You are on page 1of 5

ACCOMPLISHMENT REPORT

Date: November 05, 2021 to November 20, 2021

Team members:
 Ronald Ibarra
 Romark Ian Soriño
 Nathan Dela Pedra
 Jobhinel Ibarra

OSP Accomplishment report includes:

 COMBOX replacement
 installation of Cyberpower
 Power strips
 UPS
 retermination of power (due to some areas power terminations are cut)
 Retermination of UTP cable some areas also UTP are cut off
 grinding of combox so that banding band can be inserted.
 Installation of ONT
 Some areas relaying of UTP and service drop wire.

You might also like