Scope of work:
1) Complete DC Side installation
a. Frame Structures installed
b. Strings/Panel-Panel Connections
c. Piping
d. Cable Laying – Panel to Inverter
e. Connections – Panels to Inverter
f. DC Earthing
1. Panel to Panel
2. Panel to Frame
3. Arrestor to Ground
4. Panel to ground
5. Bore work labor