You are on page 1of 5

LARRY LAYAR

larrylayar.2021@gmail.com
Equatorial Guinea

PROFESSIONAL SUMMARY
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Over 18 years of experience in Piping in the related field of engineering procurement in


construction for different piping systems, heavy steel structures, and equipment connections, with
extensive executive supervising and coordination skills. To obtain a Piping Supervisor position
with a team-oriented company where I can utilize my skills and knowledge to help the team
achieve its missions and objectives; where advancement is based on achievements and
dedication.

WORK EXPERIENCE
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Piping Foreman Jan 2023 - Present


Electrical Mechanical Civil and Construction Group Services • Punta Europa, Malabo

Expediting materials, planning, erection of panel wall boiler tube, erection of backstay and
installation, erection of connecting pipe, building and fit-up install drain line and vent line, erection
of main steam line, fit-up, alignment, installation guide support, hanger rod, spring can support,
alignment.
Piping Supervisor Jun 2022 - Jan 2023
Connex Technology and Industrial Services • General Santos City, Philippines

Expediting materials, planning, erection of panel wall boiler tube, erection of backstay and
installation, erection of connecting pipe, building and fit-up install drain line and vent line, erection
of main steam line, fit-up, alignment, installation guide support, hanger rod, spring can support,
alignment.
Piping Supervisor Feb 2018 - Jun 2019
CN ELECO Engineering SDN BHD • Pengerang, Johor, Malaysia

Assisting, with fabrication works, piping, and structural form. Lay-outing, reading of plan, material
supply, and line checking. Performed layout work and projects using blueprints, drawings,
sketches, and specifications.Welded metal parts using shield metal and flux-cored arc welding
equipment.Developed patterns, cuts, layouts, and other technical projects.Maintained daily
preventive maintenance.
Piping Supervisor Apr 2016 - Dec 2016
Inbang Industrial Co.,LTD • Turkmenbashi, Turkmenistan

Cutting, repairing, and assembling of girders, beams, columns, and other building components to
form complete structures and set up welding equipment in order to ensure efficient project
completion.. Planning, pre-commissioning, blinding for air leak test and air blowing. De-blinding
to return the line into normal. Material preparation, pipe erection at exact location, line checking,
punch listing, pushing the worker to finished their job and tool-box talk every morning before
proceeding to work.
Piping Supervisor May 2014 - May 2015
Inbang Industrial Co.,LTD • Aksholak Town, Kungrad Region, Karakalpakstan, Uzbekistan
Planning, pre-commissioning, blinding for an air leak test, and air blowing. De-blinding to return
the line to normal. Material preparation, pipe erection at the exact location, line checking, punch
listing, pushing the worker to finish their job and tool-box talk every morning before proceeding to
work.
Piping Foreman Jan 2013 - Nov 2013
GS Engineering and Constraction Corp • Ruwais Abu Dhabi, United Arab Emirates

Expediting materials, planning, erection of panel wall boiler tube, erection of backstay and
installation, erection of connecting pipe, building and fit-up install drain line and vent line, erection
of main steam line, fit-up, alignment, installation guide support, hanger rod, spring can support,
alignment.
Piping Foreman Oct 2011 - Oct 2012
Daewoo Engineering Construction Co., Ltd. • Arzew, Algeria

Expediting materials, spool checking, planning, erection of spool at the exact location, spool
alignment for exact coordinates as per isometric drawing, line checking, material request, such as
fitting valve, bolt, and gasket, bolting, giving information, instruction, and training to the workers.
Piping Foreman Oct 2008 - Mar 2011
Keangnam Enterprises, Ltd • Madagascar, Madagascar

Expediting materials, planning, erection of panel wall boiler tube, erection of backstay and
installation, erection of connecting pipe, installation and fit-up install drain line and vent line,
erection of main steam line, fit-up, alignment, installation guide support, hanger rod, spring can
support, alignment.
Pipe Fitter Jul 2008 - Oct 2008
Bee-Mec Engineering and construction SDN DHD • Sarawak, Malaysia

Fabrication of spool big bore and small bore as per isometric drawing at the fabrication shop,
shutdown: lay-outing for tie-in-point, cutting, grinding, beveling, fit-up. Tracing of spools,
expediting of materials, line checking, erection of stools and pipe shoe supports, pipe guide, axial
support, pipe hanger, spring hanger, spring support, dummy support, trunnion support,
installation, fabricating small bore, erection, and installation of pipeline and pipe support, bolting
torquing of the bolt, punch listing.
Pipe Fitter Jul 2007 - Jun 2008
AL SUWAIDI • KSA, Saudi Arabia

Tracing of spools, expediting of materials, line checking, erection of stools and pipe shoe
supports, pipe guide, axial support, pipe hanger, spring hanger, spring support, dummy support,
trunnion support, installation, fabricate small-bore, erection, installation of the pipeline, pipe
support, bolting torquing of a bolt, and punch listing.
Pipe Fitter May 2006 - Jun 2007
AL SUWAIDI • KSA, Saudi Arabia

Threading of spools, nipple 3/4”, 1” to 2” galvanized pipe at fabrication shop area, erection of
spools 6’ main pipeline at combinair, installation, fit-up, installation of pipe support, lay-outing,
installing of branches lines sprinklers, cutting, beveling of tapping line for tie-in-point, permit
receiving.
Pipe Fitter Oct 2005 - Mar 2006
AL SUWAIDI • KSA, Saudi Arabia
Cutting, beveling, fit-up fabricating of 36” and 30” pipe heavy wall and fabrication of a small-bore
line at fabrication shop area, erection of pipe spool, pipe shoe, pipe guide, fit-up, and full welding.
Cutting and beveling of tapping line for tie-in-point, hydro testing at the site. Demolition of 12
tanks by cutting outfit set, demolition of pipe by cold cutting, fabricating, a fit-up pipe at fabrication
shop area for pipe re-outing line, erection, fit-up, alignment, lay-outing of pipe at site, blinding,
water flashing, install balloon, mechanical plug, mudpack gas testing for cutting, beveling, fit-up
and full welding of the tie-in-point, hydro testing of new pipeline and old pipeline tie-in-point, de-
blinding, install a new gasket, bolt tightening of pipeline to back on service, permit receiving,
housekeeping.
Piping Foreman Sep 2004 - Oct 2005
AL SUWAIDI • KSA, Saudi Arabia

Demolition of 12 tanks by cutting outfit set, demolition of pipe by cold cutting, fabricate, a fit-up
pipe at fabrication shop area for pipe re-routing line, erection, fit-up, alignment, lay-outing of pipe
at site, blinding, water flashing, install balloon, mechanical plug, mudpack gas testing for cutting,
beveling, fit-up and full welding of the tie-in-point, hydro testing of new pipeline and old pipeline
tie-in-point, de-blinding, install a new gasket, bolt tightening of pipeline to back on service, permit
receiving, housekeeping. Erection, fit-up of the big bore and small bore pipe at area 61
expansion, installation dummy supports, trunnion supports, pipe hanger rod and pipe supports,
cutting, beveling, fit-up fabricate, alignment of small bore pipe at fabrication shop area, expediting
of materials.
Pipe Fitter Mar 2004 - Sep 2004
AL SUWAIDI • KSA, Saudi Arabia

Erection, fit-up of the big bore and small bore pipe at area 61 expansion, install dummy supports,
trunnion supports, pipe hanger rod and pipe supports, cutting, beveling, fit-up fabricate, alignment
of small bore pipe at fabrication shop area, expediting of materials.
Pipe Fitter Sep 2003 - Jan 2004
EEI Corp • Batangas, Philippines

Fabricate small bore and big bore carbon pipe and a stainless pipe as per isometric drawing,
cutting, grinding, beveling, fit-up, lay-outing, erection of pipe, installation of supports, u-bolt,
hanger rod supports, and alignment.
Pipe Fitter Mar 2000 - Mar 2003
EEI Corp • KSA, Saudi Arabia

Erection of 24’’ heavy wall pipe, fit-up, full welding, installation of hanger spring rod, pipe clamp
supports, fabricate small bore, big bore, fit-up, full welding, installation of supports, threading
galvanized pipe for air line, installation of pipe and supports, air leak testing, punch listing,
commissioning.
Pipe Fitter Dec 1999 - Feb 2000
EEI Corp • Pasig, Philippines

Hydro testing of high-rise pipeline from the basement to the 27th floor and the top of the building
and hot and cold copper pipelines, repair leakages.
Pipe Fitter Jan 1999 - Nov 1999
EEI Corp • EDSA MANILA, Philippines

Fabricate, fit-up, erection, installation of pipe, supports, hanger of fire protection line, threading of
pipe.
Pipe Fitter Mar 1998 - Oct 1998
EEI Corp • Bataan, Philippines

Fabricate small bore and big bore at fabrication shop area, cutting, grinding, beveling, fit-up, full
welding alignment, pipe jackening, erection, installation of supports at site, hydro testing, punch
listing.

EDUCATION
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Bachelor of Science in Electrical Engineering (UNDERGRADUATE) Jun 1991 - Mar 1996


Saint Peter’s College • Iligan City, Philippines

SKILLS
______________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

• Possessing extensive pipefitting and HVAC experience.


• Demonstrating an ability to supervise a team.
• Showing proficiency in Microsoft Office.
• Being able to do physical work for long hours.
• Being able to work a flexible schedule.

◦ sometric Drawings
• Safety Procedures
• Manpower
• Stainless Steel
• Punch List
• Equipment Layout
• Carbon Steel
• HVAC
• Pipe Spools

• Turnaround
• Chill Water
• Chemical Plant
• Steel Pipe
• Pipe Supports
• Material Take-Offs
• Pipe Systems
• PVC
• Water Treatment Plant
• Hydrostatic Testing
• Project Specifications

• Safety Regulations
• Technical Queries
• Material Availability
• Design Changes
• Gas Plant
• Construction Management

</li></ul>

You might also like