You are on page 1of 10

PROJECT: EF-1902

PROJECT DOCUMENT CONTRACT NO: 14050489

REVIEW I COMMENT SHEET NEW GATHERING CENTRE, GC-30 IN


.o..,..:.,.,...~~~.:..A...S,..!.~
NORTH KUWAIT
A ~ · -·.;,,Nt>I~LOW..UP• If't"....._,.,.c.,, "'~

EF 1902/GC30/LNT- I Date I Date


Transmittal No. : 02-Jul-15 05-Jul-15
KOC/D-1856 Issued: Received: I
Document No.: See Below I Revision : A I Return See Below
Code: I
Subject: See Below

Reference Company Response


50489-530-450- Procedure for Material Control
PR0-2100 Comments.
Return Code 8 1) A check analysis for annular plates and shell plates shall be conducted as
per clause 7.4.2 of the company standard KOC-MV-007. Contractor shall
include this test in addition to visual inspection of the plates in the format of
receiving inspection report.
2) Material shall be new and shall not have suffered undue deteri oration in
storage or transit. Any substitutions shall be agreed in writing by KOC before
any procurement or fabrication commences.
3) Shell and annular plates shall be marked in accordance with the relevant
material specification by the mill by die stamping. Other plates may be
marked by stenciling when perm itted by material specification.
4) Is there any separate procedure to address the technical requirements of
material as per KOC-MV-007 clause 7.0?

50489-530-450- Procedure for Welding Control


PR0-2101 Comments.
Return Code 8 1) The shell to bottom joint shall be made with a minimum of two weld passes
on each side of the shell. Each leg of the finished weld shall be of equal
length.
2) The bottom rectangular and sketch plates shall be lap welded with double
pass fillet welds to provide continuous drainage to the periphery.
3) The shell vertical and horizontal joints shall be double butt welded with full
penetration and fus ion.

50489-530-450- Procedure for Fabrication, Erection, and Testi ng of field Erected storage
PR0-2105 Tanks
Return Code 8 Comments.
1) WPS shall be submitted together with weld map
2) Details of back welding run and its welding parameters shall be indicated.
3) During tank fabrication and erection all field activities shall adhere to KOC's
fire and safety regulations and its health, safety and environment policies.
4) Primers applied principally to protect plate's surface and shall be locally
removed by grinding or brushing prior to the welding of attachments etc.
5) The shell to bottom plate weld shall be wet magnetic particle inspected on
the inside and outside, after the first pass each side and after hydro test on
the completed welds prior to lining.
6) When nozzle neck are fabricated from welded plate, the longitudinal weld
shall be 100% radiographed .
7) Typing error in EDDITION in clause 5.12 is to be corrected .
8) Most of the attachment pages are not legible.

050426-0000-DAOO-FRM-0001 Rev A 1 Paae 1 of 2


PROJECT: EF-1902
PROJECT DOCUMENT CONTRACT NO: 14050489

REVIEW I COMMENT SHEET NEW GATHERING CENTRE, GC-30 IN


.0...,..:..,..0~~ ............... ~,....:.-!
NORTH KUWAIT
A.Subt'" •OV nt>!uw!l!t Ptt!f't · IW·~ Coro"""l<>~

I ~:~:ived:
EF1902/GC30/LNT- Date
Transmittal No.: 02-J ul-15 I 05-Jul-15
KOC/D-1856 I Issued:
50489-530-450- Procedure for Post Weld heat treatment for storage tanks
PR0-2106 Comments.
Return Code 8 1) In accordance with clause 10.10.2 of the company standard KOC-MV-
007 clean out door and other assembly requiring stress relief shall be
furnace heat treated as per API 650.

50489-530-450- Procedure for Nozzle reinforcing pad weld leak test.


PR0-2107 Comments.
Return Code A No Comments

50489-530-450- Procedure for Radiographic Examination


PR0-2110 Comments.
Return Code 8 1) When two or more type of weld defects are present in the same
radiograph whose extent equals the maximum acceptable limit for
both, the weld shall be judged unacceptable.
2) Exposure conditions shall be attested in the report by the organization
responsible shooting the radiographs. After interpretation and
checking by ASNT level 2 or 3 qualified operator, all radiographs
complete with report shall be subjected to KOC review and
acceptance.
3) Suitable viewing facilities shall be provided and a calibrated
densitometer shall be made available.
4) Location for spot radiography of horizontal seams and random
radiography for vertical seams shall be selected by KOC's inspection
representatives.
5) Please see the Clause 12.2.2 of KOC-MV-007 and attach the
approval to use Gamma ray.

50489-530-450- Procedure for Ultrasonic Examination


PR0-2111 No Comments.
Return Code A

50489-530-450- Procedure for Magnetic Particle examination.


PR0-2112 No Comments
Return Code A

50489-530-450- Procedure for Liquid Penetrant Examination


PR0-2113 No Comments
Return Code A

Name Discipline Date: Signature


Welding Inspection
Prepared by: Somanathan
Engineer
21-Jul-15
~
1> · ~ ·
Reviewed by: Nazir Hajar Lead QA/QC Engineer 21-Jul-15 -.- ,..._
\' ... . l. ~\ I

Approved by:
M-L!\y fe:---l ? Z-1.( r· ~Wlv
1.)

050426-0000-DAOO-FRM-0001 Rev A1 Paae 2 of2


':!; .,.

Page No: 1 of7


KUWAIT OIL COMPANY {K.S.C.)
A Subsidiary of Kuwait Petroleum Corporation Date : 09-June-2015 Larsen & Toubro
KOC Contract No Company Doc No : Rev

14050489 Project Title


1 - - -- - - ----i NEW GATHERING CENTRE GC 30, IN NORTH KUWAIT
Contr. Doc No.: Rev
KOC Project No. :

EF1902 Document Title : 50489·530-450-PR0-2107 A


KOC Doc No.: Rev
Contr. Job No.: PROCEDURE FOR NOZZLE REINFORCING PAD WELD LEAK
TEST
5026
Facility No. Equipment Description : Equipment Tag No
GC-30 NA NA

KUWAIT OIL COMPANY (K.S.C.)


LARSEN & TOUBRO

~ A. Approved I RO":iG-wod
rg/ A. Approved I Revwwed
0 B. Approved I Revic\'I'Od as t.cted 0 B. Approved I Reviewed as Noted
: =~ral'• nnd R~submi: Incorporate and Resubmit
0 C. Reiectcod • Rewi'Jnit 0 C. Rejected • RGsubmit
0 D. Jr~•,,rrr.. ,Jion Reviewed 0 D. Information Reviewed
Approval conveyed herein shall in no way relieves
Vendor of his contractual obligations and his
responsibilities for correctness of dimensions.
material of construction. weights, quantities, design, Approval by the Company related to the Works
detail assembly fits, system performance shall in no way relieve the Contractorfrom its
requirements with all the contractual requirements obligation to complywith the requirements of
of the P1.:1rchaser. \1 the Contract'.

I O~TE I
1
NAME I
REVIEWED BY
SICNA"ro- :r:?:rBys ~--- -

PROCEDURE FOR NOZZLE REINFORCING PAD WELD LEAK TEST

LARSEN & TOUBRO LIMITED


Larsen & Toubro

:~
Heavy Engineering Industries and Shipbuilding Co.K.S.C.(Public)
P.O Box 10155,
Shuaiba 65452,
Kuwait
HEISCO

/
r A /~.
A Issued for Review/Comments PM .:;{ l QCM jOM 09-June-2015

REV. ISSUE DESCRIPTION PREPARED CHECKED ~PROVED I DATE

50489-530-4)0-PR0-2107(TWI 1008-6530 12) Rev.A 09-06-2015