FOC BREAK details (BACKBONE and DISTRIBUTION) – Phase 1 and Phase 2

Details for FOC Dome Closure

1 . VETERANS AREA (48 CORE BACKBONE) – Phase 1


 Fiber breaks due to fire incident, pulling from its fiber maintenance loop is not possible
because it’s very far from the area, about 5-8meters from each side burned from fire.
Needs 2 pcs of FOC DOME CLOSURE because we will lay 2 pcs of 24 cores FOC for
splicing.
2. CAMINS AREA (48 CORE BACKBONE) - Phase 1
 fiber break due to road widening 48 cores fell down and got damage to vehicles. Pulling
from its loop maintenance is possible. Only 1 Dome Closure is needed.
3. AIRPORT AREA (48 CORE BACKBONE) - Phase 1
 fiber break due to truck accidentally hit the wires and drag all other wires including our
FOC. Pulling from its fiber maintenance loop is not possible because it’s very far from
the area. Needs 2 FOC DOME CLOSURE because we will lay 2 pcs 24 cores FOC for
splicing. Sorry forgot to mention this area.
4. SAN JOSE AREA (48 CORE BACKBONE) - Phase 1
 fiber break due to electrical discharge, FOC got burned about 2 meters from each side,
pulling from its fiber maintenance loop is not possible because its very far from the area.
Needs 2 FOC DOME CLOSURE because we will lay 2 pcs 24 cores FOC for splicing.
5.STA MARIA AREA (24 CORE DISTRUBITION) - Phase 2
 fiber break due to electrical discharge, FOC got burned about 1 meter from each side,
pulling from its fiber maintenance loop is possible. Needs 1 FOC DOME CLOSURE.

A total of 8 FOC DOME CLOSURE is needed.