Work Program Overview and Planning

This document provides an overview of the types of work programs submitted for construction projects and the requirements for developing an initial work program. It discusses the four types of work programs: initial, accepted baseline 1, updated, and revised baseline 2. The initial work program must be submitted within 14 days of contract award and can cover the first 3 months or entire project duration. Planning involves breaking down the work, zones of operation, interfaces between disciplines, and strategies for efficiency. Scheduling determines activity start/finish dates, durations, sequencing, responsibilities, and reporting formats. The document provides examples of forms used for work programs in Malaysia.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views8 pages

Work Program Overview and Planning

This document provides an overview of the types of work programs submitted for construction projects and the requirements for developing an initial work program. It discusses the four types of work programs: initial, accepted baseline 1, updated, and revised baseline 2. The initial work program must be submitted within 14 days of contract award and can cover the first 3 months or entire project duration. Planning involves breaking down the work, zones of operation, interfaces between disciplines, and strategies for efficiency. Scheduling determines activity start/finish dates, durations, sequencing, responsibilities, and reporting formats. The document provides examples of forms used for work programs in Malaysia.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

FOLDER 1:

OVERVIEW OF WORK PROGRAM


DEVELOPMENT

1
Type Of Work Program

1. Initial – program kerja yang dikemukakan untuk


kelulusan
2. Accepted (Baseline1) – program kerja yang telah
diluluskan bagi tujuan pemantauan projek
3. Updated – program kerja yang dilaksanakan
‘tracking’
4. Revised (Baseline2) – program kerja yang
dijadualkan semula disebabkan perubahan skop
dan masa
2
Initial Work Program

 Contractor shall submit an Initial Work


Program to the S.O within fourteen (14)
days after the date of the Letter of
Acceptance.
 The Work Program can be the first three
months or the whole project duration.

3
Initial Work Program
 Program kerja yang disediakan oleh kontraktor dan
dikemukakan untuk kelulusan Pengarah Projek/
Pegawai Penguasa (PP);
 Kontraktor boleh sediakan:
Program kerja secara terperinci untuk 3 bulan
pertama dan aktiviti selebihnya pada tahap
deliverables; ATAU
Program kerja secara terperinci daripada awal
hingga akhir projek.

4
Planning Vs Scheduling...
...involves creating project development strategy, which
includes:

1 - how works will


be broken down
for control
2 - zones of
operation and
their interface

4 - Interface 6 -maximize
The strategy to
between the
various
disciplines or efficiency of cost
trades and time

3 - how to manage 5 - Construction 7


project activities method 5
and resources
Planning Vs Scheduling...2
a. is a mixture of art and science,
Scheduling b. involving interpretation of the results of project planning
by using appropriate software tools and techniques to
ascertain;

1 - Start and finish


dates of activities

3 - Method of
activities sequencing 5 - Communication and
reporting formats

4 - Who will perform


the activities

2 - Duration of 6
the activities
Keperluan Menyediakan Program Kerja
 PWD Form 203 (Rev.2007)

 PWD Form DB (Rev.2007)

7
Latihan 1 : Penilaian WBS