N. indicates Number of blows for ft,
pent-Jr-a:ion 1'1 the Standard pene-
3-W. nniicatcs Water Sample tration 'Fest
CLIENT ADDRESS
Cti k4 1g
Plan.
I
TOPSOIL 0.15
70
._.
NOTE: 1--J, int ic.sus Jar Sample 5-V. indicates Vane Test
t.----
CLIENT
BOREHOLE NO. 2
ADDRESS
LOCATION AS plan -
9-7 ca.t,
-
BOREHOLE 204mm. and /iX 3.0m. down.
DIA.
WATER STRUCK
METHOD OF BORING Shell & Auger, Diamond
Drill. STANDING WATER LEVEL 2.5m
GROUND LEVEL
REMARKS: Used Diamond Drill from 10.4m. down. Used chisel for 4 hours on
boulders and rock. Diamond Drill used from 9.5m. down.
boulders B6.7 !
7.0
. 150
4--U. tircf.,tt;rf:e..;
SITE INVESTIGATIONS LTD.
SOIL INVESTIGATION 9' 7 (i
BORING RECORD
NTRACT U . I.. BOREHOLE No. 141#
,ort No. Order No.
ed for DQ Lmiw, Lhailwiak, othEriclia.
Address Coro<.
ing Commenced 2 1. 1. j. 97r, Boring Completed J./ . . rir).
e of Boring rt9rin Diameter of Borehole mm.
and level O.D.
er Struck (1) - (2) (3)
ding Water Level -
arks at
1:,nr Cairn 1,)$it Jell Llin. 1U.1 lovf1157 Til;t ' Lo roam
Depth Samples
Description of Strata rhacknewt II
From To Ref No. Type Depth
!uck
III
.....T
d level O.D.
Struck (1) (2) (3)
og Water Level
0
;11..i.ng or clay', s Locos,
t.l it)
T ,1,..
Colk,:je, Cork.
97
.
2-c2
ROI Total Casing
:
S:.1,1 Daily
Strata Deseriptical Depth
evd Progress
7/2/68
61-0"
6'-6" Brown silty clay with
sand, gravel and cobLles.
2/A
I
2'-G Limestone Leciroci oera
3" u.5.irlrj rock chi:,(11 2 hoJrs.
12/4Sia.
penoic.tcd P-9" Lis70, rotor>,
with 5 core recover/.
-
Groundwater (7ondititffis Dvi.h. of
;
1
I
fi. t.<1
Ca..i:titt
WAter Statodililf 1;
Darr i
rocounWroet lt'riter :I;c0ed
i
11
I - '
takvo
- ;
'i
j
I
. k
Atli' If LTD., ::*.; :'.on D . ;11
-- C 1'7?
4.?:, 5-(:)ik:,c37
.'
Cork.
Li,:-:ivnrsit-/ College,
'174 i7
CS,
I S.P.T.
3o:1 ;teamed i Daily
.ii:
1
Strata Dciscriptioli Depth value
nap. Level Progress = N
5/6/64.
J1-6" td, slit,/ clay with large ,
amount of sand ia
with cobbles.
Lir)vistonc bedrocl,
using i ocl-. chisel i-or 2 hour..
I if
it
t,
.10
. & SONS LTD., 5-.1%; F.oz :), ' St, C
r.',orchc;1.t
University College,
nc:srcrice:
Cork.
Total Casing
914/
;rolind Level: ' Total Depth of Hole II - 9"
slitA and An/P'.'. Date Starting `/2 .68.
iii.-nieter of Hole:
6" Date Finishing ; 2. 08.
S.P.T.
Soi. dnecd I Daily
aily
Strata 1)eseriptioll Depth valtc
3altir fievel Progress
= N
-travel.
sihy clay containing sond,
' 8'4"
grovel and colj:!..:s.
-
1
3...2/681
3 Link. tune becirool;' peneltc.,L.,: 3"
..,sing rock chisel for 2 hauls.
0 i
^ _ .
3
Crvtit.
,
, . ' tatatit
tt
i ' .
I
i i ..;;, :, f ' $1::: $ V ' 7/7j104)ki t$J.
$
7 i
.$
. ...'
-
JU tuke.o.
$
1!
!!
2.'" .1. /7
GLOVER SITE IN VESTIGATIONS LIMITED
CONTRACT NAME UNIVERSITY COLLEGE, CORK REPORT NO.
CLIENT
BOREHOLE NO. 3
ADDRESS
LOCATION As Plan.
91 -tv) (
-
BOREHOL' DIA.
204mm. and NX . 3. 8m. down.
WATER STRUCK
METHOD OF BORING Shell & Auger, Diamond
Drill. STANDING WATER LEVEL 2.45m
GROUND LEVEL down.
_.
TOPSOIL 0.23
B5 . 2 ,
5.5 J5.5
80%
END OF B.H. 8 . 9m . DOWN,
FFt
2;--B. indicates Bulk Sample 6-N. indite ".S Number of blows per 1: