You are on page 1of 11

2)

NAVY
CERTIFICATES OF COMPETENCY IN THE MERCHANT

MARINE ENGINEER OFFICER


STCW 78 as amended MANAGEMENT ENGINEER REG. I/2 (UNLIMITED)

040-36 ENGINEERING, SYSTEMS AND SHIP'S DRAWINGS


WEDNESDAY, 29 MARCH 2023

1315 1615 hrs

Materials to be supplied by examination centres.


Candidate's examination workbook
Graph paper

Examination Paper Inserts


DRG 125
DRG 126
DRG 1277
DRG 128
DRG 129

Notes for the guidance of candidates


1. Examinations administered by SQA on behalf of the Maritime &Coastguard Agency
2. Candidates are required to obtain 50% of the total marks allocated to this paper to
gain a pass AND also obtain a minimum 40% in Sections A and B of the paper.

3. Non-programmable calculators may be used.

4. All formulae used must be stated and


the method of working and ALL intermediate
steps must be made clear in the answer.

Maritime &&
Coastguard
I Agency
XSQA
ENGINEERING, SYSTEMS AND SHIP'S
DRAWINGS
Attempt ALL questions

Marks for each


part question are shown in
brackets
All formulae used must be stated and the method of working and ALL intermediate steps
must be made clear in the answer.

Section A
1. DRG.125

(a) State what EACH of the following items are and describe their function in the
illustrated system:

(1)

FCP37
(2)

(ii) FCP63

(2)

(ii)

TL (2)

main HT and IT tomnor


(b) Using drawing references, identity,thethe erature
where inlet flows to the re.
regulating valves, describing
come from. (4)

[oVER
2.
DRG.126
(a) State what item 15 is and describe its function. (2)

(b) State what item 105 & item 106 are and describe their function. (2)

c)State the item numbers of the wear rings and describe their function. (2)

(d) Describe, using drawing references, how the shaft is vertically located in the
(4)
casing.

3. DRG.127

State what EACH of the following items indicate on the attached illustration.

(a)

(2)

(b)

(2)

(c)

P-ONLY (2)

(d)4H DECK (9.675i .


A/B)
LiiTT*T (2)

e)

O4 L
(2)
4. DRG.128

(a) State what EACH of the following items are and describe their functiom inuthe
illustrated system:

T (2)

(ii)
PIAL
DCS
4-PX-43
(2)

iii)

A102V
(2)
(b) The control air pressure low alarm has been activated and both compressors
1 and 2 are running.

Describe the immediate action that can be taken to give more time to
investigate the cause and what the possible causes may be. (4)

[oVER
5.
DRG.129
(a) State what the following items are and describe their function in the
illustrated circuit.

"
K3
2.7

(2)

(ii)

(2)
(iii)

(2)

(b) What is achieved when contactors K1 and K2 are changed over. (4)
SectionB
6. DRG.127

(a) Describe how you would


the supplied illustration. ascertain
a n the
the approximate
approximate length of
length of the
the vessel from
ves> (5)
(b) State the number of
rudders the vessel has and
ascertained. describe now
(5)
(c) The vessel has been
unscheduled dry dock experiencing
inspection.
problems which has necessitated an
identified between frames 17 and 24, onA the
significant indentation has been
bottom of the hu.
Describe the problems the vessel
location of the may have been experiencing due to
indentation,
complications evident on the drawingusing
and drawing the
references,
that influence explain
complexity, the
duratiorn
and cost of the repair.
(15)

7. DRG.126

(a) Having removed the complete pump assembly to a safe location,


using drawing references, the procedure for dismantling the pump describe,
assembly
for overhaul to enable replacement of that
to increased wear.
components are generally subject
(15)
(b) Describe, using drawing references, the procedure to replace components
that would normally require replacement during a complete mechanical
overhaul, detailing what checks would be carried out during the overhaul. (10)
1et ettb), 7uly 22(6)
DRG. 125
SHORE
C p C P 1
CONNECTIONS
FCP17 CHEMICAL
DOSING KEY
PROVISIONN
FCP76 REFRIGERATiON FCP17 HIGH TEMPERATURE SYSTEM
CONDENSER No. AIR CONDITIONING FCP73
FCP16 FCP69 REFRIGERATION
FCP21
LOWTEMPERATURESYSTEM
CONDENSER No.1 AIR LT/HT FRESHWATER FCP20 THERMOSTATIC MEASUREMENT
FCP16 FCP72 EXPANSION TANK
8 FROM HYDROPHORE
CONDITIONING SYSTEM
FCP16| O) FCP27
F FCP17 m
FCP74 FCP17 FCP25 FCP23
PROVISION CP70
FCP7S REFRIGERATION
EcONDENSER No.2
AIR CONDITIONING
REFRIGERATION
FCPp CP22
FCP16 ONDENSER No.2
FCP162
ORIFICE FOR ADJUSTMENT OF
FCPO tcPso FCP17 FCP18
TO BE OPENED DE-AERATING
COOLING WATER PRESSURE
WHEN THE TANK
HOT WELL KEFILLED 3m, F
FCP5S P CARGO HEATING
FCP17
DUMP
URBOCHARGER FCP19
CONDENSER
FCP16 . AER FROM ay ne
- FW
GENERATOR

HYDROPHORE SYSTEM
FCP16 nth y
2FCP16 ME HT
COOLING WATER
PUMPS 1AND 2 FCP78
MEHT FCP6
FCP63 FCP17 FCP2 PREHEATER
P13 NO. CP7
MAIN ENGINE
PORT
HOT NCP
FCP
FCP62 X
WELL
FCP14
FCPIa FCP42
CP4
FCP17 CP17 P) P
TE FCP FCP32 FCP35
X
FCP38
XfCP55FCPS2 FCP53 FCP45 MAIN LT MAIN LT
FCPS6 FFESHWATER C WATER
FCPS4 A_ CENTRAL COOLER
FCP33
ME LUB OIL cENIRALLER
COOLER FCP44 NO.
ME I FCP39
NO.1
FCP16
FCP16 COOLIN
WATER
TR
FCP16 PUMPS
FCP40 FCP43
G C P 3 4
FEP49 FCP448
LT PUMP FCPSO
XHT PUM 1LT PUMP FCP48
TL K X
L DIESEL GENERATOR No.2
L DIESEL GENERATOR No. 1 INTERMEDIATE SHAR
STEADY BEARING
TR
00496.01
(

N
oLY CONFIDENTIAL
y Confirmation Form
mpleted
eany necessary ma
ng it with you, te may be
Home Ad
Mandir, House N
03
Jhansi, L
ddre
Hon e
Moblle
Exam Date co
27/03/2023 V
29/03/2023
30/03/2023
30/03/2023
31/03/2023
olease not atte
do
eed for the spe
(ou as proof or
2(6), y 22(6)
DRG.127 GHLY CONFIDENTIAL
y Confirmation Formn
ENGINE R0OM NO.4 CARGO TANK ompleted an
ring it with necessary manc
you, it may be
L ON4OT
us
SUNKENDECK T
NO Mandir, HomeAddre
SZG DECK 554 D03 House N0:
. .
(15,240 A/B) Jhansi, Ut
Address T
155 Home Ph0
Mobile Ph
o.019 AR
17 Exam Date Camp
S5)
27/03/2023 West
9/03/2023 West
41 L . 41L 30/03/2023 West
55L--01AA45 Y
30/03/2023 West
31/03/2023 West
96751 please do not
i-id LHJIIITII attend.
A
eed for the
specific e
you as
proof of ID.
TTTTTTITTL
-
LLL.
CENTER LINE
T
22r
ILITT BOTTOM
ANGENT UNE
1
-
- -. AT
225
e-ONL L.
20 29
L.
-ONLY 75
s
400
O.05 L O.075 LY 0.1 0.15 L 0.2 0.25 L
FRAME SPACING: 800 2.600 FRAME SPACING 3.300
15 9 1 2501O10/15 LA 45581 2509010/IS IA
L40-431 500027 A NO 38431I50100x12/17 1A
NO 171 425s12:150«14 FBT Lo 27--41 109A10013/18 IA
NO 19 1 425x11:150%14 F.A(I)
DRG.128
HA129V XA128V A234VHX
No.1 Boiler FO 5u
Solenoid Valve Board PS
No.1 Boiler BOG Con rBOG No.2 Boiler FO 61.5/15bar PRV No.15 Blower
KA137V 127V
Control vaive o n t o l vave
Control Vave DranstonValve 61.5/15bar PRV KG S K 10/6bar PRV For
No.1 Boiler BOG
198VA194 A T (Soot Blower)
Boller Fo Heating Steam Boiler
Cut Off Piston valvee No.2 Boiler BOG No.2 Boiler FRW Auxiliary Steam A168VA163V
A199VA195V
Cut On Piston valve8 Control vave No.1 Boiler O, Meter Gontrol Valve K.
esupemeater DXG HD- Plasma Trip
No.1 Boiler Bumer N. H No.2 B01ler Bumer N,2 No.1 Boiler FO A185V A 1.8bar/722mmHG Boiler Feed Water Pump A1 Control Valve
A169V
A228V Equipment
No.1 Boiler Gas Burner| (RIVERS
Furge Piston valves 200VA196 Purge Pislon valves ontrol Valve T Dump Valve Recirc. Water shu-ofValve To Inert Gas No.1 BoilerAlomising
Steam
S 61.5/15bar PRV Solenoidvalve Boar ana
No.1 Boiler Gas Line NT No.2 Boiler Gas Line No.2 501eroot Blower A1TV Generator Piston Valves A172V 12 (Distiling Plant)
Vent Piston Valve S
A201V
2N Vent Piston Valve e r valve FRw G No.2 Boiler O, Meter NO-Drain Piston Valve KIC No.2 Boiler Atomising T To N, Generator
Soot Blov A187V A180V A190V Steam Piston valves 66V nstrument Air
K Water Fog Pump Main Turbine Drain Valves
A139V InletPiston Valve
vaive 15bar Steam Line for HP 1st Stage K PK 15.5/5bar PRV
A141V A189V No.1 Boiler FO Burmer PS
HA219V Deaerator LCV-Xd IDX Deaerator LCV Level Transfer for
AX Oompressed Air dolenoid valve Board
(Make-Up) A146V A147V (Spill) 3rd Stage FW heater
A109
No DG Engue
No.1
No.1 FD Fan Drive Unit A132V For
G K No.2 FD Fan Drive Unit K - OMD Compressed Air Boiler
A153VA152V A218V A239V A133V No.2 DG Engine - Trip
No.2 Boiler Gas Bumer (RIVERS
A218V Solenoid valve Board and
lon Exchanger A21 DKBAYELSAOnly)
HA126V 124V HA123V A236V
X Main Turbine ain Turbine
Gland Main Turbine Drain Valve kK
uDncaung Ol Temperature Steam controi vaive TOr Manoeuvnng vaive 5.0/1.8bar
PRV
LO Purifier+ G
A157V Control valve A140VA134V A136V
Atmospheric Drain
ankLCV 19/15.5bar
A130V PRV
FWLow Pressure
Heater LCV-KC a No.1 GT Gland
Steam Controller
Main Turbine Asten Spray D 5D- 5.0/0.1barPRV
48V A144V Water Piston Valve
A160V A131V
No.1 FW Generator K No.2 GT Gland Main Turbine Manoeuvring e
M d Bilge Wells Heating Steam Control valve
A149V A145V Steam Controller
A161V Shut Off Valve (S)
Valve Control Á143V
4-PS-93(PS) Set at 9.9bar
No.2 FW Generator
Heating Steam Control Valve
- Central FW Cooling
Water Temperature CV To Accommodation
H -Mid Bilge Wells 4-PS-92 (PSs To Funnel
150V A 138V
Shut Off Valve (P) Oily Water Separator N Air Purge Type
FA162V Solenoid Valve 42 238 LG (HFO Overflow Tank) A237V
A216V 4-PS-33 (Ps Main Condense T -PX-4 A
Foe ESDS) LO Fire Damper for
(PI*****************************.
A159V
A151VElevator Trunk No.2 Air Dyer A213V
Control Air Reservoir XA214 (250nm/h)
Water Separator
-P (7.5mh x9.9bar) Near Fire
Damper
Desiccant
3978 PL-13
4-PX43 X ECR For Boeps RIVVERS
Fire Only)
Damper (RIVERS
Oniy)... *****"
(PS) TAp oiler
No.2 - A170V A171V
A102V N2 A220V A221V A113V A112V A114V
No.2 Air Dryer
(250nmm) To Inert Gas
Desiccant Generato
AA18V
Key No.1 Air Dryer
No.1
huK- (250nm/h)
YA121V
A101V A222V A223 Air Desiccant
A231v A122v
A118V
X-
AA119V T
Electrical Signal
Control Alr Compressors 1&2 A116Y A115V A11TV ***
(350m9/h x 9bar) From
lroystem ******* Instrumentation
P-12
No.1 Air Dryer P) (S)
(250nmh)
T o Bilge Well Desiccant DCS To Cargo
Control System
4-PX-49

You might also like